ML20009F427: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 69: | Line 69: | ||
How many failures? '/ | How many failures? '/ | ||
: : Ka weie c,x-Give nature of failure. At*La d f- | : : Ka weie c,x-Give nature of failure. At*La d f- | ||
':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g, . . | ':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g, . . | ||
'NS Give brief reasons for the answer. Av.<ww/%).b n - cc < :+-c r, se | 'NS Give brief reasons for the answer. Av.<ww/%).b n - cc < :+-c r, se | ||
Revision as of 11:20, 17 February 2020
| ML20009F427 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/14/1978 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20009F426 | List: |
| References | |
| 78-26, NUDOCS 8107310135 | |
| Download: ML20009F427 (3) | |
Text
- i sosroN co:5CN CCMPANY GENanA4. orrtcts 800 SSTLaToes STmECT S G STO N. MASSacHu9CTTS oaI99
- 3. CAmb ANCOGN4NS g'
.0ANAGER qucLEam omCmAttcNS CEPamTMENT .
. e'
~
- ~ -
Zn, . February 14, 1978 Q'1 .
l -- . i. -
BEco. Ler. #78-26 l
.C Ud
~ 7 Director of Nuclear Reactor Regulation .i -
- i U.S. Nuclear Regul'atory Com:21ssion d l Washington, D. C. 20555 Docket No. 50-293 l License No. DPR-35 l
l Reliability Study of Standby Diesel Generators
Dear Sir:
In letters dated December 15, 1977 and January 3,1978, power reactor licensees i were requested to complete a questionnaire on standby diesel generators. The l attached questionnaire for the Pilgrim Nuclear Powe,I Station diesels has been ,
ec=pleted and is hereby submitted.
, 3osnn Edison Conpany regrets the delay in transmitting the survey results,
! however, due to some c: mission we were not aware of the request for such in-l for=ation until receipt of your January 3, 1978 letter. At that time appropriate
! steps were taken to obtain a copy of the questionnaire and begin ec= piling the responses.
We trust that this infor=ation will contribute to the reliability study. If additional infor=ation is required concerning this subj ect please contact the
[ individual identified on the cover sheet of the question = aire.
l l
. Very truly yours, l
/ <
l :l; ['gh'u b ret u-
.Yj' ,-
7?C550015 l h IO, Attachments I D
. \ \
8107:.s10135 810720 PDR ADOCK 05000293 p PDR -
I s
20- .
S. Are any foreign cases sucn as pro;rane, freen, halon, carbon dioxide, etc. storec in the: Diesel Engine roem? f!o Yes flo .# or adjacent buildings? Yes w . . .. . If yes, (other than hand portacle fire extinguishers), then
,' identify gases and give approximate tar.k size.
.'. 3 Volume (f t )
Gases T. Does control systect autenatically bypa:s, in cmergency
. .: starting, any engine tem;orarily out of service for maintenance? Yes __ fic _p <'
If yes, then how many f ailures to bypass have occured?
. .: :. .: - ~
.._7,.,
Does the control system aut:matically overritie the test raode under emergency conditiens? Yes j."'
~
U. !!o V.
Have repetitive mechanical f ailures occurred in any com:onent part.
or subsystem of the engine, generator, or switen gear, eti.?
Yes n #!!o 10 r/c3 _,
if yes, then which part or sJbsys tem? 5'ri.A . - ,WA "T.:
How many failures? '/
- : Ka weie c,x-Give nature of failure. At*La d f-
':ould periccic (yearly or other) ovaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability? Yes g lio g, . .
'NS Give brief reasons for the answer. Av.<ww/%).b n - cc < :+-c r, se
.~..
Pe:Je .w.sti is 6Asin . c e":,%c
~
..y _.
I 1
.. j 21 X. 1. Give the accunulated tir.e-load ccera-ing recore f:r each diesel-generator unit from insta,1.lati:n to the cresent (Running Mcurs): -
. .-- h, r Preoperational test Date m /7c.
- Engine : Surv. Testing & : inargency : Total :
- Serial No. : liaintenance Hrs. : and Other : Hcurs :
- - : : No load : Loaded : Service Hrs. : :
- --!~
N. ~
Surveillance test load (percent of cortinucus rating)
/ ; 'c-2.
- 3. Give the projected or clannec tice-1cid coeratica for .
eaca diesel-generator unit during tne text 12 cenths.'
- : Surveillance & : Ecergency : '. ctal : :
?.cu rs : :
- flaintenance Hrs. : and other :
- : Service Mrs. : :
- cac m:: A_x .
.[,, : : c< , e. t - : 52.'.N L-S :
- .m c < e c o :
e' re' W. : :
- 4. Provide the follcuing succary of the iriccic surveillance testing experience: ,
Starting date of surveillance testing (OL date) 'D
. 'J 77-a.
, b. Periccic test interval / '55% v i c. Total number of surveillance tes 3 :erformed
- d. Total nuceer of test f ailures m L; .
f aii re to accept load
": failure to start
'~
i failure to carry icad f ail .res due to c:erator errc:
_" f ailure due to ecuir, rent not bein; perative curing cecrgency condi tions
- e. Supply a copy of tna surveillarce test peccecures with this -
concleted questionnaire.
- e. .
e- - - ,
g --m, , ,
.,._-g .-- - , , -