ML20138H348: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000341/1985044]]
| number = ML20138H348
| issue date = 10/24/1985
| title = Physical Security Insp Rept 50-341/85-44 on 850930-1004.No Noncompliance Noted.Major Areas Inspected:Mgt Effectiveness, Security Organization,Testing & Maint & Security Program. Details Withheld (Ref 10CFR73.21)
| author name = Creed J, Madeda T, Pirtle G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000341
| license number =
| contact person =
| document report number = 50-341-85-44, NUDOCS 8510290017
| package number = ML20138H333
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 2
}}
See also: [[see also::IR 05000930/2010004]]
 
=Text=
{{#Wiki_filter:-                    .
                                                                                                                                                U. S. NUCLEAR REGULATORY COMMISSION
                                                                                                                                                              REGION III
                                Report No. 50-341/85044(DRSS)
                                Docket No. 50-341                                                                                                        License No. DPF-33              Safeguards Group IV
                                Licensee: Detroit Edison Company
                                                                                                                    2200 Second Avenue                                                                        <
                                                                                                                    Detroit, MI 48226
                                Facility Name:                                                                                            Enrico Fermi Atomic Power Plant
                                Inspection At:                                                                                            Plant Site
                                Inspection Conducted:                                                                                            September 30 through October 4, 1985
                                Da'te of Last Physical Security Inspection:                                                                                              June 10-14, 1985
                                Type of Inspection:                                                                                            Unannounced, Routine Physical Security
                                  Inspectors:                                                                                            1.1 b k O_                                        tolzstl65
                                                                                                                A ,T. J. Madeda                                                          Date
                                                                                                              7                        Physical Security Inspector
                                                                                                                                          33. 1 P i h .                                    i./2=tss
                                                                                                                                        G. L. Pirtle                                    Date
                                                                                                                                        Physical Security Inspector
                                Approved By:                                                                                                .
                                                                                                                                                                                            /0!aM!8f
                                                                                                                                            R. Creed, Chief                              Date
                                                                                                                                          afeguards Section
                                  Inspection Summary
                                Inspection on September 30 through October 4,1985
                                (Report No. 50-341/85044(DRSS))
                                Areas Inspected: Included a selective review of Management Effectiveness;
                                Security Organization; Testing and Maintenance; Security Program Audit;
                                Compensatory Measures; Access Control - Personnel; Access Control - Packages;
                                Alarm Stations; Training and Qualification; and the Safeguards Contingency
                                                                                                                                            851024                                  1:1cioure contains
                                                          Bg02JOO                                                                          0%$1                                      SAFEGU/RDS INFMTI@
                                                                                                                                                                                      UpOn separation thfy
                                                            $
                                                                                                                                                                                      TU is Decontrolled
  ____________- _________- _ ____ ____________ - -_. _ - _ _ _ - - _ _ _ _ _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
 
  .. .
      Plan. Additionally, the inspection included a review of licensee action on
      previous inspection findings. Also,' licensee action on two security related
      events (unauthorized use of security equipment and an inadequate compensatory
      measure) were reviewed by the inspectors. The inspection involved 70 direct
        inspection hours by two NRC inspectors.                                    m
      Results: The licensee was found to be in compliance with NRC requirements
      within the areas inspected.  In addition, all previously identified violations
      and open items are closed.
      (Details: UNCLASSIFIED SAFEGUARDS INFORMATION)
!
                                                                    b"closurecontains
                                                                    $MTGUARDS IWORMTION
                                                2                    Epon separation thip
                                                                    page is Decontvolled
      .    - .                          __                  -.
}}

Revision as of 20:34, 7 September 2020