ML20215G903: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[AECM-86-317, Monthly Operating Rept for Sept 1986]]
| number = ML20215G903
| issue date = 09/30/1986
| title = Monthly Operating Rept for Sept 1986
| author name = Hobbs S, Kingsley O
| author affiliation = MISSISSIPPI POWER & LIGHT CO.
| addressee name = Taylor J
| addressee affiliation = NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000416
| license number =
| contact person =
| document report number = AECM-86-0317, AECM-86-317, NUDOCS 8610210170
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 4
}}
 
=Text=
{{#Wiki_filter:.
DOCKET NO.                50-416 DATE          10/10/86 COMPLETED BY          S. H. Hobbs TELEPHONE          601-969-2458 OPERATING STATUS
: 1. Unit Name: GGNS UNIT 1                                    l Notes:                          l
: 2. Reporting Period: September 1986                          l                                  l
: 3. Licensed Thermal Power (MWt): 3833 MWt                    l                                l
: 4. Nameplate Rating (Gross MWe): 1372.5 MWe                  l                                  l
: 5. Design Electrical Rating (Net MWe): 1250 MWe              l                                  l
: 6. Maximum Dependable Capacity (Gross MWe): 1157 MWe        l                                  l
: 7. Maximum Dependable Capacity (Net MWe): 1108 MWe          l                                  l
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasens:
N/A
: 9. Power Level To Which Restricted, If Any (Net MWe):                N/A
: 10. Reasons For Restrictions, If Any:
This Month          Yr to Date        Cumulative
: 11. Hours In Reporting Period                        720              6,551            17,049
: 12. Number of Hours Reactor Was Critical            120              5,456.2          12,181.4
: 13. Reactor Reserve Shutdown Hours                    0                    0                0
: 14. Hours Generator On-Line                          102.6            5,308.7    ~
11,055.7
: 15. Unit Reserve Shutdown Hours                      0                    0                0
: 16. Gross Thermal Energy Generated (MWH)            291,576          14,593,273        30,549,766
: 17. Gross Electrical Energy Generated (MWH)          82,380          4,330,510          9,102,820
: 18. Net Electrical Energy Generated (MWH)            77,409          4,096,918          b,572,630-
: 19. Unit Service Factor                              14.3                81.0              73.0
: 20. Unit Availability Fector                        14.3                81.0              73.0
: 21. Unit Capacity Factor (Using MDC Net)              9.7                56.4              55.6
: 22. Unit Capacity Factor (Using DER Net)              8.6    ""
50.0              49.2
: 23. Unit Forced Outage Rate                          14.5                10.8              10.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
The units first refueling outage began September 5, 1986 and is expected to i.ontinua until November 8, 1986.
: 25. If Shut Down At End Of Report Period. Estimated Date          of Startup:  ,_
11/08/86
: 26. Units In Test Status (Prior to Commercial Operation).
Forecast            Achieved INITIAL CRITICALITY                                      08/18/82 INITIAL ELECTRICITY                                      10/20/84 COMMERCIAL OPERATION                                    07/01/85 0610210170 061010 16 DR  ADOCK 0500 J16AECM86100701 - 3                                                                          'l i('    \
 
r-l-
i l                                                  DOCKET NO. 50-416 UNIT                                            1 DATE 10/10/86-COMPLETED BY S. H. Hobbs TELEPHONE 601-969-2458 MONTH        September 1986 DAY        AVERAGE DAILY POWER LEVEL  DAY      AVERAGE DAILY POWER LEVEL (MWe-Net)                            (MWe-Net) 1    ,
49                    17                                                          0 2              622"                    18                                                          0 3              905                    19                                                          0 4              906                    20                                                          0 5              743                    21                                                          0 6                0                    22                                                          0 7                0                    23                                                          0 8                0                    24                                                          0 9                0                    25                                                          0 10                0                    26                                                          0 11                0                    27                                                          0 12                0              _
28                                                          0 13                0                    29                                                          0 14                0                    30                                                          0 15    _
0                    31 16                0 J16AECM86100701 - 4
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                  o DOCKET NO. 50-416 UNIT NAME      1 DATE 10/10/86          -
COMPLETED BY S. H. Hobbs TELEPHONE 601-968-2458 REPORT MONTH      SEPTEMBER I      1        1    1          1        I              l              l          l          l                                  1 l      l        l    l          l        l Method of    l Licensee      l          l          l        Cause & Corrective        l l No. I Date l Type IDurationl Reason l Shutting Downl Event              l System l Component l              Action              l l      l        l (1) l Hours    l  (2)  l  Reactor    l Report #    l Code    l Code    l        Prevent Recurrence        l l      l        l    1          I        l    (3)        l            l    (4)  l  (5)'  l                                  l l                1    I          I        I                              I          l                                            l 1                1    I          i        l                              I          i                                            l l86-10l08/25/861 F      l  17.4  l  H    l    3        1  86-028    l  ZZ      l  ZZZZZ  l Shutdown continued from the      l
; I      l        l    l          l        l              l              l          l          l inadvertent actuation of the    l l      l        l    l          l        l              l              l          l          l load reject circuitry that'      l l      l        l    l          l        l              l              l          l          l occurred on August 25, 1986. l i      1        l    1          l        1              l              l          l          l                                  l l86-11109/05/861 S      l 600.0    l  C    l    2        l    NA      l  ZZ      l  ZZZZZ  l Refueling Outage. Critical path l l      l        l    l          l        l              l              l          l          l items include Emergency Diesel  l 1      l        l    l          l        l              l              l          l          1 Generator modifications and      l l      l        l    l          l        l              1              l          l          l inspections and SSW loop "A"    l l      l        l    l          l        l              l              l          l          l pump changeout and system        l i i      l        l    l          l        l              l              l          l          l modifications.                  l l      1        1    I          I        I              l              l          l          l                                  1 1      I        I    l          l        l              1              l          l          l                                  l 1                        2                                3                                4 F: Forced                Reason:                          Method:                            Exhibit G - Instructions S: Scheduled            A-Equipment Failure              1-Manual                          for Preparation of Data (Explain)                      2-Manual Scram                    Entry Sheets for Licensee B-Maintenance or Test            3-Automatic Scram                  Event Report (LER)
C-Refueling                      4-Continued                        File (NUREG-0161)
D-Regulatory Restriction          5-Reduced load E-Operator Training &            6-Other Licensing Examination F-Administrative                                                5 G-Operational Error                                                  Exhibit 1-Same Source (Explain)
H-Other (Explain)                  *In accordance with NUREG 1022 J16AECM86100701 - 5
 
o      .
MISSISSIPPI POWER & LIGHT COMPANY E                        Helping Build Mississippi EnkilddiddE          P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39215-1640 October 13, 1986 O. D. K6NGSLEY, JR.
t?!CE PRESIDENT NUCLE AR OPERAflONS                                                          s Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:          Document Control Desk
 
==Dear Mr. Taylor:==
 
==SUBJECT:==
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report AECM-86/0317 In accordance with 10CFR50.36, Mississippi Power & Light Company (MP&L) is providing twelve copies of the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for September, 1986 (attachment).
If you have any questions or require additional information, please contact this office.
Your - ruly, ODK:bms
                                                              //
T f
* Attachment cc: Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Chief (w/2)
Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J
f">
                                                                                                  ,]ev s  \
                                                                                                              \
J16AECM861C0701 - 1              Member Middle South Utilities System}}

Revision as of 00:27, 27 November 2021