PNO-II-89-063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[PNO-II-89-063, A:on 890906,Augmented Insp Team Dispatched to Investigate Overpressurization of Containment Spray Sys & Resultant Spill of Contaminated Water Into Auxiliary Bldg. Problems Existed W/Operability Test Procedure]]
#REDIRECT [[PNO-II-89-063, on 890905,spill of Approx 10,000 Gallons of Contaminated Water Into Auxiliary Bldg Occurred.Caused by Overpressurization of Primary Sys Pressure Allowed to Pressurize Train a Containment Designed for 220 Psi]]

Latest revision as of 17:59, 17 March 2021