ML20214D701: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PLA-2853, Monthly Operating Repts for Apr 1987]]
| number = ML20214D701
| issue date = 04/30/1987
| title = Monthly Operating Repts for Apr 1987
| author name = Hirt J, Keiser H
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = Beebe M
| addressee affiliation = NRC
| docket = 05000387, 05000388
| license number =
| contact person =
| document report number = PLA-2853, NUDOCS 8705210435
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 12
}}
 
=Text=
{{#Wiki_filter:^
f                                  AVERAGE DAILY UNIT POWER LEVEL Q                      }
                                          $                                                                          50-187 rf).          , , , _ _                                                                                DOCKET NO.
L UNIT      One
    <                                0                                                                        DAir  s/6/87
                                                                                                                      .A. IEd O?RIC SY C MPLETED BY
                                                                                                                                                  ~
TELEPHONE MONDI          April,1987 DAY        AVERAGE DAILY POWER LEVEL                            DAY                    AVERAGE DAILY POWER LEVEL (MWe Net)                                                            (MWe-Net) g                  1043                                    ,7                                      0 2
323                                    ,,                                      o 3
0 l9 m
4                            0                                20                                    802 5                            0                                23                                    947 6                            0                                                                    1028 22 0                                                                    1031 7                                                            23 g                            0                                                                    1031 9                            0                                25                                  1039 10                            0                                                                    1040 26 0                                                                    1042 ll                                                            27 305                                                                          1042 12                                                              3 13                      871                                    29                                  1039 34                      900                                    30                                  1041 15 1022                                    3, 26
!      16 INSTRUC110NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 8705210435 870430
                                                                    ~
{DR ADOCK 05000387      PDR N ll
 
ANy gN
                                  >h s
t - - - - -        ~mJ                      OPERATING DATA REPORT 50-387 C                                  \                    DOCKET NO.
k                      M                                                                  DATE D /87 COMPLETED BY      J.A. Hirt NIC fCN                                                                      TELEPHONE '7171 942-3917 OPERATING STATUS Unit One                                                                      i Suschehanna Steam Electric Station                50 t"                                  l
: 1. Unit Name:
: 2. Reporting Penod:
April, 1987
: 3. Licensed Thermal Power IMWt p:          3293                                                                    -
1152
: 4. Nameplate Rating (Gross MWel:
1065                                                                j
: 5. Design Electrical Rating (Net MWel:
: 6. Maximum Dependable Capacity (Gross MWe):            1n69                                                      '.
: 7. Maximum Dependable Capacity (Net MWel:              1032                                                      I
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:
None None                                          -
: 9. Power Level To which Restricted. lf Any INet MWep:
: 10. Reasons For Restrictions. If Any:                    N/A This Month          Yr..to.Date          Cumulaine
: 11. Hours In Reporting Period                                  ~71 o                9;R70            la ,19?
: 12. Number Of Hours Reactor Was Critical                      427.0                2.597            24.174.5
: 13. Reactor Reserve Shutdown Hours                                0                      0                812.7
: 14. Hours Generator On.Line                                    399.8                2,559.8          24,173.8 0                      0                    0
: 15. Unit Reserve Shutdown Hours 1,201,220              8,014,363          74,297,501
: 16. Gross Thermal Energy Generated (MWH p 391,626            2,622,874            24,210,412 17 Gross Electrical Energy Generated IMWH1
: 18. Net Electrical Energy Generated IMWH)                177.19?            9.99R.61a          91.?na.661 l    19. Unit Service Factor                                          99.6                  R R ()              70.8 l    20. Unit Availability Factor 55.6    _
88.9                70.8
: 21. Unit Capacity Factor IUsing MDC Net)                        50.9    _
85.1                65.8
: 22. Unit Capacity Factor IUsing DER Nett                        49.3    _
82.5                63.8 l                                                                                            11.1                11.2
: 23. Unit Forced Outage Rate                                      44.4
: 24. Shutdowns Scheduled Over Next 6 MonthsITvoe. Date and Duration of Eaen
!        A Refuelina Outaae is schMu1M to recin SentemMr 5,19.87 and end November 20, 1987. Expected duration is 76 days.
j    25. If Shut Down At End Of Report Period. Estimated Date of Startup: _ N/A
: 26. Units in Test Status aPrior to Commercial Operations:                      Forecast            Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION p-i e
 
