#REDIRECT [[RBG-23914, Forwards Rev 4 to Preservice Insp Plan Submitted on 841105. Submittal Contains 860512 Relief Request & Text Changes Identified for Rev 4.Fee Paid,Per RM Diggs 860609 Request to Cahill]]
| number = ML20206J132
| issue date = 06/20/1986
| title = Forwards Rev 4 to Preservice Insp Plan Submitted on 841105. Submittal Contains 860512 Relief Request & Text Changes Identified for Rev 4.Fee Paid,Per RM Diggs 860609 Request to Cahill
| author name = Booker J
| author affiliation = GULF STATES UTILITIES CO.
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000458
| license number =
| contact person =
| document report number = RBG-23914, NUDOCS 8606270014
| package number = ML20206J138
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
| project =
| stage = Request
}}
 
=Text=
{{#Wiki_filter:. .
* O GULF STATES                          UTILITIES COMPANY RIVER BEND STATION    POST OFFICE BOX 220    ST. FRANCISVILLE, LOUIslANA 70775 ARE A CODE 504    635 6094      346 8651 I
June 20, 1986 RBG- 23914 File Nos. G9.5, G9.8.6.2, G12.5.1 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.            20555
 
==Dear Mr. Denton:==
 
River Bend Station - Unit 1 Docket No. 50-458 Enclosed for your review is complete Revision 4 to the Gulf States Utilities Company (GSU) .Preservice Inspection                                            (PSI) Plan submitted to Mr. H. R. Denton (Nuclear Regulatory Commission -
NRR) from Mr. J. E. Booker (GSU) on November 5, 1984 (GSU Letter No. RBG-19359).              This submittal includes the Relief Request                                              '
submitted to you on May 12, 1986 (ref. RBG-23665) as well as all text changes identified for Revision 4. Please find enclosed a check for $150 for the application fee requested by your office in a letter dated June 9, 1986 to Mr. Cahill from Reba M. Diggs, Facilities Program Director, License Fee Management, Office of Administration.
Sincerely, J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group Enclosure JEB/    /D  /je A
a 8606270014 860620 PDR    ADOCK 05000458 G                      PDR i    10 1
Red d 4Hw' W***
 
e RDODRD OF RECEIPT E    W d. Rea.d DATE:
g tan c. O '2 ,LC) 2 4 ,
NUCLEAR PIAVT LNGINEERING PRE-SERVICE IlcFELnCN/ PUMP                      '
AND VALVE TE. STING PLAN, i
Controlled Copy Number            5 Attached are the following items for your copy of the Nuclear Plant Engineering Pre-Service Inspection / Pump and Valve Testing Plan:
Preservice Inspection Plan - Revision 04 See attached page for change's Please insert the enclosed material into your document and rmove and discard material it supercedes. Sign and return this Record of Receipt to the Supervisor-Engineering Administration, Nuclear Plant Engineering, Engineering Annex.
DATE:
SIGNED Nuclear Plant Engineering records indicate the person identified above If such is not as both the current and correct document custodian.
accurate, please correct the Record of Receipt accordingly.
NuPEF-018 11/84                                                                        :
9
 
Preservice Inspection Plan - Revision 04 Delete Revision 03 and insert Revision 04, with the following exceptions:  .
Appendix "A"    - Color-coded P&ID's in Revision 03 will be retained in Revision 04.
There    have          been no changes made in this Appendix.                              .
Appendix "G" - Reactor Pressure Vessel examinations in Revision will be retained in Appendix "G-1" of 03
* Revision 04.
This revision to the Preservice Inspection Plan has been made to incorporate    changes      that    were made after empleting preservice examinations on piping, cmponents, and supports prior to the N-5 Forms sign-off. These changes reflect typographical errors, weld changes, and terminology to express empletion of preservice examinations prior to the N-5 Forms sign-off. Any further preservice examinations performed, resulting frm the Repair and Replacement Program, will be incorporated                                                      ,
in the Inservice Inspection Plan.