05000245/LER-1997-004, Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000245/LER-1997-004]]
| number = ML20138G476
| issue date = 04/30/1997
| title = Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr
| author name = Noll W
| author affiliation = NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000245
| license number =
| contact person =
| document report number = B16399, NUDOCS 9705060308
| package number = ML20138G480
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
{{LER
| Title = Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000245
| LER year = 2097
| LER number = 4
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:._ .          _ . _ . __. m_    ._ _  . . __ . _ . _                _-              ..              . _ _    ___
                                                                                                                                  \
            % N:rthest maa, mrm . nope rerry na., w.ierrora, er
                , Utilities System                                                    p.o. no, 32a Waterford, CT 06385-0128 (203) 447 1791
                                                                                                                                  ]
APR 301997 Docket No. 50-245 B16399 I
Rei 10CFR50.73(a)(2)(ii)
U.S. Nuclear Regulatory Commission                                                                                      I Document Control Desk                                            -
Washington, DC 20555 I
This letter forwards Licensee Event Report (LER) 97-004-01, documenting an event that                                  !
occurred at Millstone Nuclear Power Station, Unit No.1 on January 27, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).
This supplemental report documents the closure of Commitment No. B16213-1 "NNECO commits that a radiological assessment will be performed by March 21,1997, to determine the impact on off-site dose calculations based on the additional leakage from the penetration X-24.
Based on the results, an engineering evaluation will be performed on containment isolation valve 1-RC-206 to determine the corrective actions r< quired to assure that the offsite dose remains                        i within allowable limits. The results of the radiological assessment and any required corrective                        l actions will be provided in a supplement to this report by April 30,1997." The corrective actions                      l for this event have been identified.                                                                                    l The following is Northeast Nuclear Energy Company's (NNECO's) commitment made within this                              :
letter. All other statements made within this letter are for information only.                                          l B16399-1        NNECO commits that containment isolation valve 1-RC-206 will be modified to close within 60 seconds prior to primary containment being required for operating Cycle 16.
1 l
Very truly yours,                                                    !
l l                                                          NORTHEAST NUCLEAR ENERGY COMPANY For:    P. D. Hinnenkamp Director, Unit Operations GCCOM                                                                                                    g, j                                                          By:      W. G. Noll                                                  '
Manager, Operations f                        f                                                    kb                ,
l
 
l
  =
n
 
==Attachment:==
LER 97-004-01 cc: Dr W. D. Travers, Director, Special Projects Office II. J. Miller, Region I Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Easlick, Senior Resident Inspector, Millstone Unit No. I l
l l
l i
l l
I
.
}}
 
{{LER-Nav}}

Revision as of 08:09, 1 July 2020