05000254/LER-1997-023, Informs NRC of Change of Committed Due Date Contained in LER 97-023.Station Changing Due Date of Commitments to 980331: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed]]
| number = ML20198C120
| issue date = 12/26/1997
| title = Informs NRC of Change of Committed Due Date Contained in LER 97-023.Station Changing Due Date of Commitments to 980331
| author name = Kraft E
| author affiliation = COMMONWEALTH EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000254
| license number =
| contact person =
| document report number = SVP-97-318, NUDOCS 9801070201
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
{{LER
| Title = Informs NRC of Change of Committed Due Date Contained in LER 97-023.Station Changing Due Date of Commitments to 980331
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000254
| LER year = 2097
| LER number = 23
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:- _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _                                    ..                              -
n,mnmnu.oth i a- o tomrun) l                eef g            qu.ia uun ornt raung suon j                                  n m amth aenorsonti
: f. ora.n a. it 61242 9'40-Tei .wn,u22 u =
E SVP-97 318 December 26,1997 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:        Document Control Desk
 
==Subject:==
Quad Cities Nuclear Power Station Units 1 and 2 Quad Cities Licensee Event Report 50-254/97023 NRC Docket Numbers 50-254 and 50-26ji
 
==Reference:==
(a) D. B. Cook (Comed) letter to USNRC, dated November 25,1997 The purpose of this letter is to infonn you of the change of a committed due date contained in the Licensee Event Report 50-254/97023, reference (a).
In this report, the station made the following commitments:
Revise QCAP 1100-04, by 123197 to require that each procedure revision be reviewed for possible efTect or inclusion as a predefine in Electronic Work Control System.
Revise QCAP 1100-04 by 123197 to ensure a detailed cross-discipline review for Technical Specification (TS) compliance is included for all changes to procedures implementing TS 4.0 to 4.12 requirements.
The station is changing the due date of these commitments to March 31,1998. The revision to QCAP 1100-04 will result in a resource impact which was not originally recognized. This change will allow the station to appropriately align necessary resources to resolve these issues.
                                    $        DN      N          4
                                                                                                          . El.ltI.El. il.li.l!            1.1
 
                  <t e g,-;                                                                                                                                          ,
USNRC-                                                                                                                            i 1- ' ' '.SVP-97-318 -                                        2                                  _ December 26,1997?
If you have any questions concerning this letter, please contact Mr. Charles Peterson, -
                ~
Regulatory Affairs Manager, at (309) 654-2241, extension 3609                                                                    .
Respectfully,                                                                                                                    ,
Sh.                            ,
                                                                                                                                                                    +
E. S. Krall, Site Vice President -
Quad Cities Station cc:            A. B. Beach, Regional Administrator, Region 111 R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company _
F. A. Spangenberg, Regulatory Affairs Manager, Dresden                                                            ,
INPO Records Center-Office of Nuclear Facility Safety, IDNS
-                                                  DCD License (both electronic and hard copies) r-                                                - M: E. Wagner, Licensing, Comed SVP Letter File 5
J.
_ . ,      _ . ~ . _      . _ .          _.                __        ., _.          _ . , . _ _ _                  _  _      _ ._ _ . . . . . _ . . , ,
}}
 
{{LER-Nav}}

Revision as of 02:56, 15 December 2020