ML17345A181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 21: Line 21:
| number = ML17345A180
| number = ML17345A180
| issue date = 05/09/1988
| issue date = 05/09/1988
| title = Forwards Corrected LER 88-004,correcting Event Date in Block 5 of Rept Form as Submitted W/Util 880509 Ltr
| title = LER 88-004-00:on 880408,Tech Spec 3.5-2,Item 3.2.b Exceeded. Caused by Failure of Relays in Undervoltage Protection Scheme.Relays Replaced & Satisfactorily Tested Before Unit Shutdown Commenced
| author name = Hart R
| author name = Hart R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Latest revision as of 21:29, 6 March 2020

Forwards Corrected LER 88-004,correcting Event Date in Block 5 of Rept Form as Submitted W/Util 880509 Ltr
Date released: 07/31/2018 Download: ML17345A181


Forwards Corrected LER 88-004,correcting Event Date in Block 5 of Rept Form as Submitted W/Util 880509 Ltr
ML17345A182
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/19/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML17345A182 (2)
LER 88-004-00:on 880408,Tech Spec 3.5-2,Item 3.2.b Exceeded. Caused by Failure of Relays in Undervoltage Protection Scheme.Relays Replaced & Satisfactorily Tested Before Unit Shutdown Commenced
ML17345A180
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/09/1988
From: Hart R
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17345A180 (4)