ML20137C022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000903/2010031]]
| number = ML20137C022
| issue date = 11/22/1985
| title = Notice of Violation from Insp on 850903-1031
| author name = Paperiello C
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000346
| license number =
| contact person =
| document report number = 50-346-85-28, NUDOCS 8511260409
| package number = ML20137C005
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000903/2010031]]
 
=Text=
{{#Wiki_filter:__ -_
  .  .
e.
*
                                              Appendix
                                        NOTICE OF VIOLATION
                                                                            !
        Toledo Edison Company                                        License No. NPF-3
        As a result of the inspection conducted on September 3 through October 31, 1985,
        and in accordance with the General Policy and Procedures for NRC Enforcement
        Actions (10 CFR Part 2, Appendix C), the following violation was identified:
        10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting
        quality shall be prescribed by documented instructions, procedures... of a
        type appropriate to the circumstances and shall be accomplished in accordance
        with these instructions, procedures,...."
        Contrary to the above, the licensee's procedures were inadequate for fabricating,
        installing, and inspecting the plant pressure retaining safety related flexible
        boot seals.
        This is a Severity Level IV violation (Supplement I).
        Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this
        office within thirty days Lf the date of this Notice a written statement or
        explanation in reply, including for each item of noncompliance: (1) corrective
        action taken and the results achieved; (2) corrective action to be taken to
        avoid further noncompliance; and (3) the date when full compliance will be
        achieved. Consideration may be given to extending your response time for good
        cause shown.
                                                                          '
              Il n W
        Dated /
                                                      $b                      ~
                                                        C. U. Pap,(riello, Director
                      /                                Division of Reactor Safety
    4
                                                                              .
            8511260409
            PDR          851122
            0    ADOCK 05000346
                                PDR
}}

Latest revision as of 16:38, 25 September 2020