ENS 54382: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 10: | Line 10: | ||
| utype = GE-4, GE-4, GE-4 | | utype = GE-4, GE-4, GE-4 | ||
| cfr = 10 CFR 50.72(b)(3)(xiii) | | cfr = 10 CFR 50.72(b)(3)(xiii) | ||
| emergency class = | | emergency class = Non Emergency | ||
| notification date = 11/12/2019 10:32 | | notification date = 11/12/2019 10:32 | ||
| notification by = Angel Yarbrough | | notification by = Angel Yarbrough | ||
Line 17: | Line 17: | ||
| last update date = 01/31/2020 | | last update date = 01/31/2020 | ||
| title = Emergency Operations Facility Out of Service | | title = Emergency Operations Facility Out of Service | ||
| event text = | | event text = On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project. The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar). The duration of the upgrade project is approximately 75 days. | ||
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used. During this period, the alternate CECC will be staffed and activated using existing emergency procedures. | |||
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours. | |||
The Emergency Response Organization has been notified that the CECC will be unavailable during the upgrade project and to report to the alternate CECC in the event of an emergency. There is no impact on the health and safety of the public or plant employees. | |||
The NRC Resident Inspector has been notified. | |||
* * * UPDATE AT 1316 EST ON 11/14/19 FROM BARUCH CALKIN TO JEFF HERRERA * * * | * * * UPDATE AT 1316 EST ON 11/14/19 FROM BARUCH CALKIN TO JEFF HERRERA * * * | ||
The event information was updated to indicate that the event occurred at 0700 EST. | The event information was updated to indicate that the event occurred at 0700 EST. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
Notified the R2DO(Musser). | Notified the R2DO(Musser). | ||
* * * UPDATE FROM ALAN PRUCHA TO KERBY SCALES AT 1526 EST ON 1/31/2020 * * * | * * * UPDATE FROM ALAN PRUCHA TO KERBY SCALES AT 1526 EST ON 1/31/2020 * * * | ||
The CECC facility upgrade project is sufficiently complete such that the CECC was returned to a functional status at 1350 CST on January 31, 2020. | |||
The NRC Resident Inspector has been notified. | |||
Notified R2DO (Baptist). | |||
Notified R2DO (Baptist). | |||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200203en.html#en54382 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200203en.html#en54382 | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Latest revision as of 12:57, 15 January 2021
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />) | |
Opened: | Angel Yarbrough 10:32 Nov 12, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Jan 31, 2020 |
54382 - NRC Website
| |