MONTHYEARML20126D7211992-12-16016 December 1992 Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20215G5351986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20215G6801986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20197H2581986-05-0808 May 1986 Part 21 Rept 135 Re Defect W/Lube Oil Sump Tank Foot Valve of Standby Diesel Generator.Caused by Extrusion of Liner Matl Due to Overpressurization.Corrective Actions Being Developed.List of Affected Sites Modified ML20205N6811986-04-14014 April 1986 Final Part 21 & Deficiency Rept 86-03 Re Consolidated Pipe & Valve Supply,Inc Certified Matl Test Repts.Initially Reported on 860321.Six raised-face Orifice Flanges Statused & Segregated Per QA Procedures ML20205N7381986-04-14014 April 1986 Interim Deficiency & Part 21 Rept 86-02 1 Re Elastomer Liner in Clear Flow Co Foot Valves Used in Lube Oil Sump Tanks of Tdi Diesel Generators.Initially Reported on 860321. Action Will Not Be Pursued Unless Facility Reactivated ML20140H5991986-03-24024 March 1986 Second Interim Deficiency Rept 86-01 Re Error in Bechtel Computer Analysis Program.Initially Reported on 860121.No Corrective Actions Will Be Pursued & No Further Repts Will Be Submitted Unless Project Reactivated ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153F5391986-02-14014 February 1986 Interim Part 21 & Deficiency Rept Re Error in Bechtel Computer Analysis Program ME101.Initially Reported on 860121.No Corrective Actions or Further Repts Will Be Submitted Until Project Reactivated ML20137N6101986-01-10010 January 1986 Interim Part 21 & Deficiency Rept 85-08 Re Isolated Failures of Betts Spring Co Intake & Exhaust Valve Springs Reported by Tdi.Initially Reported on 851218.Corrective Actions Will Be Pursued If Units Reactivated ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20138B9531985-10-0909 October 1985 Interim Deficiency Rept Re Larger than Anticipated Util Movement Where Freezewall Crossed safety-related Utils at Monitoring Pits 1,2,3 & 4.Initially Reported on 850917.No Action Will Be Taken ML20138C3111985-10-0808 October 1985 Interim Deficiency Rept Re Limitorque motor-operated Butterfly Valves Not Opening Electrically After Closed Manually.Initially Reported on 850912.No Corrective Actions Will Be Taken Unless Facility Reactivated ML20138C3251985-10-0808 October 1985 Interim Deficiency Rept Re Loose Set Screws on Anchor Darling Swing Check Valves & Disc Nut Pin Problems Causing Inoperability.Initially Reported on 850912.No Further Corrective Action Will Be Taken Unless Facility Reactivated ML20132B0261985-09-0303 September 1985 Part 21 Rept Re Possibility of Engine Ingestion of Unwelded Part in American Air Filter Standby Diesel Generator Intake Silencer.Immediate Hold Should Be Placed on Diesel Engines/Intake Silencers Not Yet in Svc ML20132D3191985-07-10010 July 1985 Interim Part 21 & Deficiency Rept Re Rupture During Testing by Wj Woolley Co of Inflatable Seal,Mfg by Presray Corp,Used in Personnel Air Locks in Reactor Containment Sys.Initially Reported on 850614 ML20129G0601985-04-26026 April 1985 Interim Deficiency Rept Re Potential for Cracking of Check Valves in on-engine Mounted Starting Air Piping of Tdi Diesel Generators.Initially Reported on 850401.Cause Not Determined.No Corrective Actions.Related Correspondence ML20112J3951985-03-22022 March 1985 Interim Part 21 & Deficiency Rept Re Failure of Gulf & Western MSIV Actuator Latch Roller Bearing.Matter Will Not Be Pursued Unless Plants Reactivated ML20114D3571984-12-21021 December 1984 Interim Deficiency Rept Re Diesel Fuel Oil Tank Soils Borings.Initially Reported on 841121.No Corrective Actions Necessary Due to Present Project Shutdown ML20100K9791984-11-27027 November 1984 Part 21 & Interim Deficiency Rept Re Ruskin Mfg Co Interlocking Blade Fire Dampers.Initially Reported on 841121.Corrective Action Will Not Be Pursued & No Further Repts Will Be Made Unless Plant Reactivated ML20100D9841984-11-21021 November 1984 Deficiency Rept Re Diesel Fuel Oil Tank Boring Logs.Util Response to Dow Chemical Co 841113 Request for Admissions Encl ML20100E4451984-11-15015 November 1984 Interim Deficiency Rept Re Cardinal Industrial Products Corp Spare Studs Received W/O Ultrasonic Exam.Initially Reported on 841010.Corrective Actions Will Not Be Pursued Unless Midland Reactivated