{{Adams
#REDIRECT [[IR 05000502/2006003]]
| number = ML20127D220
| issue date = 06/17/1985
| title = Notice of Violation from Insp on 850502-0603
| author name = Warnick R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000454
| license number =
| contact person =
| document report number = 50-454-85-21, NUDOCS 8506240160
| package number = ML20127D202
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000502/2006003]]
 
=Text=
{{#Wiki_filter:F
          *
! .
                                          Appendix
                                    NOTICE OF VIOLATION
    Commonwealth Edison Company                                  Docket No. 50-454
    As a result of the inspection conducted on May 2 - June 3,1985, and in
    accordance with the General Policy and Procedures for NRC Enforcement Actions,
    (10 CFR Part 2, Appendix C), the following violations were identified:
    Technical Specification 3.0.2 states:    " Noncompliance with a specification
    shall exist when the requirements of the limiting conditions for operation and
    associated ACTION requirements are not met within the specified time interval."
    Byron Administrative. Procedure, BAP 300-22, " Conduct of Operation" implements
    the requirements of Technical Specification 3.0.2 and states: "If any... condition
    indicates that a system is not operable as required by Technical Specifications,
    the Shift Engineer is to immediately begin the action required by the Technical
    Specifications as stated in the applicable LOCAR procedure."
    Technical Specificatinn 4.6.3.1 states:    "The isolation valves specified in
    Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to
    service after maintenance, repair or replacement work is perfomed on the valve
  or its associated actuator, control or power circuit by performance of a cycling
    test, and verification of isolation time."
  Technical Specification 4.4.8 states:      "The specific activity of the reactor
  coolant shall be determined to be within the limits by performance of the
  sampling and analysis program of Table 4.4-4.
  Contrary to the above:
  a.    On April 1,1985, while in Mode 1, the isolation time surveillance
        was not performed on containment isolation valve IPR 066.
  b.    On April 10, 1985, while in Mode 3, the required reactor coolant
        sample was not collected until 7.75 hours after a thermal change of
        28% in less than 1 hour.
  This is a Severity Level IV violation (Supplement 1).      (454/85021-01(DRP))
  Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this
  office within thirty days of the date of this Notice a written statement or
  explanation in reply, including for each item of noncompliance: (1)
  corrective action taken and the results achieved; (2) corrective action to be
  taken to avoid further noncompliance; and (3) the date when full compliance
  will be achieved. Consideration may be given to extending your response time
  for good cause shown.
        y!M i 7 fq0R
                                                b f i/l,5 y ., k
  Dated                                      R. F. Warnick, Chief
                                                                  #"
  G