ML14332A467: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000313/2014407]]
| number = ML14332A467
| issue date = 11/28/2014
| title = Arkansas Nuclear One, Units 1 and 2, NRC Supplemental IR 05000313/2014407 and 05000368/2014407
| author name = Haire M S
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Browning J
| addressee affiliation = Entergy Operations, Inc
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| contact person =
| document report number = IR-2014407
| document type = Letter
| page count = 4
}}
See also: [[followed by::IR 05000313/2014407]]
 
=Text=
{{#Wiki_filter:" " November 28, 2014 Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc. 1448 SR 333 Russellville, AR 72802-0967
 
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SUPPLEMENTAL INSPECTION REPORT 05000313/2014407 AND 05000368/2014407
 
==Dear Mr. Browning:==
In approximately August 2008, your staff failed to meet a requirement or standard. On February 27, 2014, the NRC completed a Special Inspection at your Arkansas Nuclear One, Units 1 and 2, facility. Based on the results of this inspection, documented in NRC Inspection Report 05000313/2013406 and 05000368/2013406, dated March 25, 2014, and the final significance determination documented by letter dated June 18, 2014, the NRC assigned a finding Action Matrix input to the security cornerstone in the first quarter of 2014. In response to this Action Matrix input, the NRC informed you that a supplemental inspection would be required. On September 17, 2014, you informed the NRC that the station was ready for the supplemental inspection.
 
On October 15, 2014, the NRC completed the supplemental inspection and discussed the results of this inspection and the implementation of your corrective actions with Mr. D. James, Director, Regulatory and Performance Improvement, and other members of your staff. The supplemental inspection reviewed the circumstances surrounding an issue which your staff identified on November 14, 2013. The inspection team documented the results of this inspection in the enclosed inspection report.
 
The NRC performed this supplemental inspection to determine if (1) the root and contributing causes for the significant issues were understood, (2) the extent of condition and extent of cause for the identified issues were understood, and (3) your completed or planned corrective actions were sufficient to address and prevent repetition of the root and contributing causes.
 
The NRC has determined that the completed or planned corrective actions were sufficient to address the performance that led to the finding. Therefore, the performance issue will not be considered as an Action Matrix input after the end of the fourth quarter of 2014. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/ David A. Holman for Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-313; 50-368 License Nos.: DPR-51; NPF-6
 
Nonpublic
 
===Enclosure:===
NRC Inspection Report 05000313/2014407; 05000368/2014407
 
===w/Attachment:===
Supplemental Information
 
cc w/o enclosure:
Electronic Distribution for Arkansas Nuclear One
}}

Latest revision as of 20:37, 18 February 2018