PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
{{#Wiki_filter:}} | {{#Wiki_filter:_ __ _. _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ . _ _ _ . _ _ | ||
l 9 c* | |||
l L | |||
s November 13, 1998 3 | |||
PRELIMINARYNOTIFICATIONOFEVENTORUNUSUALOCCURRENCEPNO-III-98-055 ; | |||
This preliminary notification constitutes EARLY notice of events of POSSIBLE | |||
. safety or public interest significance. The information is as initially | |||
. received without verification or evaluation, and is basically all that is ' | |||
known by Region III staff _(Lisle. Illinois) on this date. | |||
Facility. Licensee Emergency Classification Detroit Edison Co. Notification of Unusual Event Fermi 2 ' Alert New) ort. Michigan Site Area Emergency | |||
.Doccets: 50-341 General Emergency X Not Applicable t | |||
==Subject:== | |||
SHUTDOWN TO REPAIR STEAM LEAK On November 13,1998,,the licensee shut the unit down to repair a steam leak from.a reactor feedwater check valve. This valve is safety-related and would. provide a primary containment isolation function under accident | |||
; conditions. The unit is expected to be shut down for 4 to 6 days. | |||
The resident inspectors will monitor the licensee's repair activities. l The State of Michigan will be notified. The'information in this i preliminary notification has been reviewed with licensee management. | |||
. i Region-III (Chicago) was informed of the pending shutdown on November 12, J 1998. This information is current as of 10 a..m. (CST) on November 13. 3 | |||
-1998. j | |||
==Contact:== | |||
Edward Schweibinz Anton Vegel (630)829-9712 (630)829-9620 I | |||
i l | |||
l i | |||
9811160022 981113 | |||
, ( a) | |||
PDR IS E o b | |||
! PNO-III-99-055 PDR { | |||
23 De L | |||
! , - _ - - _ _ _}} | |||
{{PNO-Nav|region=III}} | {{PNO-Nav|region=III}} | ||
Revision as of 01:53, 17 December 2020
| ML20155K565 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/13/1998 |
| From: | Schweibinz E, Anton Vegel NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| References | |
| PNO-III-98-055, PNO-III-98-55, NUDOCS 9811160022 | |
| Download: ML20155K565 (1) | |
_ __ _. _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ . _ _ _ . _ _
l 9 c*
l L
s November 13, 1998 3
PRELIMINARYNOTIFICATIONOFEVENTORUNUSUALOCCURRENCEPNO-III-98-055 ;
This preliminary notification constitutes EARLY notice of events of POSSIBLE
. safety or public interest significance. The information is as initially
. received without verification or evaluation, and is basically all that is '
known by Region III staff _(Lisle. Illinois) on this date.
Facility. Licensee Emergency Classification Detroit Edison Co. Notification of Unusual Event Fermi 2 ' Alert New) ort. Michigan Site Area Emergency
.Doccets: 50-341 General Emergency X Not Applicable t
Subject:
SHUTDOWN TO REPAIR STEAM LEAK On November 13,1998,,the licensee shut the unit down to repair a steam leak from.a reactor feedwater check valve. This valve is safety-related and would. provide a primary containment isolation function under accident
- conditions. The unit is expected to be shut down for 4 to 6 days.
The resident inspectors will monitor the licensee's repair activities. l The State of Michigan will be notified. The'information in this i preliminary notification has been reviewed with licensee management.
. i Region-III (Chicago) was informed of the pending shutdown on November 12, J 1998. This information is current as of 10 a..m. (CST) on November 13. 3
-1998. j
Contact:
Edward Schweibinz Anton Vegel (630)829-9712 (630)829-9620 I
i l
l i
9811160022 981113
, ( a)
PDR IS E o b
! PNO-III-99-055 PDR {
23 De L
! , - _ - - _ _ _