ML051520362: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 35: | Line 35: | ||
: 5. Master markup clean typed file: 9900, DNC cc w/encls: See attached page | : 5. Master markup clean typed file: 9900, DNC cc w/encls: See attached page | ||
PACKAGE: ML051520361, LETTER: ML051520362, ENCLOSURE 4: ML051520367, ENCLOSURE 5: ML051520373 OFFICE TSS:IROB:DIPM SC:TSS:IROB:DIPM NAME CSSchulten THBoyce DATE 06/01/20045 06/01/2005 | PACKAGE: ML051520361, LETTER: ML051520362, ENCLOSURE 4: ML051520367, ENCLOSURE 5: ML051520373 OFFICE TSS:IROB:DIPM SC:TSS:IROB:DIPM NAME CSSchulten THBoyce DATE 06/01/20045 06/01/2005 DISTRIBUTION: | ||
DISTRIBUTION: | |||
ADAMS PUBLIC IROB R/F TSS Staff RidsNrrDipm RidsNrrDssa RidsNrrDlpm RidsNrrDssaSplb RidsNrrDipmlehb RidsOgcRp RidsAcrsAcnwMailCenter BDesai (BBD) | ADAMS PUBLIC IROB R/F TSS Staff RidsNrrDipm RidsNrrDssa RidsNrrDlpm RidsNrrDssaSplb RidsNrrDipmlehb RidsOgcRp RidsAcrsAcnwMailCenter BDesai (BBD) | ||
SUnikewicz (SMU) | SUnikewicz (SMU) |
Latest revision as of 19:51, 14 March 2020
ML051520362 | |
Person / Time | |
---|---|
Issue date: | 06/01/2005 |
From: | Schulten C NRC/NRR/DIPM/IROB |
To: | Schoppman M Nuclear Energy Institute |
Schulten C. S., NRR/IROB/TSS, 415-1192 | |
Shared Package | |
ML051520361 | List: |
References | |
Download: ML051520362 (8) | |
Text
June 1, 2005 Mr. Mike Schoppman Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
Dear Mr. Schoppman:
SUBJECT:
SUMMARY
OF MEETING ON MAY 10-13, 2005, WITH THE NUCLEAR ENERGY INSTITUTE (NEI) OPERABILITY DETERMINATION PROCESS TASK FORCE The purpose of this letter is to transmit the summary of the NRC staff meeting with the Operability Determination Process Task Force. The meeting was held at the Excel Services Corporation offices in Rockville, from May 10 through May 12, 2005. The agenda of the meeting concluded ahead of schedule, therefore, no meeting was held the last day of the scheduled meeting, Friday, May 13, 2005. At the meeting, the staff and task force members finalized discussions on all proposed changes to operability guidance for resolution of degraded or nonconforming conditions adverse to safety or quality.
Sincerely,
/RA/
Carl S. Schulten, Senior Reactor Engineer Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
Enclosures:
- 1. Meeting Summary
- 2. Agenda
- 3. Attendance List
- 4. Draft RIS file: NRC_50605 markup
- 5. Master markup clean typed file: 9900, DNC cc w/encls: See attached page
PACKAGE: ML051520361, LETTER: ML051520362, ENCLOSURE 4: ML051520367, ENCLOSURE 5: ML051520373 OFFICE TSS:IROB:DIPM SC:TSS:IROB:DIPM NAME CSSchulten THBoyce DATE 06/01/20045 06/01/2005 DISTRIBUTION:
ADAMS PUBLIC IROB R/F TSS Staff RidsNrrDipm RidsNrrDssa RidsNrrDlpm RidsNrrDssaSplb RidsNrrDipmlehb RidsOgcRp RidsAcrsAcnwMailCenter BDesai (BBD)
SUnikewicz (SMU)
WBJones (WBJ)
ESullivan (EJS)
DJNelson (DJN)
JTsao ( JCT)
SAlexander (SDA)
DTerao (DXT)
RBlough (ARB)
EReichelt (EGR3)
SBurton (SXB3)
LTrocine (LXT)
JTrapp (JMT1)
WReckley (WDR)
HChernoff (HKC)
cc via e-mail:
Mr. Mike Schoppman, Nuclear Energy Institute Ms. Laurie Lahti, Nuclear Management Company Mr. Jeff Thomas, Duke Energy Mr. Jim Kilpatrick, Constellation Energy Mr. Donald Hoffman, Technical Specifications Task Force Mr. Brian Mann, Technical Specifications Task Force Ms. Patricia Campbell, Morgan Lewis Ms. Deann Raleigh, LIS Scientech
SUMMARY
OF THE MAY 10 -13, 2005, NUCLEAR REGULATORY COMMISSION MEETING WITH THE NUCLEAR ENERGY INSTITUTE OPERABILITY DETERMINATION PROCESS TASK FORCE From May 10 through May 12, 2005, the Technical Specifications Section Staff met with the Task Force at the Excel Services Corporation offices in Rockville, Maryland. The agenda of the meeting concluded ahead of schedule, therefore, no meeting was held the last day of the scheduled meeting, Friday, May 13, 2005. This was final of three scheduled meetings between the Task Force and the Staff for discussing comments on draft RIS 2004-XX for updating Manual Chapter Part 9900 guidance on operability and resolution of degraded or nonconforming conditions which was noticed for public comment August 2004.
