ML20067B723: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:',
D hmg
. 2 %#Ma$p?AWMSWMwda%AMaMu=2Mm&MLM&MELAiaE;fWiin y mmygi?F?;Ti=sem%gr&                                  -    =
SMO Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 February 4, 1994 LIC-94-0044 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555
 
==Reference:==
Docket No. 50-285 Gentlemen:
 
==SUBJECT:==
Transmittal of Changes to the Fort Calhoun Station (FCS) Emergency Plan Implementing Procedures (EPIP)
In accordance with 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)( )(iii), the followin EPIP changes are enclosed for the Document Control Desk holder of Copy 165 and the NRC Region IV Administrator (holder of copies 15 , 155 and 156). P ease return the transmittal sheets to confirm your receipt of these changes.
REMOVE SECTION                                    INSERT SECTION EPIP Index, page 1, issued 12/30/93              EPIP Index, page 1, issued 1/17/94 EPIP Index, page 2, issued 8/26/93                EPIP Index, page 2, issued 1/27/94 EPIP-RR-17A, R8, issued 8/27/93                  EPIP-RR-17A, R9, issued 1/27/94 Summary of Chanaes EPIP Index pc,e 1 is being changed to correct the title of EPIP-E0F-19.              EPIP-RR-17A is b.      ) revis.< to change the Warehouse Foreman's Pager number. The task of transferring event chronology information and priorities tracking is being reassigned, and new instruction for transferring fuel oil from storage tank F0-10 to F0-1 is being added. Note: EPIP-RR-17A contains proprietary                            -
information.                                                                                      (' !/1 bp v\V f
                                                                                                                \
r l' d
2 Ac v u ,,,
                                                                                        .I      jfk ((b 1
a                                              1. t g
              ;jR22ggggJeM88ggs                                                      g                  [g                fg
    .s m. e
                                                  ~~_                                                                    /
Maie/FerMe
 
      !    +
U. S. Nuclear Regulatory Commission LIC-94-0044                                                            :
Page 2                                                                ,
If you should have any questions, please contact me.
Sincerely, 4V. k. &
W. G. Gates Vice President WGG/mah Enclosures c:      LeBoeuf, Lamb, Leiby & MacRae (w/o Enclosures)                ;
L. J. Callan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager (w/o Enclosures)
R. P. Mullikin, NRC Senior Resident Inspector (w/o Enclosures)
E 1
l I
                                      ,-}}

Revision as of 12:25, 6 September 2020

Forwards Public Version of EPIP Index,Pages 1 & 2 & Rev 9 to EPIP-RR-17A, TSC Administrative Logistics Coordinator Actions & Central Files Version of Rev 9 to EPIP-RR-17A. Central Files Version of Rev 9 to EPIP-RR-17A Withheld
ML20067B723
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/04/1994
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19303F907 List:
References
NUDOCS 9402250067
Download: ML20067B723 (2)


Text

',

D hmg

. 2 %#Ma$p?AWMSWMwda%AMaMu=2Mm&MLM&MELAiaE;fWiin y mmygi?F?;Ti=sem%gr& - =

SMO Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 February 4, 1994 LIC-94-0044 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Transmittal of Changes to the Fort Calhoun Station (FCS) Emergency Plan Implementing Procedures (EPIP)

In accordance with 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)( )(iii), the followin EPIP changes are enclosed for the Document Control Desk holder of Copy 165 and the NRC Region IV Administrator (holder of copies 15 , 155 and 156). P ease return the transmittal sheets to confirm your receipt of these changes.

REMOVE SECTION INSERT SECTION EPIP Index, page 1, issued 12/30/93 EPIP Index, page 1, issued 1/17/94 EPIP Index, page 2, issued 8/26/93 EPIP Index, page 2, issued 1/27/94 EPIP-RR-17A, R8, issued 8/27/93 EPIP-RR-17A, R9, issued 1/27/94 Summary of Chanaes EPIP Index pc,e 1 is being changed to correct the title of EPIP-E0F-19. EPIP-RR-17A is b. ) revis.< to change the Warehouse Foreman's Pager number. The task of transferring event chronology information and priorities tracking is being reassigned, and new instruction for transferring fuel oil from storage tank F0-10 to F0-1 is being added. Note: EPIP-RR-17A contains proprietary -

information. (' !/1 bp v\V f

\

r l' d

2 Ac v u ,,,

.I jfk ((b 1

a 1. t g

jR22ggggJeM88ggs g [g fg

.s m. e

~~_ /

Maie/FerMe

! +

U. S. Nuclear Regulatory Commission LIC-94-0044  :

Page 2 ,

If you should have any questions, please contact me.

Sincerely, 4V. k. &

W. G. Gates Vice President WGG/mah Enclosures c: LeBoeuf, Lamb, Leiby & MacRae (w/o Enclosures)  ;

L. J. Callan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager (w/o Enclosures)

R. P. Mullikin, NRC Senior Resident Inspector (w/o Enclosures)

E 1

l I

,-