ML20246P999: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[AECM-89-139, Monthly Operating Rept for June 1989 for Grand Gulf Nuclear Station,Unit 1]]
| number = ML20246P999
| issue date = 06/30/1989
| title = Monthly Operating Rept for June 1989 for Grand Gulf Nuclear Station,Unit 1
| author name = Cesare J, Edge W
| author affiliation = SYSTEM ENERGY RESOURCES, INC.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000416
| license number =
| contact person =
| document report number = AECM-89-0139, AECM-89-139, NUDOCS 8907200402
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 5
}}
 
=Text=
{{#Wiki_filter:y-                        -                                                            . _ _ _ _        . - -
g' "r                            j.<
                        '. r y;
y W.:          .,
  't ,      ; ; '' 1 f                    ''          i
                    '                                                      EVETEM ENERGY .
RE90tMCEE,INC.
  ?o                        . J JOHN G GSM. JR U .ovecta .
1                              twee ucensny                                ' July 13, 1989
.g                                .U.S.. Nuclear Regulatory Commission Mail Station P1-137
  ~
* Washington,'D.C. '20555 Attention: Document Control Desk qg W                                Gentlemen:
o
 
==SUBJECT:==
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 Licence No. NPF-29 Monthly Operating Report AECM-89/0139
* In accordance with the requirements of Technical Specification 6.9.1.10, System Energy Resources,-Inc. (SERI) is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for June 1989 (attachment).
4                            If you have any questions or require additional information, please contact this office.
JGC:cwg Attachment cc:    Mr. W. T. Cottle (w/a)                                                                  ]
Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)                                                                  l Mr. N. S. Reynolds (w/a)
Mr. B. L. Thomas (w/o)                                                                  i Mr. H. O. Christensen (w/a)
Mr.' Stewart,D. Ebneter (w/a)
Regional ~ Administrator U.S. Nuclear Regulatory Commission Region II
                                          '101 Marietta St., N.W.,      Suite 2900 Atlanta, Georgia 30323 Mr. L.. L. Kintner, Project Manager (w/a)                                                j Office of Nuclear Reactor Regulation                                                    j U.S. Nuclear Regulatory Commission
[,                                        Mail Stop 14B20 Washington, D.C. 20555 l
p                                                        p o (nx 2rm l xxsoN. M;sseps 3922s3070 l ytm cuo210              p_1      l 1
i 8907200402      ADeCK  890630 05000416 ig
                                                              >        a ume smn m co ny                                T l                        nPDR R                        PDR      9                                                      //f
 
pm .                        ';_            ,
y
                          + "E                                                            Attachm::nt to
  ,            ;.;                                                                        AECM-89/0139
          . y-DOCKET NO.          50-416 DATE      07/13/89 COMPLETED BY        W. E. Edge TELEPHONE        (601)437-6472 OPERATING STATUS
: 1. Unit Name: GGNS UNIT 1                                   l Notes:                          l
: 2. Reporting Period:        June 1989                      l
                            '3. Licensed Thermal-Power (MWt):.3833 MWt                    l 4.'  Nameplate Rating (Gross MWe): 1372.5 MWe                  l                                l
                              .5 . Design Electrical Rating.(Net MWe): 1250 MWe              l                              .l 6 '.' Maximum Dependable Capacity (Gross MWe): 1190 MWe        l                                l
:7.~ Maximum Dependable Capacity (Net MWe): 1142 MWe            -l                                l
: 8. . If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last
              "                    Report.' Give Reasons:
N/A
: 9. Power Level To Which Restricted, If Any (Net MWe):              N/A                      _
: 10. Reasons For Restrictions, If Any:        N/A This Month        Yr to Date      Cumulatia II. Hours In Reporting Period                          720            4,343.0          41,145.1
: 12. Number of Hours Reactor Was Critical              720            2,853.2          30,903.t
: 13. Reactor Reserve Shutdown Hours                                                                              '14. Hours Generator On-Line                            692.5          2,719.2          29,148.f 15.. Unit Reserve Shutdown Hours                                                                                  16. Gross Thermal Energy Generated (MWH)-          2,525,580        9,718,538        96,174,95
: 17. Gross Electrical' Energy Generated (MWH)        823,510          3,168,160    ,30,322,95C
: 18. Net Electrical Energy Generated (MWH)'            790,620        3,040,146      28,931,85'
: 19. Unit Service Factor                                  96.2              62.6            74.<
2G. Unit Availability' Factor                            96.2              62.6            74.<
: 21. Unit Capacity Factor (Using MDC Net)                96.1              61.3            6 8.-(
: 22. Unit Capacity Factor.(Using DER Net)                87.8              56.0            61.f
                              '23.-Unit Forced Outage Rate                                                          5.1
                            .24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
None
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
: 26. Units In Test Status (Prior to Commercial Operation).
Forecast          Achieved INITIAL CRITICALITY                                    08/18/82 INITIAL ELECTRICITY                                    10/20/84 COMMERCIAL OPERATION                                    07/01/85 L                              PCOM H0 OPT REPORT JUNE 1989 - 2 L
a
 
