{{Adams
#REDIRECT [[IR 05000603/2007031]]
| number = ML20137E532
| issue date = 08/08/1985
| title = Notice of Violation from Insp on 850603-0731
| author name = Miller L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name =
| addressee affiliation =
| docket = 05000528
| license number =
| contact person =
| document report number = 50-528-85-21, NUDOCS 8508230274
| package number = ML20137E526
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000603/2007031]]
 
=Text=
{{#Wiki_filter:.
      .
    .
    ,                                              APPENDIX A
                                                NOTICE OF VIOLATION
                Arizona Nuclear Power Project                            Docket No. 50-528
                P. O. Box 52034                                          License No. NPF-41
              As a result of the inspection conducted on June 3 through July 31, 1985, and
                in accordance with NRC Enforcement Policy, 10 CFR Part 2, Appendix C,
                47 FR 9987, the following violation was identified.
                    Technical Specification 6.6.1.a requires that the Commission be notified
                      of Reportable Events, and a report be submitted pursuant to the
                      requirements of 10 CFR Part 50.73.
                      10 CFR Part 50.73 requires, in part, that a Licensee Event Report be
                    submitted within thirty days after discovery of any operation or
                    condition prohibited by the plant's Technical Specifications.
                    Contrary to the above, on April 23, 1985, the licensee discovered that
                    the Fuel Building Ventilation Monitor (RU-145) was inoperable, and as a
                    result had been in a condition since April 19, 1985 where no iodine
                    sampling of the fuel building ventilation system had occurred. This
                    condition, is prohibited by Technical Specification 3.3.3.9.b which
                    requires in part, that at a minimum, iodine samples of the fuel building
                    ventilation system be an.'.yzed at least once per twelve hours. Licensee
                    Event Report 85-32, describing this event, was submitted to the
                    Commission on June 14, 1985; a period in excess of thirty days after
                    discovery.
                    This is a severity level V Violation (Supplement 1).
              Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company is
              hereby required to submit to this office within thirty days of the date of
              this Notice, a written statement or explanation in reply, including: (1) the
              corrective steps which have been taken and the results achieved; (2)
              corrective steps which will be taken to avoid further items of noncompliance;
              and (3) the date when full compliance will be achieved.
              Consideration may be given to extending your response time for good cause
              shown.
                                                                            /
                                                                                /)'
                                                                              7
                      -f -                                                          3
                    Dated                                    L. F. Miller, M1'., Chief
                                                              Reactor Projects Section 2
          fjyDB230274850808
          G      ADOCK 05000528