05000321/LER-1982-043: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000321/LER-1982-043, Forwards LER 82-043/03L-0]]
| number = ML20054G535
| issue date = 06/04/1982
| title = LER 82-043/03L-0:on 820505,RHR Svc Water Pump 1E11-C001C Failed to Meet Flow & Discharge Pressure Requirements. Caused by Debris Entering Pump & Becoming Lodged in Impellers.Screens Repaired
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000321
| license number =
| contact person =
| document report number = LER-82-043-03L-01, LER-82-43-3L-1, NUDOCS 8206210660
| package number = ML20054G534
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 2
}}
{{LER
| Title = 
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000321
| LER year = 2082
| LER number = 43
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:'                                                                          '
s9RM 366                                                                                                                U. S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT                                                                                  l
        .          o CONTROL BLOCK: l 1
l    l    l      l  l 6
lh                  (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
E I Gl Al ElIl Hl 1l@l0l0l-l0l0l0l0l0l-l0l0l@l4l1Il11Ill@l 8 9            LICENSEE CODE              14    tb                    LICENSE NUMBER                    25    26      LtCENSE TYPE Ju l
57 CAT 58 l@
>N'T                                                                                                                                                                        '
b    8
                $u% l60L ]@l610 l 5 l DOCKET          0 l 0 NUMBER l 0 l 3 l 2 l 681 l@l    69 0 lEVENT 5 l DATE 0 l 5 l 8 74l 2 l@l    75    0lREPORT 6l 0l4 DATE l8 l280l@
EVENT DESCHIPTioN AND PROBABLE CONSEQUENCES h El                        On May 5,1982, with the reactor in cold shutdown, Residual Heat Removal                                                                      I gl                        Service Water Pump 1E11-C001C failed to meet flow and discharge pressure                                                                      l gi                        requirements as oatlined in Tech Specs Section 4.5.C.1.b.                                                    The redundant                  I gi                        pumps were operable. Plant operation nor public health and safety were                                                                        I gl                        a f fected.          This is a repetitive event as last reported on Reportable                                                              l gl                        Occurrence Report No. 50-321/1982-040.                                                                                                      I EI  g 9                                                                                                                                                            80 I
r LE              CODE        SUSCO E                  COMPONENT CODE                  SUBC DE          SU    E E                              l C l F l@ [XJ@ l Z l@ lP lU llt IP lX lX l@ [_B_J@ W @
SEOUE N TI AL                      OCCUR RE NCE        REPORT                  REVISION (g p gg      EVENTYEAR                            REPORT NO.                            CODE              TYPE                      N O.
          @ Rie g                                  l-l            l0 14 l3 l              l/l          l013l                [_LJ
[. j      l0 l
_  l21 8l21 2l        JJ            24            26        27          28      29          30            31        32 TAKEN ACTO                    ON LANT              T                    HOURS 22        S$B IT D      FOR      8.      SU plt R          MANUFACTURER lDlggg 33          J4
[35Zjg          g g 36 l0 l0 l0 lU l 3/                    40 Q@
41 lN 42 l@          [Aj@ lJ l1 l0 l5 l@
43          44            47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h pl                        The failure was due to debris entering the pump and becoming lodged in                                                                        l gl                        the impellers.                  The source of debris is attributed to maintenance work                                                        i gi                        in the area and the breakdown of traveling water screens. The screens                                                                        l gg                      were repaired and improved methods for securing materials were implemented.                                                                  l Divers were contracted to remove debris from the suction pit.                                                                                l 8 9                                                                                                                                                            80 ST      S            % POWE R                    OTHER STATUS              DISCOV RY                          DISCOVERY DESCRIPTION Inservice Inspection and Surveillance l E lHl@ l010l0l@l                                            NA                    l    l8l@l A TIVITY        CO TENT HELEA$t        OF HE LE ASE                AMOUNT OF ACTIVITY                                                    LOCATION OF RELEASE E W @D [Zjgl              10 NA 44 l          l 45 NA 80 l
H 9                              11 PE HSO%f L F
* POSUnES NUUHFH g l0l0l0l@lZTVPi                        [
                                                @l DESCRIPTION                              NA l
    " '        PinsOma',N,ub Novm n              ntsCniPriON@
g l0l0l0lgl                                                                                  NA                                                                      l 8 9                    11      12                                                                                                                            80 t 055 OF Of DA          C TO F AitLt TY E [Zjgl                                                                                      NA                                                                      l Punul:ErY                        8206210660 820604                                                                              NRC USE ONW PDR ADOCK 05000321                                                                                                       ,
@ b,E @otscn>
iw l                    prion S        @                      PDR                                                l    lllllllIlllll}
H 9              to                                                                                                            68 69                        80 5 NAVE OF PREPARER                                                                              PHONE:
 
LER No. : 50-321/1982-043 Licensee: Georgia Power Company
                                      ~ Facility: Edwin I. Hatch Docket No.: 50-321 Narrative Report.
for LER 50-321/1982-043.
On May 5,1982, RHR Service Water _ Pump-(RHRSW) Pump,- 1E11-C001C, was being tested per HNP-1-3167, RHR Service Water Pump Operability and Rated Flow',
during a scheduled inservice inspection.
The performance of HNP-1-3167 showed that RHRSU Pump 1E11-C001C would not meet the rated flow and system head requirements of Tech Specs Section 4.5.C.1.b (at least 4000 GPM at a system head of at'least 847 feet. For the river level -existing on fiay 5,1982, this was equivalent to at least -
4000 GPM at a pump discharge pressure of at least- 350 PSIG. The results of the test on pump IEll-C001C were 2939 GPM at 235 PSIG.
The failure of RHRSU Pump IE11-C001C to meet rated flow and system head requirements was due to debris lodged in the impellers. The source of the debris has been attributed to maintenance activities in the area and the breakdown of traveling water screens. Improved methods for securing maintenance materials were implemented and the screens repaired. Divers were contracted to inspect and remove debris from the suction pit. The pump was pulled and rebuilt (refer to MR 1-82-2409). The pump was then reinstalled and successfully retested per HNP-1-3167. Retest data, taken on May 12, 1982, showed 4025 GPM at a discharge pressure of 380 PSIG (acceptance criteria: at least 4000 GPM at at least 347 PSIG).
This is a repetitive event as last reported on Reportable Occurrence Report No. 50-321/1982-040. There were no effects on public health or safety due to this event.
}}
 
{{LER-Nav}}

Latest revision as of 21:47, 18 March 2020