ML13127A463: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000346/2013403]]
| number = ML13127A463
| issue date = 05/07/2013
| title = IR 05000346-13-403; 01/28/2013 - 02/28/2013; Davis-Besse Nuclear Power Station; Routine Security Baseline Inspection; Protection of Safeguards Information (71130.06) (Cover Letter Only)
| author name = Maynen J D
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Lieb R
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| license number = NPF-003
| contact person =
| document report number = IR-13-403
| document type = Letter
| page count = 4
}}
See also: [[followed by::IR 05000346/2013403]]
 
=Text=
{{#Wiki_filter:
[[Issue date::May 7, 2013]]
 
Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
 
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000346/2013403
 
==Dear Mr. Lieb:==
On February 28, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 3, 2013, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. One NRC-identified finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the area. This finding was determined to involve a violation of NRC requirements. Further, a licensee-identified violation which was determined to be of very low security significance, is listed in this report. The NRC is treating these violations as Non-Cited Violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy. If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with a copy to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Davis-Besse Nuclear Power Station. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. One cross-cutting aspect was assigned to a finding in the area of Problem Identification and Resolution, Corrective Action Program [P.1(c)], because the licensee failed to thoroughly evaluate a previous issue associated with the finding such that resolutions addressed causes and extent of conditions, and effectiveness reviews of corrective actions were performed to ensure that the problems were resolved.
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III; and the NRC Resident Inspector at Davis-Besse Nuclear Power Station.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information -
Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/ Joseph D. Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic
 
===Enclosure:===
Inspection Report 05000346/2013403
 
===w/Attachment:===
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV M. Bear, State Liaison Officer, Ohio Emergency Management Agency cc w/o encl: Distribution via ListServŽ
}}

Latest revision as of 22:04, 18 February 2018