ML19338D493: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 57: | Line 57: | ||
' 24. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each1: | ' 24. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each1: | ||
Currently =in Cycle 4 refuel outage, 1 | Currently =in Cycle 4 refuel outage, 1 | ||
i | i | ||
: 25. If Shur Down At End Of Report Period. Estimared Date of Startup: - October 18, 1980 , | : 25. If Shur Down At End Of Report Period. Estimared Date of Startup: - October 18, 1980 , | ||
| Line 71: | Line 70: | ||
l a | l a | ||
t.*. ~ | t.*. ~ | ||
~ | ~ | ||
AVER AGE D ril UNITPOWER LEVEL . | AVER AGE D ril UNITPOWER LEVEL . | ||
| Line 112: | Line 110: | ||
Summary: The unit operated.at or near 100% rated thermal power except for the down po.fer on the lith for dropped C.E. A. 's and the shutdown for cycle 4 refueling. | Summary: The unit operated.at or near 100% rated thermal power except for the down po.fer on the lith for dropped C.E. A. 's and the shutdown for cycle 4 refueling. | ||
(9/77) , | (9/77) , | ||
Dock:;t No. . 50-336- | Dock:;t No. . 50-336- | ||
Revision as of 10:05, 18 February 2020
| ML19338D493 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/03/1980 |
| From: | Howlett G NORTHEAST UTILITIES |
| To: | |
| Shared Package | |
| ML19338D492 | List: |
| References | |
| NUDOCS 8009230347 | |
| Download: ML19338D493 (5) | |
Text
. ; - , __- - .
R,
- 9
.f- >
, t OPERATING DATA REPORT DOCKEINO. 50-336
. DATE MF
.CO3!PLETED BY - C2.H. ITOW ett '
OPERATING STATUS :
- 1. Unir Namei Millstone 2 Notes
- Items 21 & 22-,
- 2. Reporting Period: August cumulative ~ are computed
- 3. Licensed Thennal Power (31Wri: 2700 using a weighted average.
- 4. Nameplate Rating (Gross .\!We): 909
- 5. Design Electrical Rating (Net .\fWe):870
_895
- 6. 31asimum Dependable Capacity (Gross 31We):' 864
- 7. Stasimum Dependable Capacity (Net 31We):
S. If Chans cut in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lesel To Which Restricted.lf Any (Net 31We): one 10.- Reasons For Restrictions. If Any: --None This 5fonth ' Yr..to.Date Cumulatise i1. Hours in Reporting Period . 744 5,855 41,063
- 12. Number Of Hours Reactor Was Critical 368.5 4,276.7 29,355.8
- 13. Reactor Reserie Shutdown Ifours U .U 2,0/2.4
- 14. Hours Generator On Line 368.0 4, I83.6 ~
0 28,003.8
- 15. Unit Resene Shutdown Hours 0
~
- 16. Gross Therma! Emigy Generated O!WH) 958,023- 335.4 11,020,276 68,718,904
- 17. Gross Electrical Energy Generated (>!WHI 315,545 _ ,, 3,614,072 22,198,71/
- 18. Net Electrical Energy Generated (31WH) 302,334 3,471,253.
- 19. Unit Senice Factor--
21,251,511__
_ 49.5 ~71.5 68.2
-20. Unit Assi! ability Factor 49.5 71.5 DTT 47.0
~
- 21. Unit Capacity Factor (Using af CC Nett 68.6~ '" bd . tf .
22.- Unit Capacity Factor (U>ing DER Netl ~ 46.7 bd.I *
~ 23. Unit Forced Outage Rate 61.6-0 23.6
~
23.8
' 24. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each1:
Currently =in Cycle 4 refuel outage, 1
i
- 25. If Shur Down At End Of Report Period. Estimared Date of Startup: - October 18, 1980 ,
- 26. Units in Test Statu> (Prior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICA llTY _ N/A N/A INITIA L ELECTRICITY N/A N/A Cost \tERCI \L OPER \ TION N/A _ N/A l
H en n !
l 80092303"47: ^ - " - - ' - - -
E_
' ~
J
yy- , . - . .= - .-
l a
t.*. ~
~
AVER AGE D ril UNITPOWER LEVEL .
DOCKET NO.
50-336 Millstone 2
~
. UNIT _
DATE 9/2/80l CO\fPLETED BY- G.H. Howlett-- .
