ML19208D392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19208D395
| number = ML19208D395
| issue date = 09/19/1979
| issue date = 09/19/1979
| title = Forwards LER 79-095/03L-0
| title = LER 79-095/03L-0:on 790912,hydrogen Gas Concentration Increased Greater than Tech Spec Limit of 4% for 18 Minutes. Caused by Moisture Entering Recombiner
| author name = Baxley S
| author name = Baxley S
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 08:09, 24 January 2020

Forwards LER 79-095/03L-0
Date released: 08/10/2019 Download: ML19208D392


LER 79-095/03L-0:on 790912,hydrogen Gas Concentration Increased Greater than Tech Spec Limit of 4% for 18 Minutes. Caused by Moisture Entering Recombiner
ML19208D395
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/19/1979
From: Baxley S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208D395 (1)
Forwards LER 79-095/03L-0
ML19208D391
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/19/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208D391 (1)