ML20065S144: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:U-0568
      /LL/ND/S POWER COMPANY                    L34(19)-82(10-27)-L 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 October 27, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.      20555
 
==Dear Mr. Denton:==
 
Clinton Power Station Unit 1 Docket No. 50-461 Final Safety Analysis Report (FSAR) Amendment No. 19 Illinois Power Company hereby files Amendment No. 19, dated October, 1982, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment No. 19 consists of re-visions to update environmental qualification of equipment information in new Subsection 3.11.15, Mechanical Equipment Qualification, and revised Tables 3.11-1, 3.11-2, 3.11-3, 3.11-4 and 3.11-20.
Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10 CFR 50.30.
Respectfully submitted, ILLINOIS POWER COMPANY V        /#
L J. Koch V ce President GEW/lt Subscribed and sworn to before me the 27th day QV g Q[
of Gctober, 1982                                            3 0%cov' 6 mr&
                                                                  /    1r Notary Public 8211010099 821027 PDR ADOCK 05000461 K              PDR}}

Latest revision as of 04:19, 6 January 2021

Forwards Amend 19 to Fsar,Consisting of Revisions to Update Environ Qualification of Equipment Info in New Subsection 3.11.15,mechanical Equipment Qualifications & Revised Tables 3.11-1,3.11-2,3.11-3 & 3.11-20
ML20065S144
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/27/1982
From: Koch L
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065S147 List:
References
U-0568, U-568, NUDOCS 8211010099
Download: ML20065S144 (1)


Text

U-0568

/LL/ND/S POWER COMPANY L34(19)-82(10-27)-L 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 October 27, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Clinton Power Station Unit 1 Docket No. 50-461 Final Safety Analysis Report (FSAR) Amendment No. 19 Illinois Power Company hereby files Amendment No. 19, dated October, 1982, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment No. 19 consists of re-visions to update environmental qualification of equipment information in new Subsection 3.11.15, Mechanical Equipment Qualification, and revised Tables 3.11-1, 3.11-2, 3.11-3, 3.11-4 and 3.11-20.

Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10 CFR 50.30.

Respectfully submitted, ILLINOIS POWER COMPANY V /#

L J. Koch V ce President GEW/lt Subscribed and sworn to before me the 27th day QV g Q[

of Gctober, 1982 3 0%cov' 6 mr&

/ 1r Notary Public 8211010099 821027 PDR ADOCK 05000461 K PDR