ML19209B232: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19209B234 | | number = ML19209B234 | ||
| issue date = 10/03/1979 | | issue date = 10/03/1979 | ||
| title = | | title = LER 79-026/01T-0:on 790919,during Power Reduction Below 90% Power,Axial Flux Difference Left Target Band While Power Was Still Above 90% Power.Caused by Operator Error.Power Reduced to Below 90% & Event Discussed W/Personnel | ||
| author name = Hunstad A | | author name = Hunstad A | ||
| author affiliation = NORTHERN STATES POWER CO. | | author affiliation = NORTHERN STATES POWER CO. |
Latest revision as of 07:43, 24 January 2020
Date released: 08/11/2019 | Download: ML19209B232 |
---|---|
ML19209B234 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 10/03/1979 |
From: | Hunstad A NORTHERN STATES POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19209B234 (1) | |
ML19209B231 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 10/03/1979 |
From: | Mayer L NORTHERN STATES POWER CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19209B231 (1) | |