      'Af ouquesne umt                                                                .. _ . .,e ,., _
Nuclear Group skpIn'gport. PA 15077 0004                                            #
U. S. Nuclear Regulatory Commission Attn:      Document Control Desk Washington, DC 20555
 
==Reference:==
Beaver Valloy Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 145/1 Gentlemen:
Enclosed are:
: 1.        One      (1)    original and thirty-seven (37) copie.= of an Application for Amendment to the above operating Licenses to incorporate        the chanqcs    recommended in accordance with Generic Letter 87-09        to more  cicarly define the intent and resolve          impicmentation      problems      associated        with specifications 3.0.4, 4.0.3 and 4.0.4.
Th!;    change    was  reviewed by the OSC and ORC and determined to be safe        and  does  not    involve an unreviewed safety question.
: 2.        Thirty-eight (38) copics of documents designated Attachments A,    B    and    C which  setforth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation.
A    check in the amount of $150.00 is attached as payment of the license amendment application fee in accordance with 10 CFR 170.
Very truly yours,
                                                            /  ,
k
                                                              . D.
bl SIcher
[VicePresident, Nuclear cc:      Mr. J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator                                4 gl Mr. P. Tam, Project Manager                                                  /I Director, Safety Evaluation & Control (VEPCC)
Mr. T. M. Gerusky, Director BRP/ DER                                            I 31  ph 8802050107 080125                                                                i    b PDR      ADOCK 05000334                                                      y j(C(o P                      PDR
                                                                                    $\50'yd a}}

Revision as of 09:56, 13 November 2020

Forwards Proposed OL Change Request 145/1 for Licenses DPR-66 & NPF-73 Clearly Defining Intent & Resolving Implementation Problems Associated W/Tech Specs 3.0.4,4.0.3 & 4.0.4.Fee Paid
ML20196A857
Person / Time
Site: Beaver Valley
Issue date: 01/25/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20196A862 List:
References
GL-87-09, GL-87-9, NUDOCS 8802050187
Download: ML20196A857 (1)


Text

i 4

$VL

'Af ouquesne umt .. _ . .,e ,., _

Nuclear Group skpIn'gport. PA 15077 0004 #

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Reference:

Beaver Valloy Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 145/1 Gentlemen:

Enclosed are:

1. One (1) original and thirty-seven (37) copie.= of an Application for Amendment to the above operating Licenses to incorporate the chanqcs recommended in accordance with Generic Letter 87-09 to more cicarly define the intent and resolve impicmentation problems associated with specifications 3.0.4, 4.0.3 and 4.0.4.

Th!; change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.

2. Thirty-eight (38) copics of documents designated Attachments A, B and C which setforth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation.

A check in the amount of $150.00 is attached as payment of the license amendment application fee in accordance with 10 CFR 170.

Very truly yours,

/ ,

k

. D.

bl SIcher

[VicePresident, Nuclear cc: Mr. J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator 4 gl Mr. P. Tam, Project Manager /I Director, Safety Evaluation & Control (VEPCC)

Mr. T. M. Gerusky, Director BRP/ DER I 31 ph 8802050107 080125 i b PDR ADOCK 05000334 y j(C(o P PDR