NUREG-0899, Forwards SER Conditionally Supporting Response to Procedures Generation Package.Items Re Primary Containment Pressure Limit for Venting Guidance & Dcrdr Must Be Addressed: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NUREG-0899, Notice of Violation from Insp on 880510-17.Violation Noted:Licensee Did Not Incorporate Guidance Into plant-specific Emergency Operating Procedure 2532, Loss of Primary Coolant or Justify Omission of Guidance]]
| number = ML20138G612
| issue date = 10/18/1985
| title = Forwards SER Conditionally Supporting Response to Procedures Generation Package.Items Re Primary Containment Pressure Limit for Venting Guidance & Dcrdr Must Be Addressed
| author name = Butler W
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name = Farrar D
| addressee affiliation = COMMONWEALTH EDISON CO.
| docket = 05000373, 05000374
| license number =
| contact person =
| case reference number = RTR-NUREG-0737, RTR-NUREG-0889, RTR-NUREG-0899, RTR-NUREG-737, RTR-NUREG-889, RTR-NUREG-899
| document report number = NUDOCS 8510250566
| package number = ML20138G620
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
}}
 
=Text=
{{#Wiki_filter:.
          ~          .    .
OCT I 8 1985
  . Docket lies. 50-373/374 f;r. Dennis L. Farrar
        .irecter of Licensing                                                                                                g Coraconwtolth Edison Company P.O. Box 767 Chicago, Illinois 60690
 
==Dear Mr. Farrar:==
 
==SUBJECT:==
SAFETY EVALUATION REPORT Oft PROCECURES GENERATION PACKAGE FOR LA SALLE COUllTY STATION, UhlTS 1 AllD 2 By letter dateo September 26, 1984 and as supplecented by letters datec June 26, 1985 and August 20, 1985, Conrconwealth Edison submitted its resrense
(      te the Procedures Generation Package for La Salle County Station Ur.its 1 and 2.
Enclosed is cur Safcty Evaluation Report to your response. Your progran for developing your Procedure Generation Package was found acceptable; however, you are required to respond to thrce itens described in the Safety Evaluation Pepcrt. Two of the items relate to the details of the plant-specific technical guidence covering the Primary Contairrent Pressure Linit for venting the La Salle Units 1 and 2 contair. rents. We find your proposed venting procedure acceptable on an interin basis, but these items rust be addressed in the long l
tern. The third iten rust be addressed in your Detailed Control Room Design Program Plan.
Af ter the receipt of this letter, please nctify us within two weeks of ycur planred schedule for responding to the above requested itens. If there are cuestions concerning these natters, please contact A. Bournia, the Project laanager (301-492-8535).
Sincerely,
[Dricie' wng gp                        ,
Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
 
==Enclosure:==
As statec cc w/erclosure:
See next page                                                                                                        ,
DISTRIBUTIch        Docket File                          flRC PDR      Local PDR        PRC Systen f1 SIC  /
LB#2 Reading        EHylton                              ABournia Woodhead,0 ELD ACRS (16)          JPartlow BGrimes              EJorden                              J Kud ri A V t? 1        ,
(3)                                                1 LB42/DL/Pft ASournia:lb LBv2/DL/EC(!
KButler                          !
j                                                      '
10//9 /85                                              W 10/{/85 8510250566 051018 PDR    ADOCK 05000373 F                                        PDR
 
8f  "c%'o, UNITED STATES E'      3m  'h                      NUCLEAR REGULATORY COMMISSION 7, ' '      .C WASHING TON, 0. C. 20555 s        o                #
              \ ***** /
CCI 1 e 1985 Docket Nos. 50-373/374 Mr. Dennis L. Farrar Director of Licensing                                                                                    !
Commonwealth Edison Company l
P.O. Box 767                                                                                            '
Chicago, Illinois 60690
 
==Dear Mr. Farrar:==
 
==SUBJECT:==
SAFETY EVALUATION REPORT ON PROCEDURES GENERATION PACKAGE FOR 1                                    LA SALLE COUNTY STATION, UNITS 1 AHD 2 By letter dated September 26, 1984 and as supplemented by letters dated June 28, 1985 and August 20, 1985, Corru.cnwealth Edison submitted its response to the Procedures Generation Package for La Salle County Station Units 1 and 2.
Enclosed is our Safety Evaluation Report to your response. Your program for developing your Procedure Generation Package was found acceptable; however, you are required to respcnd to three items described in the Safety Evaluation Report. Two of the items relate to the details of the plant-specific technical
;                    guidance covering the Primary Contairnent Pressure Limit for venting the 1                    La Salle Units I and 2 containments. We find your proposed venting procedure acceptable on an interim basis, but these items must be addressed in the long term. The third iten cust be addressed in your Detailed Control Room Design Program Plan.
,                    After the receipt of this letter, please notify us within two weeks of your
;                    planr.ed schedule for responding to the above requested items. If there are questions concerning these natters, please contact A. Bournia, the Project Manager (301-492-8535).
Sincerely,
                                                                                  ?
i k
Walter R. Butler, Chief
                                                                                                  '                  V Licensing Branch No. 2 Division of Licensing i                    Enclosure. As stated i
cc w/ enclosure:
j                    See next page l
1
 
l t.r. Dennis L. Farrar                                    La Salle County Nuclear Power Station Commonwealth Edison Company                              Units 1 & 2 f
cc:
Philip P. Steptoe, Esquire                                John W. McCaffrey Suite 4200                                                Chief, Public Utilities Division One First National Plaza                                  160 horth La Salle Street, Room 900 Chicago, Illinois 60603                                  Chicago, Illinois 60601
.          Assistant Attorney General l          188 West Randolph Street
:        Suite 2515 i          Chicago, Illinois 60001 Resident Inspector /LaSalle, NPS U.S. Nuclear Regulatory Commission Rural Rcute bc. 1
;        Post 0Ffice Box 224 Marseilles, Illir.ois t1341 Chairman La Salle County Board of Superviscrs La Salle County Courthouse q
Ottawa, Illinois 61350 Attorney General 50C South 2nd Street Springfield, Ill1oois 62701 Chairman Illinois Commerce Commission Leland Building i          527 East Capitol Avenue j          Springfielc, Illiccis 62706 4
Mr. Gary ti. Wright, ifanager fluclear Facility Safety Illinois Department of liuclear Safety i'        1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Regional Administrater, Region 111
!          U. S. liuclear Regulatory Commission l
799 Rossevelt Road l
Glen Ellyn, Illinois 60137
;                                                                                                              i l
l l
l
      . _    _ _ _ - _ . - - -        - _ . _ _ _ _ _ _ _ _ _ _ _}}

Latest revision as of 02:33, 24 October 2020