ML17319A799: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 27: | Line 27: | ||
eel TOTAl NUMBER OF COPIES REQUIRED: LTTR ~if ENCL | eel TOTAl NUMBER OF COPIES REQUIRED: LTTR ~if ENCL | ||
J Jl r ~I &I li | J Jl r ~I &I li r r 4 -I li rr lr r | ||
r r 4 -I li rr lr r | |||
II | II | ||
Revision as of 01:55, 4 February 2020
| ML17319A799 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/31/1981 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8104070270 | |
| Download: ML17319A799 (4) | |
Text
g REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)
NBR! 81040702'70., DOC ~ DATE'! 81/03/31'OTARIZED! NO DOCKET: 0 FACILe50.. 316" Donald-. C' Cook Nuclear Power Plantr. Unit 2q 1ndiane S 05000316 AUTH ~ NAME>> AUTHOR AFF ILIIATION SHALLERiD,V~" Indiana S Michigan Electr ic Co, REC IP ~ NAlhEl REC IP IENT AFF IL'IA'TION KEPPLER~J,G, Region 3r Chicago< Office" of the'irector
SUBJECT:
. RO!on 810331',low leVel alarm contacts op= spray additive'ank~
discovered wired,backwards precluding ).ow level.alerp from 05000316'CCESSION annunciating.Fo'llowup rept to be, submitted by 810413, DISTRISUTIDN CODE;; ROOTS l.ER (Backf it)
COPIES RECEIVED:LTR 'NCl.' SIZE:: I ' '"'ITLK4
.If NOTES I Send 3. copi es" of el l material to IS E~,
RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME) l.TTR ENCL ID CODE/NAMEI LTTR ENCL" INTERNALS AEOD 2: ASLBP/ J"'0 HARD- 1 ISED 04 2' MPA 1 ftC-- 02'1 OP EX EVAL BR 1 G FIL EXTERNALS. LPDR 03. NSIC gp~
eel TOTAl NUMBER OF COPIES REQUIRED: LTTR ~if ENCL
J Jl r ~I &I li r r 4 -I li rr lr r
II
e'o merlcen leotHa
~ yet~ INDIANA & MICHIGAN EI EC TRIC COMPA N Y DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 March 31, 1981 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm our verbal report to Mr. E. Swanson, NRC Region III Inspector, at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on March 31, 1981. At that time we reported that during an eighteen month surveillance on the Unit II2 Spray Addi-tive Tank it was discovered that the low level alarm contacts were wired backwards precluding the low level alarm from annunciating.
A followup report will be submitted by April 13, 1981, as required by Technical Specification Section 6. 9. 1.8.
Sincerely, D.V. Shaller Plant Manager
/bab cc: J.E. Dolan R.S. Hunter R.W. Jurgensen phoo)
R.F. Kroeger 5 R.W. Kilburn E. Swanson/N. DuBry RO:III ,/o R.C. Callen MPSC J.M. Hennigan W. Lavallee EPRI PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)
Dir., MIPC (4 copies)
4 ll ll t1
'I
'h ll
./