ML20100E2621984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Rosemount 1153 Series B Transmitters Potentially Leaking.Initially Reported on 841010.Four Units Shipped to Facilities.Corrective Actions Will Not Be Pursued ML20100E2371984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Tdi Fuel Control Level Cap Screws.Initially Reported on 841010.No Corrective Actions Will Be Pursued & No Further Repts on Subj Made Unless Midland Reactivated ML20099E3531984-11-0909 November 1984 Interim Deficiency Rept Re Small Bore Piping Anchor Design. Initially Reported on 840816.Listed Corrective Actions Will Not Be Pursued & No Further Repts Will Be Made Unless Facilities Reactivated ML20093H3961984-08-0202 August 1984 Interim Deficiency Rept Re Seismic Qualification of Power Supplies for Eccas & Ni/Rps Equipment.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20093H8521984-08-0202 August 1984 Interim Deficiency Rept Re Field Installation of Itt Grinnell Struts & Extension Pieces.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20093H8111984-07-27027 July 1984 Final Part 21 & Deficiency Rept Re Capstan Springs in Mechanical Shock Arrestors Supplied by Pacific Scientific. All Suspect Shock Arrestor Capstan Springs Will Be Inspected for Cracks & Defective Springs Replaced ML20096A7781984-07-27027 July 1984 Final Deficiency Rept Re Defective Capstan Springs in Pacific Scientific Mechanical Shock Arrestors.Initially Reported on 840106.W/o Description of Investigation & Corrective Actions.Related Correspondence ML20093H8871984-07-20020 July 1984 Interim Deficiency Rept Re Reactor Coolant Pump Seals & Seal Covers.Initially Reported on 840622.No Activity Currently Being Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20093H4751984-07-17017 July 1984 Interim Deficiency Rept Re Core Flood Line Piping Supports in Reactor Pressure Vessel Connection Supplied by Bechtel. Overstressing Could Occur in Pipe Supports.No Commitment Made for Further Repts ML20093G7891984-07-11011 July 1984 Final Deficiency Rept Re Concrete Embedment Design Using Shear Lugs Located Outside Compression Zone.No Corrective Action Required.Not Reportable Under 10CFR50.55(e) ML20096A2951984-07-11011 July 1984 Final Deficiency Rept Re Concrete Embedment Design Using Shear Lugs Located Outside Compression Zone.Initially Reported on 821203.Use of Shear Lugs Outside Compression Zone Is Proper Design Technique.Related Correspondence ML20093D1511984-07-0909 July 1984 Final Deficiency Rept Re Excessive Wear to Pacific Air Products Linear Converter Shaft Guides.Initially Reported on 840228.Vendor Drawings Reviewed to Ensure All safety-related Dampers Identified ML20093F7131984-07-0606 July 1984 Interim Deficiency Rept Re Differential Settlement Between Diesel Generator Structure & Pedestal.Svc Water Piping Modified,Investigation of Similar Conditions Completed & Personnel Retrained.Next Rept Expected by 840928 ML20093F8311984-06-30030 June 1984 Final Deficiency Rept Re Attachment of non-q/non-seismic Piping to Component Water Sys.Initially Reported on 831216. Investigation Completed.Training Session Held to Reinstruct Design Stress Group on Total Loads ML20093D2041984-06-29029 June 1984 Interim Deficiency Rept Re Sys for Processing Field Changes for Project Design Documents.Program Initiated for Document Review,Audit Performed & Interface Procedure Implemented. Next Rept Will Be Submitted by 841231 ML20093E1431984-06-29029 June 1984 Interim Deficiency Rept Re delivered,safety-related Itt General Controls Electrical Equipment Not Meeting Project Requirements.Evaluation Underway.Interim or Final Rept Expected by 841231 ML20090C8381984-06-29029 June 1984 Interim Deficiency Rept Re Reactor Bldg Spray Piping Supports.All Engineering Corrective Actions Complete.Matl Required for Repairs Procured.Next Rept Will Be Submitted by 850125 ML20092K6121984-06-15015 June 1984 Interim Deficiency Rept Re Control of Retroactive Design Changes.Initially Reported on 840518.Investigation Continuing.Next Rept Will Be Provided by 841130 ML20091R5751984-06-0808 June 1984 Interim Deficiency Rept Re Electrical Raceway Sys Nonconformances.Initially Reported on 830829.Util Evaluating Results from Const Completion Program & Reviewing Bechtel Followup to Mcar 70.Next Rept by 841130 ML20091Q9511984-06-0101 June 1984 Interim Deficiency Rept Re Use of Shear Lugs in Embedment Design.Bechtel Investigations Indicated Use of Shear Lugs Outside Compression Zone Effective Design Technique & That No Safety Concerns Exist.Next Rept Expected by 840928 ML20091L7811984-06-0101 June 1984 Interim Deficiency Rept Re Small Break/Reactor Coolant Pump Operation Interaction During Primary Sys High Void Fraction Conditions.Investigation Incomplete.Next Rept Will Be Submitted by 840831 ML20091L5761984-06-0101 June 1984 Interim Deficiency Rept Re B&W Steam Generator Auxiliary Feedwater Header Design Change.Initially Reported on 820526. No Schedule Established for Design Change & Mod of Hardware. Next Rept Will Be Issued on or Before 841130 1992-12-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20058L8721992-12-31031 December 1992 1992 Annual Rept,Cpc ML20126D7211992-12-16016 December 1992 Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed ML20246N1221988-12-31031 December 1988 CMS Energy 1988 Annual Rept ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20196J3801987-12-31031 December 1987 CMS Energy Corp 1987 Annual Rept ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20207R9041986-12-31031 December 1986 CPC 1986 Annual Rept ML20214A0951986-11-14014 November 1986 Insp & Evaluation Re Adequacy of Stabilization Plan,In Response to Util 860701 Request for Withdrawal of Applications to Extend CP & Util Motions Seeking Withdrawal of OL Application ML20215G6801986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20215G5351986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20197H2581986-05-0808 May 1986 Part 21 Rept 135 Re Defect W/Lube Oil Sump Tank Foot Valve of Standby Diesel Generator.Caused by Extrusion of Liner Matl Due to Overpressurization.Corrective Actions Being Developed.List of Affected Sites Modified ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications ML20205N6811986-04-14014 April 1986 Final Part 21 & Deficiency Rept 86-03 Re Consolidated Pipe & Valve Supply,Inc Certified Matl Test Repts.Initially Reported on 860321.Six raised-face Orifice Flanges Statused & Segregated Per QA Procedures ML20205N7381986-04-14014 April 1986 Interim Deficiency & Part 21 Rept 86-02 1 Re Elastomer Liner in Clear Flow Co Foot Valves Used in Lube Oil Sump Tanks of Tdi Diesel Generators.Initially Reported on 860321. Action Will Not Be Pursued Unless Facility Reactivated ML20140H5991986-03-24024 March 1986 Second Interim Deficiency Rept 86-01 Re Error in Bechtel Computer Analysis Program.Initially Reported on 860121.No Corrective Actions Will Be Pursued & No Further Repts Will Be Submitted Unless Project Reactivated ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153F5391986-02-14014 February 1986 Interim Part 21 & Deficiency Rept Re Error in Bechtel Computer Analysis Program ME101.Initially Reported on 860121.No Corrective Actions or Further Repts Will Be Submitted Until Project Reactivated ML20137N6101986-01-10010 January 1986 Interim Part 21 & Deficiency Rept 85-08 Re Isolated Failures of Betts Spring Co Intake & Exhaust Valve Springs Reported by Tdi.Initially Reported on 851218.Corrective Actions Will Be Pursued If Units Reactivated ML20141N8361985-12-31031 December 1985 CPC 1985 Annual Rept ML20138M3891985-12-12012 December 1985 Topical Rept Evaluation of Rev 1 to BAW-1847, Leak Before Break Evaluation of Margins Against Full Break for Rcs.... Rept Presents Acceptable Justification to Eliminate Dynamic Effects of Large Ruptures in Piping ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20138B9531985-10-0909 October 1985 Interim Deficiency Rept Re Larger than Anticipated Util Movement Where Freezewall Crossed safety-related Utils at Monitoring Pits 1,2,3 & 4.Initially Reported on 850917.No Action Will Be Taken ML20138C3111985-10-0808 October 1985 Interim Deficiency Rept Re Limitorque motor-operated Butterfly Valves Not Opening Electrically After Closed Manually.Initially Reported on 850912.No Corrective Actions Will Be Taken Unless Facility Reactivated ML20138C3251985-10-0808 October 1985 Interim Deficiency Rept Re Loose Set Screws on Anchor Darling Swing Check Valves & Disc Nut Pin Problems Causing Inoperability.Initially Reported on 850912.No Further Corrective Action Will Be Taken Unless Facility Reactivated ML20132B0261985-09-0303 September 1985 Part 21 Rept Re Possibility of Engine Ingestion of Unwelded Part in American Air Filter Standby Diesel Generator Intake Silencer.Immediate Hold Should Be Placed on Diesel Engines/Intake Silencers Not Yet in Svc ML20132D3191985-07-10010 July 1985 Interim Part 21 & Deficiency Rept Re Rupture During Testing by Wj Woolley Co of Inflatable Seal,Mfg by Presray Corp,Used in Personnel Air Locks in Reactor Containment Sys.Initially Reported on 850614 ML20129G0601985-04-26026 April 1985 Interim Deficiency Rept Re Potential for Cracking of Check Valves in on-engine Mounted Starting Air Piping of Tdi Diesel Generators.Initially Reported on 850401.Cause Not Determined.No Corrective Actions.Related Correspondence ML20112J3951985-03-22022 March 1985 Interim Part 21 & Deficiency Rept Re Failure of Gulf & Western MSIV Actuator Latch Roller Bearing.Matter Will Not Be Pursued Unless Plants Reactivated ML20100B6361985-01-21021 January 1985 Rept on Welding Allegations ML20114D3571984-12-21021 December 1984 Interim Deficiency Rept Re Diesel Fuel Oil Tank Soils Borings.Initially Reported on 841121.No Corrective Actions Necessary Due to Present Project Shutdown ML20100K9791984-11-27027 November 1984 Part 21 & Interim Deficiency Rept Re Ruskin Mfg Co Interlocking Blade Fire Dampers.Initially Reported on 841121.Corrective Action Will Not Be Pursued & No Further Repts Will Be Made Unless Plant Reactivated ML20100D9841984-11-21021 November 1984 Deficiency Rept Re Diesel Fuel Oil Tank Boring Logs.Util Response to Dow Chemical Co 841113 Request for Admissions Encl ML20100E4451984-11-15015 November 1984 Interim Deficiency Rept Re Cardinal Industrial Products Corp Spare Studs Received W/O Ultrasonic Exam.Initially Reported on 841010.Corrective Actions Will Not Be Pursued Unless Midland Reactivated ML20100E2621984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Rosemount 1153 Series B Transmitters Potentially Leaking.Initially Reported on 841010.Four Units Shipped to Facilities.Corrective Actions Will Not Be Pursued ML20100E2371984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Tdi Fuel Control Level Cap Screws.Initially Reported on 841010.No Corrective Actions Will Be Pursued & No Further Repts on Subj Made Unless Midland Reactivated ML20099E3531984-11-0909 November 1984 Interim Deficiency Rept Re Small Bore Piping Anchor Design. Initially Reported on 840816.Listed Corrective Actions Will Not Be Pursued & No Further Repts Will Be Made Unless Facilities Reactivated ML20093C3211984-10-0101 October 1984 Rev 0 to QA Program Plan for Shutdown Phase ML20093H3961984-08-0202 August 1984 Interim Deficiency Rept Re Seismic Qualification of Power Supplies for Eccas & Ni/Rps Equipment.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20093H8521984-08-0202 August 1984 Interim Deficiency Rept Re Field Installation of Itt Grinnell Struts & Extension Pieces.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20096A7781984-07-27027 July 1984 Final Deficiency Rept Re Defective Capstan Springs in Pacific Scientific Mechanical Shock Arrestors.Initially Reported on 840106.W/o Description of Investigation & Corrective Actions.Related Correspondence ML20093H8111984-07-27027 July 1984 Final Part 21 & Deficiency Rept Re Capstan Springs in Mechanical Shock Arrestors Supplied by Pacific Scientific. All Suspect Shock Arrestor Capstan Springs Will Be Inspected for Cracks & Defective Springs Replaced ML20093H8871984-07-20020 July 1984 Interim Deficiency Rept Re Reactor Coolant Pump Seals & Seal Covers.Initially Reported on 840622.No Activity Currently Being Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20090G2141984-07-18018 July 1984 Idcvp:Control Room HVAC Sys Performance Requirements, Draft Topical Rept ML20093H4751984-07-17017 July 1984 Interim Deficiency Rept Re Core Flood Line Piping Supports in Reactor Pressure Vessel Connection Supplied by Bechtel. Overstressing Could Occur in Pipe Supports.No Commitment Made for Further Repts ML20096A2951984-07-11011 July 1984 Final Deficiency Rept Re Concrete Embedment Design Using Shear Lugs Located Outside Compression Zone.Initially Reported on 821203.Use of Shear Lugs Outside Compression Zone Is Proper Design Technique.Related Correspondence ML20093G7891984-07-11011 July 1984 Final Deficiency Rept Re Concrete Embedment Design Using Shear Lugs Located Outside Compression Zone.No Corrective Action Required.Not Reportable Under 10CFR50.55(e) 1992-12-31
[Table view] |
Text
.
g e Consumers I
u
- \ A l Power U
James W Cook Vice President - Projects, Engineering and Construction Generea offices: 1945 West Perne!! Road, Jackson. MI 49201 * (517) 78& O453 May 29, 1981 81-02 #3 N
& Cb Mr J G Keppler, Regional Director pp Office of Inspection and Enforcement 8 li .]
) IDS J US Nuclear Regulatory Commission I= '
L Region III 97 JUN 0 <f19OI 5 IO 799 Roosevelt Road -
Glen Ellyn, IL 60137 Mygroa /C E 4'//
MIDLAND PROJECT -
DOCKER NOS 50-329, 50-330 4 ~g ('
AUXILIARY BUILDING SEISMIC ANALYSIS FILE: 0.h.9.48 UFI: 73*10*01, 70*0l*11*03, 45*05*20 SERIAL: 12008 Ruference: CPCo letters to J G Keppler, Same
Subject:
- 1) Serial No 11200, dated February 20, 1981
- 2) Serial No 11972, dated April 16, 1981 This letter, as were the referenced letters, is an interim 50.55(e) report
, concerning the auxiliary building seismic analysis. Attachment 1 provides j a status of the planned corrective actions.
i Another report, C.ther interim or final, will be sent on or before July 31, 1981.
WRB/lr Attachment 1: MCAR-47, Interim Report No 3, dated May 15, 1981
" Auxiliary Building Seismic Analysis" CC: Director of Office of Inspection & Enforcement Att Mr Victor Stello, USNRC (15)
Director, Office of Management Information & Program Control, USNRC (1)
RJCook, USNRC Resident Inspector Midland Nuclear Plant (1) l 81060502 24
2 Serial 12008 81-02 13 CC: CBechhoefer, ASLB Panel RSDecker, ASLB Panel
. FPCowan, ASLB Panel-
'AS&L Appeal Panel IC4Cherryi Esq MSinclair CRStephens, USNRC
-WDPaton, Esq, USNRC FJKelly, Esq, Attorney General SHFreeman, Esq, Asst Attorney General GTTaylor, Esq, Asst Attorne'y General WHMarshall , .
GJMerritt, Esq, TNK&J ,
i-4 e
l
, o
.= .
2 -
Serial 12008 81-02 #3-CC: C3echhoefer, ASL3 Panel RSDecker, ASLB Panel
~FPCowan, ASLB Panel AS&L Appeal Panel 4, HMCherry, Esq , , ,
MSinclair CRStephens, USNRC '[ *
'nDPaton, Orq, US:GC FJKelly, Esq. Attorney General SHFreeman, Esq, Asst Attorney General GTTaylor, Esq, Asst Attorney General WHMarshall GJMerritt, Esq, THK&J l
1 l'
W D
,s,e,e - , - ,,,~,n--- -- - - -, --- , ,,-,,,- - ---+-,.,w
.s .
Attacharnt 1 serial 12008
~
Bechtel Associates Professional Corporation 81-02 #3
SUBJECT:
MCAR 47 (Issued 1/29/81)
Auxiliary Building Seismic Analysis INTERDi REPORT ~3 DATE: May 15, 1981 PROJECT: Consumers Power Company Midland Plant Units 1 and 2.
Bechtel Job 7220 Description During a seismic reanalysis associated with the 10 CFR 50.54(f) plant fill issue, it was noted that the 1977 auxiliary building seismic model considered the control tower and the main portion of the auxiliary building as an integral unit between el 614' and 659'. This assumption may not be appropriate for the north-south direction because of the connection between the control tower and the main atructure, which con-sists primarily of reinforced concrete slabs. The auxiliary building and the control tower were structurally desianed to a 1974 seismic model which included flexibility at the connection between the control tower and main structure. Equipment and systems have been seismically qual-ified using output from both the 1974 and 1977 seismic models.
Potential Safety Implications This item does not have a safety impact on the stability of the auxi-liary building, equipment, structural steel superstructure, or the structure of the main part of the auxiliary building. Potential safety implications have not yet been determined for the control tower, its connections to the main auxiliary building, the electrical penetration areas, or the piping systems.
I Investigation The investigation presented is limited to the new definition of the north-south,1977 seismic model (FSAR Figure 3.7-10) initiated solely to determine the safety impact of the condition. Because the control tower and the main auxiliary building (el 614' to 659') were modeled as two separate structures connected by a flexible link, this investigation considers possible changes in the building forces and floor response spectra curves. The structural behavior in the east-west and vertical directions would not be affected by this change in the model.
The investigation presented herein does not include the model modifi-cation in process to resolve analysis necessary for the 10 FCR 50.54(f) plant fill issue.
w- - , ,
l Bechtel Associates Professional Corporation 1 l
MCAR 47 Interim Report 3 - 030693 May 15,.1981 Page 2 The investigation with this modei considers:
- 1) A response spectrum analysis to develop building responses
- 2) A time-history analysis to develop instructure floor response spectra at selected locations
- 3) Comparison of building responses to values calculated in 1974 and 1977, and to allevable forces if necessary I
- 4) Comparison of instructure floor response spectra to those gene-rated in 1977, at selected locations, and comparison of loads in selected piping systems and equipment systems to allowable loads if necessary.
The current status of this investigation follows.
- 1) The response spectrum analysis has been completed.
- 2) The time-history analysis and selected instructure floor response spectra have been generated. -
- 3) A comparison of the building forces at the base has been made. The total building base moment and shear have increased by 2%'and 1%,
respectively, values that are not significant with respect to overall building stability. The greatest change in building forces was confined to the structural steel superstructure, the control tower, and the electrical penetration area at el 674'-6" and above. '
The moment and shear in the control tower, the electrical penetra-tion area, and the slabs connecting the control tower to the main auxiliary building are under investigation. By inspection, the forces in the other portions of the building are acceptable.
- 4) A comparison of the instructure response spectra curves has been made and indicates that the majority of the floor spectra curves have little or no change. The greatest changes were confined to the structural steel superstructure, ' control tower, and electrical penetration areas at el.674'-6" and above. The frequencies most affected by this change were between 4 and 10 cps. The maximum increase in acceleration occurred at approximately 6 eps and was 1.6 times- the previous spectrum value. In other areas in the building, the new instructure response spectra did not differ significantly from the existing spectra. By inspection, these areas are acceptable.
Witi one exception, piping systems in the area affected were found
- to be acceptable. The. piping systems that were selected for evalua-tion were located in the area where the greatest change in seismic loads occurred and where the pipe or hanger stresses were close to i
a t'-wm-WP' yeT- yg-, +-ve-y- i-W MV@b-"*""="-W=' 4-- - --H--'--*DM- tw'tmW'e='-'T-'-m'hwW"@"'-9r' W bt-"'T1+W7W-+ W -r'*-9-T=w9 W-TTPT"F4'm=*t +4""-r+'Mt=' ' - '9-Jp--7N-9Y h'-Wedv'-f'*--WtW'"*-
Bechtel Associates Professional Corporation MCAR 47 . , . - - e.
Interim Report 3 V O b, U d 0 May 15, 1981 Page:3 the maximum allowable before checking the new seismic stresses.
The auxiliary steam and turbine exhaust vent stack-to the atmos- -
phere is the only system found that will experience substantial
> increases in loadings. The three supports for the.ventLstack will need to be checked for an increase in seismic loads. The potential safety impact of the increased load on the hangers has not been determined.
Equipment systems in the area affected were found to be acceptable.
Equipment was selected to be checked based on its potential for change. The revised spectra were compared to the spectra used to l seismically qualify the equipment, and the equipment still met acceptance criteria.
Corrective Actions Completed
- 1) During the week ending January 23, 1981, the assumption that the control tower and the main portion of the auxiliary building is a nonintegral unit between el 614' and 659' was incorporated in a modified model of the auxiliary building. Accordingly, this acticn is complete.
- 2) The structural response analysis has been completed.
l
- 3) The time-history analysis and corresponding in-structure floor response spectra have been generated.
- 4) A sample of the existing equipment seismic qualification records have been reviewed and found to be adequate for the revised spec-trun.
- 5) The stability of the structure is not significantly affected; therefore, it has been found to be sat isfactory.
- 6) The structural steel superstructure has been checked and found to
, be adequate.
Corrective Actions to be Completed
- 1) Complete the investigation of the structural design in affected 1
areas of t.e structure
- 2) A sample of the existing piping syster. has been reviewed and potential safety impact on three hangers is being investigated
- 3) Establish whether this is " reportable" based on results of the investigation described above
.-_.m . . . . .,.. . . - . - _ . - . . _ _ _ _ , , . _ _ . - . _ ~ . . . _ _ . . - - _ _ _ _ . - - _ _ - . , . . . , - . . - -
1 Bechtel Associates Professional Corporation j i
MCAR 47
- Interim Report 3 030o93 l I
May 15, 1981 Page 4 Root Cause This omission, the magnituda and implications of which'are still to be determined, was not caused by a failure to follow a procedure. All procedures pertaining to the origination, checking, review, and approval of calculations had been followed.
This omission involves.a subjective technical determination of the most effective way to mathematically'model a physical feature of the structure.
The methods and values used were judged to be appropriate for the east-west direction, but detailed design review revealed that the methods and values used did not adequately represent-the structure in the north-south direction.
Because these parameters are specifically and uniquely determined for each portion of the structure, this omission is believed to be a random occurrence with no generic implications. Therefore, there is no generic or process corrective action planned. To support this point, models used in the analysis of safety-related structures wert visually inspec-ted, and no geometric situation was identified which would lead to a similar model omission in development of beam properties. Due to the
- soils problem and foundation modifications, the other models are being revieweu and will be modified if necessary.
' Other Activities Not Within the Scope of this MCAR lhe scope of this MCAR, which was discussed in the preceding sections, was to define the root cause and conduct an investigation to determine
, the reportability of this situation. The following items are general descriptions of activities that have been previously identified in the
- Responses to NRC Requests Regarding Plan *. Fill. These items !.nvolve an
- extensive reanalysis which includes changes which will correct the omission identified in this MCAR. These activities will continue to be tracked by that previous effort, and are separate from the MCAR.
- 1) Continue seismic reanalysis of the auxiliary building considering I the current building configuration (e.g., tornado shield), present soil conditions, and proposed plant fill remedial action (e.g.,
caissons under electrical penetration areas). This analysis will i
incorporate the modified model described in Corrective Action 3
~
above.
- 2) From Item 1 above, develop revised seismic forces, moments, and response spectra.
,_ _ .-_.-_,_..-.-.__--~...,_._,,,_~_-,m. - . _ - , . . _ _ . , . _ _ _ . _ . _ _ . _ _ _ . . -. - . - - _ . _ _ _ _
c ,
Bechtel Associates Professional Corporation MCAR 47 Interim Report 3 030690 May 15, 1981 Page 5
- 3) Review existing structural designs, piping systems, mechanical systems, control systems, and equipment qualifications for adequacy to revised items listed in Item 2 above. If this action discloses discrepancies, corrective action measures will be implemented.
- 4) The affected FSAR Figure 3.10-7 has been identified as subject to change at a later date in the Responses to NRC Requests Regarding Plant Fill.
Reportability This subject was reported by Consumers Power Company to the NRC at : po-ti-~'slly reportable 10 CFR 50.55(e) item on January 21, 1981. 7o date, i . . not been established whether this item is " reportable" vr. der the et, .ria of 10 CFR 50.55(e). Reportability will be addressed in subse-quent reports based on the results contained in the section entitled
" Investigation", above.
Prepared by: h D.T. Scrt h r b
Approved by: h < - - _-
N. Swanberg Concurrence by: /-
K!D. 1 ley
. . - -- - . --