ML20207N407: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20207N407 | | number = ML20207N407 | ||
| issue date = 09/30/1988 | | issue date = 09/30/1988 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Nonconformance in Insp Rept 99900100/88-01 | ||
| author name = Brach E | | author name = Brach E | ||
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| Line 12: | Line 12: | ||
| case reference number = REF-QA-99900100 | | case reference number = REF-QA-99900100 | ||
| document report number = NUDOCS 8810190130 | | document report number = NUDOCS 8810190130 | ||
| title reference date = 08-30-1988 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE | ||
| page count = 3 | | page count = 3 | ||
| Line 26: | Line 27: | ||
==Dear Mr. Segen:== | ==Dear Mr. Segen:== | ||
Thank you for your letter of August 30, 1988, in response to our letter dated August 1, 1988. We have reviewed your reply and find it responsive to the con-cerns raised in our Notice of Nonconfomance. We will review the implementation of your corrective actions during a future inspection to detemine that full compliance has been achieved and will be maintained. | Thank you for your letter of August 30, 1988, in response to our {{letter dated|date=August 1, 1988|text=letter dated August 1, 1988}}. We have reviewed your reply and find it responsive to the con-cerns raised in our Notice of Nonconfomance. We will review the implementation of your corrective actions during a future inspection to detemine that full compliance has been achieved and will be maintained. | ||
We have no further questions at this time and will review your corrective action and preventive Reasures during a future inspection. | We have no further questions at this time and will review your corrective action and preventive Reasures during a future inspection. | ||
Sincerely. | Sincerely. | ||
Revision as of 16:38, 5 December 2021
| ML20207N407 | |
| Person / Time | |
|---|---|
| Issue date: | 09/30/1988 |
| From: | Brach E Office of Nuclear Reactor Regulation |
| To: | Segen R LIMITORQUE CORP. |
| References | |
| REF-QA-99900100 NUDOCS 8810190130 | |
| Download: ML20207N407 (3) | |
Text
_ _ _ _ _ _ _ _
' [.
o,, UNITED STATES
[ g NUCLEAR REGULATORY COMMISSION
- wassisoros. o. c. rosss k.....,/ septensber 30, 1988 '
Docket No.: 99900100/88-01 Mr. R. D. Segen Quality Assurance Manager tiraitorque Corporation 5114 Woodall Road Post Office Box 11318 Lynchburg, Virginia 24506-1318
Dear Mr. Segen:
Thank you for your letter of August 30, 1988, in response to our letter dated August 1, 1988. We have reviewed your reply and find it responsive to the con-cerns raised in our Notice of Nonconfomance. We will review the implementation of your corrective actions during a future inspection to detemine that full compliance has been achieved and will be maintained.
We have no further questions at this time and will review your corrective action and preventive Reasures during a future inspection.
Sincerely.
U E. William Brach, Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation s'1
~~
q_ .
a 1 03 sst0190130 880*30 /
FDR OA999 ENVLMIT PDC s
99900100 /
Ccptcuber 20, 1988 Mr. R. D. Segen DISTRIBUTION:
RIDS Coos IE:09, VIB Reading--
DRIS Reading BGrimes EWBrach UPotapovs JJacobson VIB:DRIS* SC:VlB:DRIS* BC 1pDRIS JJacobson:jh UPotapovs EW ach 09/29/88 09/29/88 y/g/38
September 20, 1988
, Mr. R. D. Segen ,
DISTRIBUTION:
RIOS Code IE:09 VIB Reacing DRIS Reading BGrirnes EWBrach UPotapovs JJacobson e
VIB:DRIS* SC:VIB:0RIS*
JJacobson:jh UPotapovs BC(d'ch EWB 19 DRIS 09/29/88 09/29/88 //p/88