TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II September 17, 1982 TVA-SQN-TS-36 i | |||
Mr. Harold R. Denton, Dhector Office of Nuclear 3eactor Regulation | |||
, U.S. Nuclear Regulatory Commission Washington, DC 20555 | |||
==Dear Mr. Denton:== | |||
In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications. The proposed changes to the technical specifications and justifications for the changes are provided in the following enclosures. | |||
Enclosure 1 - Change No. 1 - Diesel Generator Battery Float Voltage Enclosure 2 - Change No. 2 - Isolation Times for Containment Isolation Valves Enclosure 3 - Change No. 3 - Instrumentation Surveillance Requirement Test Frequency of Tables 4.3-1 and 4.3-2 Enclosure 4 - Change No. 4 - Changes to Reflect Installation of Permanent Hydrogen Mitigation System Enclosure 5 - Change No. 5 - Addition of Second Level of Undervoltage Protection NRC approval of the changes to the technical specifications, provided in Enclosures 4 and 5, is required for unit 1 of our Sequoyah Nuclear Plant before startup from the present refueling outage. | |||
s | |||
/@ | |||
PDR ADOCK820922O277 P 05000327 82f917 PDR An Equal Opportunity Employer | |||
4- . | |||
Mr. Harold R. Denton, Director September 17, 1982 In accordance with the provisions of 10 CFR Part 170.22, we have determined the proposed amendment to be Class IV for unit 1 and Class I for unit 2. | |||
This classification is based on the fact that the amendment involves several changes of the Class III type incorporated into this amendment and involves a second essentially identical unit at the same site. The remittance of $12,700 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch. | |||
Very truly yours, TENNESSEE VALLEY AUTHORITY DS W D. S. Kammer Nuclear Engineer Sworn to d subscrib d be ore me this./7 day of,. - | |||
, 1982 ftWJwk ~ | |||
Notar[Public My 06mmission Expires - | |||
i 9,![ 6 M Enclosures (40) cc: U.S. Nuclear Regulatory Commission Region II Attn: Mr. James P. O'Reilly, Regional Administrater 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303}} | |||
Revision as of 22:37, 7 August 2020
| ML20069D803 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/17/1982 |
| From: | Kammer D TENNESSEE VALLEY AUTHORITY |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20069D807 | List: |
| References | |
| TVA-SQN-TS-36, NUDOCS 8209220277 | |
| Download: ML20069D803 (2) | |
Text
l
,9
- g .
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II September 17, 1982 TVA-SQN-TS-36 i
Mr. Harold R. Denton, Dhector Office of Nuclear 3eactor Regulation
, U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications. The proposed changes to the technical specifications and justifications for the changes are provided in the following enclosures.
Enclosure 1 - Change No. 1 - Diesel Generator Battery Float Voltage Enclosure 2 - Change No. 2 - Isolation Times for Containment Isolation Valves Enclosure 3 - Change No. 3 - Instrumentation Surveillance Requirement Test Frequency of Tables 4.3-1 and 4.3-2 Enclosure 4 - Change No. 4 - Changes to Reflect Installation of Permanent Hydrogen Mitigation System Enclosure 5 - Change No. 5 - Addition of Second Level of Undervoltage Protection NRC approval of the changes to the technical specifications, provided in Enclosures 4 and 5, is required for unit 1 of our Sequoyah Nuclear Plant before startup from the present refueling outage.
s
/@
PDR ADOCK820922O277 P 05000327 82f917 PDR An Equal Opportunity Employer
4- .
Mr. Harold R. Denton, Director September 17, 1982 In accordance with the provisions of 10 CFR Part 170.22, we have determined the proposed amendment to be Class IV for unit 1 and Class I for unit 2.
This classification is based on the fact that the amendment involves several changes of the Class III type incorporated into this amendment and involves a second essentially identical unit at the same site. The remittance of $12,700 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch.
Very truly yours, TENNESSEE VALLEY AUTHORITY DS W D. S. Kammer Nuclear Engineer Sworn to d subscrib d be ore me this./7 day of,. -
, 1982 ftWJwk ~
Notar[Public My 06mmission Expires -
i 9,![ 6 M Enclosures (40) cc: U.S. Nuclear Regulatory Commission Region II Attn: Mr. James P. O'Reilly, Regional Administrater 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303