q@NNA                                                                                                                                    '
3    Pfi[8f[4    ,
I            k                                    UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET NO.        Sn-1R7 e                                                                                                            UNIT NAME RW-Uni t Opg_
p                                                                                                                DATE        9/6/R7 gIC gg                                              REPORT MONTH April, 1987                      COMPLETED BY          d*^- Mt TELEPHONE (717) 542-3917
                            .                                        "E                            -
e      n    .3 eo s Licensee
                                                                                          -        g*
No.            Date g
                                                .2 _r 3g 8
gs4
                                                                ,c  gg        Event c 't.,
ug go                  Cause & Corrective F
o.'E                      Action to
                                              $5          5  j di g      Report #    <N 0        V Prevent Recurrence 5
2        870402        F    236.2              A      3      87-013-00      SK      Cang      On April 2,1987 an autanatic actua-tion of the reactor protection systen occurred. The reason for the Scram was high reactor water level caused by a near-instantaneous failure in the feedwater m ntrol circuitry. The failure caused the feedwater punps to increase resulting in the high level. The failed canponent was replaced.
3        870416        F            83.0      A      1      87-014-00      XX      ISV      On April 15, 1987 at 2315 hours a controlled plant shutdown was initiated as required by Technical Specification 3.6.1.1. During the performance of a local Icak Rate Test (LLRP), plant personnel were unable to establish test pressure within the ILRP bourvbry. This 1                          2                                                      3                              4 F: Forced            Reason:                                                Method:
S: Scheduled                                                                                                    Exhibit G-Instructions A-Equipment Failure (Explain)                          1-Manual                          for Preparation of Data B-Maintenance of Test                                  2-Manual Scram.                  Entry Sheets for Licensee C-Refueling                                            3-Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                                4 Continuation                    0161)
E Operator Training & License Examination                  from previous month F-Administrative                                                                      5 G-Operational Error (Explain)                          5-Reduction Exhibit I - Same Source W/77)                        IIOther (Explain)                                      9-Other
 
gANN4                                                                                                                              .
4 2    F8h~\r N                              UNIT SHUTDOWNS AND POWER REDUCTIONS                                  '
                                                                                                                                      -unit une N    E (f.                                                                                                        DATE      5/6/87 I4fC N                                        REPORT MONTH Acril . 19R7                    C        HDW LA. h TELEPHONE (717) 542-3917 e.
* w    B                            E No.
c.
                                    .! E      }n        I5        Licensee    Et,,          ,,              Cause & Corrective Date              5g              ,c s 5        Event      g?        {*3 c-                      Action to F
                                    $5        5    }<> $ g    Report #    mO
[U                  Prevent Recurrence S
3                                                                                            (Continued frcxn previous page) resulted in primary contairment integrity being in question. The unit cxxnpleted the shutdown at 0245 hours on April 16th. Plant personnel reworked the affected valve and reduced the leakage to within accep-table limits.
I                      2                                                3                              4 F: Forced            Reason:                                          Method:                          Exhibit G - Instructions S: Scheduled          A-Equipment Failure (Explain)                    1-Manual                        for Preparation of Data B-Maintenance of Test                            2-Manual Scram.                  Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.              Event Report (LER) File (NUREG-D-Regulatory Restriction                          4 Continuation                  0161)
EOperator Training & License Examination            from previous month F-Administrative                                                              5 G-Operational Error (Explain)                    5-Reduction Exhibit I - Same Source 19/77)                  llother(Explain)                                  9-Other 1
 
p.
          -e. -s .                                                        s s
c SUSQUEWuta STEAM ELBCTRIC STATION-i                                      DOCKET NLNBER 50-387~ Date 5-6-87'-
Capleted by J.A. HirtiTelephone -(717) ~ 542-3917-
                  '' Challenges to Main Steam Safety Relief Valves-See attached Sheet.
Changes to the Offsite Dose Calculation Manual None.:
Major Changes to Radioactive waste Treatment System None..
 