                .  ,      .                                                Attachm:nt to
        .                                                                  AECM-89/0139 DOCKET NO.            50-416 DATE      07/13/89 COMPLETED BY        W. E. Edge TELEPHONE        (601)437-6472        {
OPERATING STATUS
{
: 1. Unit Name: GGNS UNIT 1                                    l Notes:                        l  l
: 2. Reporting Period:          June 1989                      l                                l  l'
: 3. Licensed Thermal Power (MWt): 3833 MWt                    l                                l
: 4. Nameplate Rating (Gross MWe): 1372.5 MWe                  l                                l
: 5. Design Electrical Rating (Net MWe): 1250 MWe              l                                l  l
: 6. Maximum Dependable Capacity (Gross MWe): 1190 MWe        l                                l  l
: 7. Maximum Dependable Capacity (Net MWe): 1142 MWe          l                                l  !
: 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last                    1 Report. Give Reasons:                                                                        !
N/A                                                                    ]
1
: 9. Power Level To Which Restricted, If Any (Net MWe):              N/A
: 10. Reasons For Restrictions, If Any:        N/A Ii
                                                                                                                    )
l This Month        Yr to Date        Cumulative  j i
                                                                                                                  ^
: 11. Hours In Reporting Period                          720            4,343.0            41,145.0
: 12. Number of Hours Reactor Was Critical              720            2,853.2            30,903.4
: 13. Reactor Reserve Shutdown Hours                                                    j
: 14. Hours Generator On-Line                            692.5          2,719.2            29,148.8  j
: 15. Unit Reserve Shutdown Hours                  __
: 16. Gross Thermal Energy Generated (MWH)          2,525,580        9,718,538          96,174,953
: 17. Gross Electrical Energy Generated (MWH)          823,510        3,168,160        30,322,950
: 18. Net Electrical Energy Generated (MWH)            790,620        3,040,146        28,931,857  ;
: 19. Unit Service Factor                                96.2              62.6              74.4  l
: 20. Unit Availability Factor                            96.2              62.6              74.4  l
: 21. Unit Capacity Factor (Using MDC Net)                96.1              61.3              68.6  l
: 22. Unit Capacity Factor (Using DER Net)                87.8              56.0              61.8  j
: 23. Unit Forced Outage Rate                                          -0    _
5.5 1
: 24. Chutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
: 26. Units In Test Status (Prior to Commercial Operation).
Forecast          Achieved
                                                                                                                    ]
INITIAL CRITICALITY                                    08/18/8_2_
INITIAL ELECTRICITY                                    10/20/84 COMMERCIAL OPERATION                                  07/01/85 I
i l
l PCOM M0 OPT REPORT JUNE 1989 - 2                                                                    l
 
Attachment to.
(_
AECM-89/0139 h'
l DOCKET NO. 50-416 UNIT  1
,.                                                                          DATE 07/13/89 f                                                                    COMPLETED BY W. E. Edge TELEPHONE 601-437-6472 MONTH  June  1989 DAY      AVERAGE DAILY POWER LEVEL    DAY-  AVERAGE DAILY POWER LEVEL.
t (MW, -Net)                        (W,-Net) 1                    0                      17            1194 2                  365                      18            1190 0
5                  979                      21            1187 6                1198                      22            1192 7                1204                      23            1193 8                1198                      24            1189 9                1203                      25            1192 10                    1195                      26            119'i 11                    1170                      27            1185 12                    1191                      28            1197 13                    1193                      29            1191 14                    1201                      30            1191
                                                                                                ]
15                    1208                      31                      __m, 16                    1210                                                ,_
J i
i 4
1 Y
i I
PCOM MO OPT REPORT JUNE 1989 - 3 l
 
