ML14349A627: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000335/2014201]]
| number = ML14349A627
| issue date = 12/22/2014
| title = IR 05000335/2014201 and 05000389/2014201, St. Lucie, Units 1 and 2, Security Inspection
| author name = Johnson R C
| author affiliation = NRC/NSIR/DSO
| addressee name = Jensen J
| addressee affiliation = Florida Power & Light Co
| docket = 05000335, 05000389
| license number = DPR-067, NPF-016
| contact person = Barry T
| document report number = IR 2014201
| document type = Letter
| page count = 2
}}
See also: [[followed by::IR 05000335/2014201]]
 
=Text=
{{#Wiki_filter:
[[Issue date::December 22, 2014]]
 
Mr. Joseph Jensen, Site Vice President Florida Power and Light Company St. Lucie Nuclear Plant, Units 1 and 2 6501 S. Ocean Drive Jensen Beach, FL 34957
 
SUBJECT: ST. LUCIE NUCLEAR PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000335/2014201 AND 05000389/2014201
 
==Dear Mr. Jensen:==
On November 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your St. Lucie Nuclear Plant, Units 1 and 2 and the NRC inspectors discussed the results of this inspection with Mr. Mark Fencl and other members of your staff.
 
Inspectors documented the results of this inspection in the enclosed inspection report.
 
NRC inspectors documented two findings of very low security significance (Green) in this report. These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCV), consistent with Section 2.3.2.a, of the Enforcement Policy.
 
If you contest the violations or the significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator RII; the Director, Office of Nuclear Security and Incident Response (NSIR), and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the St. Lucie Nuclear Plant, Units 1 and 2.
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response witin 30 days of this inspection report, with the basis of your disagreement, to the Office of Nuclear Security and Incident Response, the Regional Administrator, Region II, and the NRC Resident Inspector at the St. Lucie Nuclear Plant, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA by D. Cardenas for/ Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16 Nonpublic
 
===Enclosure:===
Inspection Report 05000335/2014201 and 05000389/2014201
 
===w/Attachments:===
Supplemental Information cc w/encl: C. Workman, Security Manager
}}