l y
L In response to the April 2,1987 scram frcan 100% power four safety relief valves (SWs): lifted and reseated successfully. Listed below are the times
            - and pressures at which the SWs opened and closed.
TIME                                      PRESSURE SW                  OPEN                  CIOSE          OPEN                                          GDSE (Hrs: Min: Sec:)      (Hrs: Min: Sec:)    (PSIG)                                        (PSIG)-
E              07:26:17            07:26:23        1047                                          984 B-              07:26:15          07:26:23        1070                                          984 A              07:26:15          07:26:19        1070                                          1030 H              07:26:15          07:26:17        1070                                          1047
_    ___ _ _____ _ ___________________. _______        ___l
 
[                g                                                                  AVERAGE DAILY UNIT POWER LEVEL (t)          ....                            3                                                                                DOCKET NO.
50-388 L                "J    -
UNIT 0                                                                                                      5/6/87 f+                      #                                                                                                          DATE
                                                                                                                                              -_J.A. Hirt
            ?RIC SY                                                                                                        COMPLETED BY TELEPHONE  (717) 542-3917 April,1987 Mo m DAY        AVERAGE DAILY POWER LEVEL                                                                      DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                                    (MWe-Net)
I              1056                                                                                  37                0-2                1055                                                                                  18                0 3                1056                                                                                  g,                0 4                1051                                                                                                      0 20 1053                                                                                                      0 5                                                                                                      ,,
1054                                                                                                      0 6                                                                                                      22 7                1053                                                                                  23                0 8                1052                                                                                  24 0
9 1052                                                                                                      6 25 to 00 26 1047                                                                                                    764 11                                                                                                      27 12                1049                                                                                  28 922 13 1049                                                                                                1043 29 g4 1048 30 15                  1048                                                                                  33 16                    365
;    INSTRUCTIONS On this format, list the average daily umt power levelin MWe Net for each day in the reportine month. Compute to the nearest whole megawatt.
                                                                                                                              ~
(9/77)
* 6 Atwv4
                                                'y 07 f        . .;                          s t C- - -              -,J                            OPERATING DATA REPORT so
                                                                                \                  DOCxET NO. so-ass DATE      6/87 COMPLETED BY      . . Hirt
                    #fC @                                                                            TELEPHONE (717) 547-3917 OPERATING STATUS Unit 'IWo Susquehanna Stean Electric Station                      Notes
: 1. Unit Nm-
: 2. Reporting Period:                    U ll' * #
: 3. Licensed Thermal Power (MWt).
3293                                                        ;
: 4. Nameplate Rating (Gross MWei:
1152
: 5. Design Electrual Rating (Net MWe1:                  1m                                      ~
IngA
: 4. Maximum Dependable Capacity qGross MWel:                                                                          '
: 7. Maximum Dependable Capacity (Net MWe):                    1017
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:
None None
: 9. Power Level To Which Restricted. lf Any (Net MWe):
: 10. Reasons For Restrictions. If Any:                          M/A This Month        Yr..to-Date        Cumulatise 719            2,879            19,391 i1. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical                              9nA_n          7.An1            19.711
: 13. Reactor Reserve Shutdown Hours                                      0                    0              717.9
: 14. Hours Generator On.Line                                          489.3          2.550.6          15,279.9
: 15. Unit Reserve Shutdown Hours                                          0                    0                  0
: 16. Gross Thermal Energy Generated (MWH) 1,536,086          8,146,772        47,539,657
: 17. Gross Electrical Energy Generated (MWH) 504,218          2,688,830        15,593,124 487,305          2,596,469        14,998,998
: 18. Net Electrical Energy Generated (MWH)
D *'                O *D                  *
: 19. Unit Service Factor
: 20. Unit Availability Factor 69.1  ,,
AR.6              7R.R
: 21. Unit Capacity Factor IUsing MDC Net)                                65.7                87.4              75.0
: 22. Unit Capacity FactoriUsing DER Net)                                  63.6  _
84.7              72.6
: 23. Unit Forced Outage Rate                                              31.9                11.4              12.3
: 24. Shutdowns Scheduled Over Next 6' Months tType. Date.and Duration of Eseh r There are no scheduled shutdowns over the next six nonths.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status aPrior to Commercial Operation):                          Forecast          Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION g.->
D
 