TELEPHONE ' :(203)447-1791X364 -
SloNTH IAugust 1980-DAY-
. AVERAGE DAILY POWER LEVEL DAY (SiWr Net) AVERAGE DAILY POWER LEVEL 857 (MWe Net) 3 37 0- (-6) 2 857 0 (-5) gg 3 857:
19 0 (-5) 4 857 20
- 0. (-4) 5 858
, 21 0 (-4) 6 857
~
22 0 (-4) 7- 856 23 0 (-4) 8 - 856 24 0 (-4)'
9 854 25 0 ~( 4) 10 - 854-26 0- -(-4) 31 818 l 27 0 (.-4 )
12 632' 2S 0 (. 4) l
-13 788 l 29 0 (.4) 14 838' 30 0 (-5)' l
" 15 854 :l 31 0 (.5) 16- 171 I
~!
INSTRUCTIONS Onnearest the this form'21.!ist whole megawatt. the averale daily unit power leselin MWe-Net for each day in the repo -
19 G 7 )
,' -- s ,
F d )
I KE
'50-336 UNIT SilUTDOWNS AND POWER REDUCTIONS '
1 NAME. Miilstone 2--
DATE 9/4/80 REPORT MONTil August COMPLETED BY G.H. Howlett ELEPHONE (2UdI447-l7.qX364
- "b y No. Date g
.!Y j
) $ .Y 5 g5 Ucensee Event
.E%
p % . Cause & Corrective Action to o ::. a: ga Report # in U g{ Prevent Recurrence 6
'12 800811 F 0 -H N/A LER 80-28 RB CRDDRVE Dropped C.E.A. #41 forced a power reduction ( 70%) per specs. Upon retrieval of C.E.A. #41 a seconct L.E.A. #65 dropped. The apparent cause was due to a. faulty jumper cable .
The rod was realigned,with' subsequent nonnal power operations.
A checkout of the complete cabling system is scheduled during the cycle 4 refuel outage.
13 800816 S 376 C 1 Commenced Cycle 4 refuel outage.
Summary: The unit operated.at or near 100% rated thermal power except for the down po.fer on the lith for dropped C.E. A. 's and the shutdown for cycle 4 refueling.
(9/77) ,
Dock:;t No. . 50-336-
~-* 'Date:' S:ptemoer iI, I20
,- Completed By: G.H. Howlett III Telephon : 203/447-1971 X364
-REFUELING INFORMATION REQUEST
- 1. Name of facility: Millstone 2
- 2. Scheduled date for next refueling shutdown:
Consnenced refuel outage August 16, 1980.
- 3. Schedule date for restart following-refueling:-October 18, 1980
- 4. Will refueling or' resumption of operation thereafter require a technical specification change or other license amendment?
Technical Specification changes will be necessary as a result of the change in fuel and safety analysis supplier.
- 5. Scheduled date(s) for submitting licensing action and supporting infornation:
The schedule far subm;mng license action is as follows:
Basic Safety-Report 3-6-80.
Additional licensing documentation in support of cycle four (4) operation will be provided in response to Nuclear Regulatory-Commission staff questions.
- 6. Important licensing considerations associated with refueling, e.g., new or .
dif'erent fuel design or supplier, unreviewed design'or performance analysis '
methods, significant changes in fuel design, new operating procedures.
Cycle 4 will be unique in that it will be the first where the fuel l and safety analysis will be supplied by Westinghouse.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: 1
~
(a) In Core: 217 (b) 144
- 8. The present licensed ~ spent fuel pool storage capacity and the size of any increase in licensed storage cape. city that has been requested or is planned,
. in number of fuel assemblies: i 667 9.
The projected date of the last' refueling that can be discharged to the spent fuel pool assuming the presert licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.
R
Dockst No. 50-336-
~ Pag 2 of- Date Teptemoer it, ivuu ~
3 Unit Name utiistnn, p-Completed By G.'H Howlett Telephone (2031447-1791 X364 CORRECTIVE MAINTENANCE -SUPNARY FOR SAFETY RELATED EQUIPMENT Report Month July 1980 DATE'- 3YSTEM COMPONENT MAINTENANCE ACTION 7/1/80 No major corrective maintenance-was reported-7/31/80- during'this time period.
e I
_ _ _ _ . . _ . _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _