ML12235A344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000361/2012404]]
| number = ML12235A344
| issue date = 08/22/2012
| title = IR 05000361-12-404 & 05000362-12-404, 7/19/2012, San Onofre Nuclear Generating Station, Units 2 and 3, Cover Letter
| author name = Hay M C
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Dietrich P
| addressee affiliation = Southern California Edison Co
| docket = 05000361, 05000362
| license number = NPF-010, NPF-015
| contact person = Buchanan J L
| document report number = IR-12-404
| document type = Letter
| page count = 3
}}
See also: [[followed by::IR 05000361/2012404]]
 
=Text=
{{#Wiki_filter:"Enclosure transmittal herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled." August 22, 2012 Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
 
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - NRC SECURITY INSPECTION REPORT 05000361/2012404; 05000362/2012404
 
==Dear Mr. Dietrich:==
On July 19, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your San Onofre Nuclear Generating Station Units 2 and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 19, 2012, with Mr. D. Yarbrough, Acting Plant Manager, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. One self revealing finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. This finding was determined to involve a violation of NRC requirements. The NRC is treating this violation as a noncited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region IV, U.S. Nuclear Regulatory Commission, Region IV, 1600 E. Lamar Blvd, M Arlington, Texas, 76011-4125; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the San Onofre Nuclear Generating Station.
 
One crosscutting aspect was assigned to the finding in the area of Human Performance associated with the work practices component (H.4.(b)). If you disagree with the crosscutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Resident Inspector at the San Onofre Nuclear Generating Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/ Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket Nos.: 05000361, 05000362 License Nos.: NPF-10, NPF-15 Nonpublic
 
===Enclosure:===
Inspection Report 05000361/2012404 and 05000362/2012404
 
===w/Attachment:===
Supplemental Information M Electronic Distribution by RIV w/enclosure: Chief, Reactor Security Oversight Branch (Ronald.Albert@nrc.gov) Security Specialist/NSIR (Shyrl.Coker@nrc.gov)
Chief, Security Performance Evaluation Branch (Clay.Johnson@nrc.gov) Security Specialist/NSIR(Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov) Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Electronic distribution by RIV w/o enclosure: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Senior Project Engineer (Nick.Taylor@nrc.gov) Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource Only inspection reports to the following: RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov) R:\_REACTORS\_SONGS\2012\SO2012404-LTR-Non-SGI-jlb.docx ADAMS Accession No.: ML12235A344 Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/Enclosure(s) SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available PSI:PSB1 Peer:PSB1 C:PBD C:PSB1 JLBuchanan EXByre RELantz MCHay /RA/ /RA/ /RA//RA/ 08/02/2012 08/14/2012 08/17/2012 08/21/2012 OFFICIAL COPY T=Telephone E=E-Mail F=FAX
}}

Latest revision as of 23:48, 18 February 2018