ML20237K635: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PM-87-046, Monthly Operating Rept for Feb 1987]]
| number = ML20237K635
| issue date = 02/28/1987
| title = Monthly Operating Rept for Feb 1987
| author name = Dreyfuss J, Steiger W
| author affiliation = LONG ISLAND LIGHTING CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000322
| license number =
| contact person =
| document report number = PM-87-046, PM-87-46, NUDOCS 8708190345
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 4
}}
 
=Text=
{{#Wiki_filter:f                                                                                                        l i
SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL                              i i l
l                                                                                DOCKET No. 50-322        I UNIT        1 DATE 3/2/87 COMPLETED BYJ. Dreyfuss  i TELEP110NE (516)929-8300 MONTH ____ February 1987 I'
DAY AVERACE DAILY POWER LEVEL            DAY AVERACE DAILY POWER LEVEL (MWe-Net)                            (MWe-Net) 1                      0                  17            0                              1 2                      0                  18            0 1
3                      0                  19            0 4                      0                  20 l                                                                        0 5                      0                  21            0 6                      0                  22            0                              1 7                      0                23              0                                I 8                      0                  24            0 9                      0                25              0 10                      0                26              0 11                      0                27              0 l              12                      0                28              0 l
13                      0                29              0 14                      0                30              0 l              15                      0                31              0 16                      0 SPF 51.005.01- 5 Rev. 2 8708190345 870228 DR    ADOCK 0500              2-
                                                                                            #      \\
(                      _ _ _ ,_ __ __        _        _      _                  _ _. _  - _-_ _    a
 
  . o SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET No. 50-322 UNIT    1 DATE 3/2/87 COMPLETED B11. Dreyfuss TELEPHONE (516)929-8300 OPERATING STATUS
: l. Reporting Period: 02/87      Gross hours in Reporting Period 672.
: 2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): 844
: 3. Power Level to which Restricted (if any) (MWe-Net): N/A
: 4. Reasons for Restriction (if any):
!                                                                This month Yr to Date Cumulative
: 5. Number of Hours Reactor was Critical...........          O                                                          n          117.7
: 6. Reactor Reserve Shutdown Hours.................          67?                                                1616              6169.6
: 7. Hours Generator on Line........................          n                                                          n      ,    96_R__
: 8. Unit Reserve Shutdown Hours....................          n                                                          n            n
: 9. Gross Thermal Energy Generated (MWH)...........          n  ___                                                    n        s.Rvin3
: 10. Cross Electrical Energy Generated (MWH)........            0                                                          0          456 l
: 11. Net Electrical Energy Generated (MWH)..........            O                                                          O          250
: 12. Reactor Service Factor.........................          N /A
: 13. Reactor Availability  Factor....................        N/A
: 14. Unit Service Factor............................
N /A
: 15. Unit Availability Factor.......................          N/A
: 16. Unit Capacity Factor (Using MDC)..........~....          N/A                                                            ,_.
: 17. Unit Capacity Factor (Using Design MWe) . . .'. . . . . N/A
: 18. Unit Forced Outage Rate........................          N/A
: 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l Post 5% Power Ascension Test Program Out' age, 9/1/86 - 7/1/87
: 20. If Shut Down at end of Report Period, Estimated Date of Startup: 7/1/87
: 21. Units in Test Status (Prior to Commercial Operation):                                  FORECAST                              ACHIEVED INITIAL CRITICALITY                                                                            2/13/85              2/15/85 INITIAL ELECTRICITY                                                                            9/1/86                8/26/86 COMMERCIAL OPERATION                                                                          9/1/87 SPF 51.005.01-6 Rev. 2 c
 
0                S s
s 3
8                T h
u    -              E f  9                M
_      2        v  2 M
2    7  e  9                O 3    8  r  )
C
        -  1 / D  6                /
_      0    2    1 S
5    /  . 5 3 J  (                N
_      N o
T I
E T
Y B
E N
O O
I T
C N A D  H                A
_    ' T  U D E  P
_      E      T  E                E K      E  L                V
-      C      L  E                I O      P  T                T D      M                    C O
C E
R R
O C
_                      7 8                      .
h t
_    S                                              n N                  9                n O                  1
                                    )    w          o o          m
- NI OT I C v
r a      R 2
(  d t
u        h e
TU                          NOR AD TE SR                    b u
r e
W F ORW O DOO E  h S
d t
g n
TP e
F                          i RR                        D GC        l            r
_ EE                        O NAG      l            u
_ WW                    H  H I EN        o        d OO                    T  T TRI        r PP                    N  E T    C    t          d
_                      O  M UEU        n          e RD                    M      HHD        o          u
- AN                          STE      C            n EA                    T          R    -        i
- L                    R              1          t
_ CS                    O                            n UN                    P NW                    E                            o
_    O                  R              P            c MD                                )  T AT                                1 A            e P            g HU                                (
a E i.l R!                                    %          t
_                                  N  5            u
_ O                                O              O HT S    t e SI                                A    s g        m N                              E    oa          a U                              R  Pt          r
-                                        - u        g l
I  O        o r
                                    )              P NS                t OR                  s I U                e
_                                TO    2          T AH    7
.                                R(    6            n
_                                U                  o D                  i
_                                                    s n
e D                c DE                  s EL                A ECU                  r
.                              PRD                  e YOE      S            w TFH                  o
-                                  C              P
: S
_                                F                  %
S              5
_                                                  t
-                                      1            s E  3            o
_                                  T  8          P A  0
_                                  D  6 8        i Y
R NP O  2
_                                  N
_                                                S
 
n
            , } U.M4.MF1MMM 5d erhMW b thk i.-I$ fM.-f
                          /EC'O f                      LONG ISLAND LIGHTING COMPANY
                #w uw      4,v t sawm w- .
SHOREHAM NUCLE AR POWER ST ATION = P.O. BOX 628
* WADING RIVER, NEW YORK 11792 TE L. (516) 929-8300 '
March 2, 1987                                                                                          PM-87-046' Director, Office of Resource Management U.S. Nuclear Regulatory Commission l
Washington, D.C. 20555
 
==Dear Sir:==
 
l In        accordance with ' Technical Specifications Section 6.9.1.8, enclosed is a copy.of the Shoreham                                            Nuclear          Power Station February Monthly Operating Report which summarizes                                                the operating l
statistics and shutdown experience of the Plant.
If you have any questions, pleas?                                antact us.
Very truly y                        rs, M            e W.E. Stei                    , Jr.                                                                                                  -i Plant Manager                                                                                                                          l WES/km Enclosure cc:          Dr. Thomas Murley, Regional Administrator                                                                                ;
I                          Clay Warren , Senior Resident Inspector                                                                                  '
j Institute of Nuclear Power Operations, Records Center American Nuclear Insurers l
SR-A43.700 l
l l
l 1
f?
g\
F C-8682,2
                                                                                                                              -_:__.--_-__- - - _ N}}

Latest revision as of 17:59, 25 November 2021