4gANN4                                                                                                                                .
3  F8hf N                                                                                                                              '
I                                                                                                                  50-388
* UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET        NO. Sht.s-Unit Two R
Y g UNIT NAME M                                                                                              DATE      5/6/87
                #4fC N                                      REPORT MONTH Acril,1987                      NTED W Mh TELEPHONE (7171 9 d '>-%17
                                                        ~.
* E
                                                    -                                  c
                          -        E "::    3'j    *I5        Licensee    Ev        E%                  Cause & Corrective
      %.          Date
{
I-fl y:        5 3gE          Event N
mo        h U Action to j di g      Report a g                    Prevent Recurrence
.                                                        S 4        870416        F    229,7      H        3      87-006-00    JM      ZZZZZZ    On April 16, 1987 at 0820 hours an autmatic actuation of the reactor protection system occurred due to the spurious closure of the Main Stean Isolation Valves (MSIV) .
Althotgh the cause of the MSIV isola-tion could not be determined, the main stean line low pressure switches are highly suspect due to their proven sensitivity..to external
,                                                                                              disturbances. Protective barriers were installed around the switches to prevent personnel fran inadvertent-ly caning in contact with the switches          ,
associated sensor tubing and their structural supports.
i 1                    2                                                3                              4 F: Forced            Reason:                                          Method:
S: Scheduled Exhibit G-Instructions A-Equipment Failure (Explain)                    1 Manual                          for Preparation of Data B-Maintenance of Test                            2-Manual Scram.                  Entry Sheets for Licensee C. Refueling                                      3-Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                          4 Continuation                    0161)
E-Operator Training & License Examination          from previous month F Administrative                                                                S G-Operational Error (Explain)                    5-Reduction Exhibit I - Same Source (9/77)                IIOther(Explain)                                  9-Other
 
  , io..                _
SUSQUEHANNA STEAM ELECTRIC STATICN DOCFLT NUMBER 50-388 Date 5-6-87 Capleted by J.A. Hirt Telephone (717) 542-3917 Challenges to Main Steam Safety Relief Valves See attached Sheet..
Changes to the Offsite Dose Calculation Manual None.
Major Changes to Radioactive waste Treatment Systen None.
 
      ..e
          'Due to the April 16, 1987 scram frca 100% power one safety relief valve (SRV) opened three times._ Listed below are the times and the pressures the SRV lifted and reseated.
TIME                                      PRESSURE OPEN                  C[OSE                OPEN          CIOSE (Hrs: Min Secs)      (Hrs: Mins: Secs)          (PSIG)        (PSIG) 08:26:28              08:32:45              1006            723 08:25:25              08:26:11              1067            996 08:23:29              08:24:17              1067            991 e
i i-i-
l'
 
p e .,  .. e Q                Pennsylvania Pow r & Light Comp:ny Two North Ninth Street
* Allentown, PA 18101 e 2151T106151 Submitted pursuant to Technical Specifications i          Harold W. Keiser                                                          Section 6.9.1.6 Vice President-Nucleer Operations 215/770-7502 MAY 151987 5
            . Director, Data Automation'&
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.        20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS                                              Docket Nos. 50-387/NPF-14 PLA-2853                      FILE R41-2A                                            50-388/NPF-22
 
==Dear Mr. Beebe:==
 
The April 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, h
2
            .H. W. Keiser Vice President-Nuclear Operations Attachment cct Document Control Desk (Original)
NRC Region I Mr. L. R. Plisco - NRC Resident l                  Mr. M. C. Thadani - NRC Project Manager i
(
l 9Y 9 elt}}

Latest revision as of 15:57, 27 July 2021