1 ji.1 l                    iji
  '                                                    illllllllll f
                      ~-
                            ~
g'
                      '                                                                n i
                            *. .                                                        t 2
a t n oo ri t
f a                e e        e              ol        s      e e                v        c                u      n  as g  2            i          n~            t c        o  tn d 7              t          e              nr        i    ae                      e E 4              c        r              ei        t  Dc                        c o
t9 6
e'o r        ur              mc ee c
u i                    r u~
                                                .  -                                                  fL) 3                6            E  7            rTc~                    cr .      r  o    R)                o t1                  1                3            o        e              a        t        rE1                S n0                  4 W
                                                . 4            CnR o
l  r 'B    s  noL6 e/                    -  1            -                                    po        n  of(1                    e m9 h8 0
5 9
8 Y0 1            &it t n ef' r    &
I  i t st -
0              m a
c-                          /    B6                ece                        s        -  at rG                  S' M                  . 3                      sAv                                    reoE                    -
tC tE OE1 NM/EN DE                u a
e r
dule 'A ei        G    a e pR ph e U 1
AA TN0EH A7      TO              C        P              nb' ims t
i eSRN r        (
t i
E            LP                                        t ep      b  P yt                    b KTEPE                                                  nsm osu i        rne                i CITML                                                            h    rt el                  h ONAOE                                                  Cap        x  onvi                    x DUDCT                  1lllllllll E  fEEF                    E 4                          5 t
n e
ne) od5 po(                P mC o
C llllllllll m                                          m                          i 9              ee)                                        a 8            td4                  D                      r -
9              so(                A                  mc      d 1              yC                                      aS      a S                                        r        o ccdl e
lllll                          lll Si e n                                                        t ud u                                                ll ane J          e        #                          :  aamicr e                                  d    uuot ue stt                                o  nnt ndh H
T nnr eeo A          h    aauoet N          cvp                    N          t e
MMACRO O        iEe                                M  123456 M        L        R 3
T  Illll                          lll R              n O              w P        f o E          oDr                                                  n R                    o                                          o    n d gt                                                  i    o onc)                                          t    t&i hia3                    4                      s    c    t tt e(                                    e      e    iga        r etR Mu r
u T      rnn tii o
r  )
h S
l      r o
snmer          n i            eiavE          i 1llll                          lll              a          Raxi            a F      e        rEtl        l  4 n                                          c    yT      aa      p o                                  t) ngr            grn) x        -
s)                                  nnanornt onE a2                  B              einit oisii(                  9 S                                          e(                                  mael at sit a                  8 N                                        R                                :  plt el annal r                9 O                                                                          n  ipnuureirpe                    1 I                              1lilllllll o  uxif gecmexh T                                          n                              s  qE a e e pi d pet              E C                                          o                              a  E(MRROLAO(O                    N U                                        is                  5          e    -    - - - -        - -    - U D
E t r au                  7 R  A      BCDE          FG    H  J R                                          ro                  2        2                                    T uH                                                                R R                                        D                                                                  O
_                        E                              ll(lllllll P
W                                                                                                            E
_                        O                                          e                                                                  R
_                        P                                          p)
_                                                                  y1                  S                                              T
_                        D                                        T(                                                                  P N                                                                                                            O A
_                                                      llll                          1ll 9              d                              0 e
S                                                            8                                              M e
N                                                            /              l                                  _
W                                        t                    1          d    u                              M O                                          a                  0          e  d                              O D                                        D                  /            c  e                              C T                                                            6            r  h                              P  _
U                                                              0          o  c H                              lll1              -
1ll F  S S
T I                                        N o
90 4
F S
N
_                        U                              llll                    llllI 80 1                                        __
Il[i                    Il}}

Revision as of 01:19, 25 November 2021