ENS 54382: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:
| NRC officer = Thomas Kendzia
| NRC officer = Thomas Kendzia
| event date = 11/12/2019 06:00 CST
| event date = 11/12/2019 06:00 CST
| last update date = 11/14/2019
| last update date = 01/31/2020
| title = En Revision Imported Date  11/15/2019
| title = Emergency Operations Facility Out of Service
| event text = EN Revision Text: EMERGENCY OPERATIONS FACILITY OUT OF SERVICE
| event text = On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project.  The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar).  The duration of the upgrade project is approximately 75 days.
On November 12, 2019, the Central Emergency Control Center (CECC) was removed from service for a planned facility upgrade project.  The CECC is a common Emergency Operations Facility (EOF) for the TVA Nuclear sites (Browns Ferry / Sequoyah / Watts Bar).  The duration of the upgrade project is approximately 75 days.
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used.  During this period, the alternate CECC will be staffed and activated using existing emergency procedures.
If an emergency is declared requiring CECC activation during this period, an alternate CECC will be used.  During this period, the alternate CECC will be staffed and activated using existing emergency procedures.
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability.  This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours.
This is an eight-hour, non-emergency notification for a Loss of Emergency Assessment Capability.  This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the CECC will be unavailable for more than 72 hours.
Line 27: Line 26:
The NRC Resident Inspector has been notified.   
The NRC Resident Inspector has been notified.   
Notified the R2DO(Musser).
Notified the R2DO(Musser).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20191115en.html#en54382
* * * UPDATE FROM ALAN PRUCHA TO KERBY SCALES AT 1526 EST ON 1/31/2020 * * *
The CECC facility upgrade project is sufficiently complete such that the CECC was returned to a functional status at 1350 CST on January 31, 2020.
The NRC Resident Inspector has been notified.
Notified R2DO (Baptist).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200203en.html#en54382
}}{{unit info
}}{{unit info
| Unit =  1  
| Unit =  1  

Revision as of 09:01, 3 February 2020

ENS 54382 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />)
Opened: Angel Yarbrough
10:32 Nov 12, 2019
NRC Officer: Thomas Kendzia
Last Updated: Jan 31, 2020
54382 - NRC Website