A copy of the agenda (Enclosure 2) and a list of attendees (Enclosure 3) are attached. contains a Draft RIS file dated May 6th (050605 markup) which incorporates agreements made at the previous, April 25th meeting, for all affected sections. This file was the starting point for the master markup and discussions during the May 10-12, 2005, meeting.
The final typed revision to the guidance document (Enclosure 5) incorporates all agreements made at the May 10-12, 2005, master markup meeting.
During the meeting the Staff and the Task Force reviewed the entire guidance document with initial discussions focusing on Appendix B, Maintenance and Appendix C, Specific Operability Issues, to address topics that were not covered at previous meetings. The Staff and Task force objectives for revising the guidance continued to be to ensure clarity of the process for both inspectors and operators in a plain language document. The Staff and the Task Force also agreed to the following:
- Definitions (Section 3.4, Operability Determination) - This section was incorporated into Section 3.3, Operability because as written in the guidance, there was no discernable difference between these processes. In support of this change a new defined term, Operability Declaration was written, since this is a fundamental concept in the operability determination process.
- Definition (Section 3.6.2, Specified Safety Function) - This definition was clarified to include a broader use of terminology to ensure the appropriate scope of SSCs, as required by the plant current license basis, are considered for operability determinations.
A clarification was made to include events beyond the scope of design basis, such as station blackout and ATWS, if they were included when the plant-specific specified safety function scope was established. In addition, the guidance identifies typical documents that contain definitions of SSC specified safety function(s): Bases of the TS; plant UFSAR; and documents from license amendments such as safety analyses, requests for additional information and saftety evaluations.
- Operability Determination Process (Section 4.5, Timing of Operability Determinations)
- The general guidance to licensees, take action without delay when a potential degraded or nonconforming condition (DNC) is identified, was moved from Section 4.5 into a new section, Section 4.2, Potential Degraded or Nonconforming Conditions. This Enclosure 1
clarifying change keeps all guidance discussions of ODP timing considerations in the Immediate and Prompt Determination steps of the ODP. This change also eliminates potentially contradictory guidance which would have allowed a limited amount of time to confirm the existence of a degraded or nonconforming condition during the discovery process. Thus, ODP timing considerations during the Immediate and Prompt steps of the ODP rely on a reasonable expectation standard for assessing operability regardless of the stage of the determination process.
- Operability Determination (Section 4.8 - Operator Awareness and Responsibilities) -
This new guidance was added to clarify that the role of the control room operations staff is an ongoing responsibility during discovery of DNCs and during the Immediate and Prompt steps of the ODP.
- Corrective Action (Section 7.2, Timing of Corrective Actions) - Existing guidance, to implement repair or replacement activities at the next on-line maintenance window or outage of sufficient duration to adequately plan and implement the proposed corrective action is updated to be at the first available opportunity unless an appropriate longer completion schedule is justified.
- Appendix B, Maintenance (B.4, Reduced Reliability as a Degraded or Nonconforming Condition) - This section is provide to update ODP guidance with respect to 10 CFR 50.65. SSCs experiencing multiple or repetitive failures have a reduced reliability which must be evaluated to determine if the nature or extent of the reduced reliability constitutes a degraded or nonconforming condition. Various factors may contribute to reduced reliability, aging is one factor of increasing importance that should be addressed in the ODP.
AGENDA MAY 10-13, 2005 PUBLIC MEETING ROCKVILLE, MARYLAND NEI OPERABILITY DETERMINATION PROCESS TASK FORCE 8:30 am - 4:30 pm I. Prepare a Master Markup of MC 9900, Assessing Operability Determinations and Resolution of Degraded and Nonconforming Conditions II. Identify Open Items Pending Receipt Information for Final Markup May 27, 2005 Enclosure 2
ATTENDEE LIST MAY 10 - 13, 2005 PUBLIC MEETING ROCKVILLE, MARYALND NEI OPERABILITY DETERMINATION PROCESS TASK FORCE NAME AFFILIATION Carl S. Schulten NRC\NRR\TSS\IROB\DIPM Nancy Salgado NRC\NRR\TSS\IROB\DIPM Laurie Lahti Nuclear Management Company laurie.lahti@nmcco.com C. Jeff Thomas Duke Energy - Mcguire cjthomas@duke-energy.com James Kilpatrick Constellation Energy - Calvert Cliffs james.c.kilpatrick@constellation.com Patricia Campbell Morgan Lewis, pcampbell@morganlewis.com Mike Schoppman NEI, mas@nei.org Brian Mann TSTF\EXCEL, brianm@excelservices.com Donald R. Hoffman TSTF\EXCEL, donaldh@excelservices.com Thomas Boyce NRC\NRR\TSS\IROB\DIPM R. A. Musser NRC/Region II Michael Matheson NPPD, mdmathe@nppd.com Deann Raleigh LIS, Scientech Harold Chernoff NRC/NRR/DLPM Bill Reckley NRC/NRR/DLPM Steve Alexander NRC/NRR/DIPM Chris Earls NEI, CEE, cxe@nei.org Mike Coyle NEI, mtc@nei.org Edmund Sullivan NRC/NRR/DE
- John Sair NRC/NRR/DE
- David Terao NRC/NRR/DE
- Steve Unikewicz NRC/NRR/DE
- participation by telephone conference bridge Enclosure 3