ML20206N175: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20206N175 | | number = ML20206N175 | ||
| issue date = 04/30/1999 | | issue date = 04/30/1999 | ||
| title = Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With | | title = Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With | ||
| author name = Diprofio W, Nardone P | | author name = Diprofio W, Nardone P | ||
| author affiliation = NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) | | author affiliation = NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NYN-99052, NUDOCS 9905170159 | | document report number = NYN-99052, NUDOCS 9905170159 | ||
| title reference date = 05-06-1999 | |||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 5 | | page count = 5 | ||
Revision as of 06:35, 6 December 2021
| ML20206N175 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/30/1999 |
| From: | Diprofio W, Nardone P NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-99052, NUDOCS 9905170159 | |
| Download: ML20206N175 (5) | |
Text
['
m,,,,
North Atlantic Energy Service Corporation 1
a North v.o. nex am sea""' N" o3874 i
i7 Atlantic (603) 474-9321 The Northeast Utilitien Sptem 1 I
May 6,1999 j i
Docket No. 54143 NYN-99052 United States Nuclear Regulatory Commission Attention: Document Control Desk l Washington, DC 20555-0001 Seabrook Station April 1999 Monthly Operating Report Enclosed please find Monthly Operating Report 99-04. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of April,1999 and is ;
submitted in accordance with the requirements of Seabrook Station Technical Specification l 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 773-7194.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
bELLA 'I W. A. DiProlio[
Station Director cc:
H. J. Miller, NRC Region I Administrator
}
J. T Harrison, NRC Project Manager, Project Directorate 1-2 R. K. Lorson, NRC Senior Resident Inspector 9905170159 990430 PDR
'G'G R ADOCK 05000443 PDR
OPERATING DATA REPORT DOCKET NO. 50-443 UNIT Seabrook 1 DATE May 1,1999 COMPLETED BY P.E. Nardone TELEPIIONE (603) 773-7074 OPERATING STATUS
- 1. Unit Name: Seabrook Station Unit 1
- 2. Reporting Period: APRIL 1999
- 3. Licensed Thermal Power (MWt): 3411
- 4. Nameplate Rating (Gross MWe): 1242
- 5. Design Electrical Ranng (Net MWe): 1148
- 6. Maximum Dependable Capacity (Gross MWe): 1204
- 7. Maximum Dependable Capacity (Net MWe): 1158
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report, Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWe): None
- 10. Reasons For Restrictions, If Any: Not Applicable This Month Yr-to-Date Cumulative i1. Ilours in Reporting Period 719.0 2879.0 1008 % .0
- 12. Number of flours Reactor Was Critical 0.0 2044.7 66107.6
- 13. Reactor Reserve Shutdown flours 0.0 0.0 953.3
- 14. Ilours Generator On-Line 0.0 2040.4 63567.7
- 15. Unit Reserve Shutdown flours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 0.0 6908315 211068688
)
- 17. Gross Elec. Energy Generated (MWil) 0.0 2444884 73802831 ;
i
- 18. Net Electrical Energy Generated (MWil) 0.0 2352764 70938849 l
- 19. Urut Service Factor 0.0 70.9 81.6
- 20. Unit Availability Factor 0.0 70.9 81.6
- 21. Unit Capacity Factor (Using MDC Net) 0.0 70.6 79.5
- 22. Umt Capacity Factor (Using DER Net) 0.0 71.2 79.9
- 23. Unit Forced Outage Rate 0.0 0.0 7.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Refuel'ug,03/27/99, 45 dap j and Duration of Each): 1
- 25. If Shut Down At End Of Report Period, Estimated Date of Restart. 05/11/99 Startup:
1
- NOTE: " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operaton began. l increased MDC values (Itens 6 & 7) starting 12/01/95.
Updated item 4 per NUREG4020 in July 1998.
1 of 4 l
l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 UNIT Seabrook i DATE May 1,1999 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074 MONTH APRIL, 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0
+
13 0 29 0 14 0 30 0 15 0 -
16 0 -
INSTRUCTIONS On this fornn* list the average da ly unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
2 of 4
T N
E V
E R _
P1 Ofo 4 T 1 e 7 Ne 9 n 0 Og a i 9 9
o 7-dr I -
k o
1 a
3 7 TP 3 o 1 N 7 C 4
b r ) A 4
0 a
e y
a E.
3 0 EE '
E 5 S M P 6
( VC I
N N A O RO T
E U D DE l I
P OC K T CE
- C E EL R O
L P E &
D M T E S
O U C A C
T N
E S V# _
N ET _
O E R A I
T E
SP NE ER O /
N -
C C U I L
D E h0
)
R t n=
o R G mno _
E Ni si ua t W a 'R aO i
or u v
eD O bT r (
P iC l
mpno) 4 SA D FE 4 a mrca mimotc a r
f o
N OR rSf ul c d p 3
A DN Si tcd e x a eREu S OW I
laa l
- uu mienr( r I O nnotnwe N TD E txaa u
t uood W M dMMACPO e - - - - - -
O M1 23459 D 3 T
U I 2 I N n S O i o
t S C a T A i n
I E m N R a x
U E
) e i
n s n
)
n a e i a
lp c lp N)
OS E x nL o
i x
t i& E T R I ( s 0 t (
e e c A U 9 ig r 1 rT u r r t n o RO I 7 l ia o si ei n r )
r n UI D( Fe c Ra ieEil r
v t lap a
tnn e a ntor gryT a r nx mnia oi i( ts toe pt elel taina r in uiu ur r e f ge meh nqa o e e pd pt
'E sEMRROAOO P S a - - - - - - - -
Y e RABCDEFGI I T
2 9
9 E 9
/
9 9
T 1 1 A 0
/
L, D 4 0
I d
R dedleu P
A c e r h oc 1 3 FS 1
T O. 4 9
N N 9 : :
FS O I M
l*
','. REFUELING INFORMATION REQUEST O DOCKET NO. 50 443 UNIT Seabrook i DATE May 1.1999 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 1, Name of Facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Refueling Outage 6, 03/27/99
- 3. Scheduled date for restart following refueling: Refueling Outage 6, 05/10/99 [ 45 days ]
i
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? )
N/A
- 5. Schedule date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a) 193 ~(b) 456 (c) 0
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been ;
requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 i No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
4 of 4