ML17209B109: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17266A457
| number = ML17266A457
| issue date = 05/07/1981
| issue date = 05/07/1981
| title = Forwards LER 81-016/03L-0
| title = LER 81-016/03L-0:on 810407,during Routine Surveillance Testing,Rwt Outlet Valve MV-07-1A Failed to Reopen Electrically.Caused by Faulty Mechanical Stop Mechanism. Mechanism Was Repaired & Checked Satisfactorily
| author name = Pace P
| author name = Pace P
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Latest revision as of 10:11, 8 March 2020

Forwards LER 81-016/03L-0
Date released: 01/25/2018 Download: ML17209B109


LER 81-016/03L-0:on 810407,during Routine Surveillance Testing,Rwt Outlet Valve MV-07-1A Failed to Reopen Electrically.Caused by Faulty Mechanical Stop Mechanism. Mechanism Was Repaired & Checked Satisfactorily
ML17266A457
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/07/1981
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A457 (1)
Forwards LER 81-016/03L-0
ML17209B108
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/07/1981
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209B108 (1)