ML19209C678: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19209C683
| number = ML19209C683
| issue date = 10/10/1979
| issue date = 10/10/1979
| title = Forwards LER 79-036/03L-0
| title = LER 79-036/03L-0:on 790910,during Surveillance Testing, Loophandling Sys Infection Pump 1A Did Not Develop Required Recirculation Flow.Caused by Introduction of Fire Hose Nozzle Into Pump Line.Piping Will Be Inspected
| author name = Werling J
| author name = Werling J
| author affiliation = DUQUESNE LIGHT CO.
| author affiliation = DUQUESNE LIGHT CO.

Latest revision as of 07:12, 24 January 2020

Forwards LER 79-036/03L-0
Date released: 08/11/2019 Download: ML19209C678


LER 79-036/03L-0:on 790910,during Surveillance Testing, Loophandling Sys Infection Pump 1A Did Not Develop Required Recirculation Flow.Caused by Introduction of Fire Hose Nozzle Into Pump Line.Piping Will Be Inspected
ML19209C683
Person / Time
Site: Beaver Valley
Issue date: 10/10/1979
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19209C683 (1)
Forwards LER 79-036/03L-0
ML19209C677
Person / Time
Site: Beaver Valley
Issue date: 10/10/1979
From: Werling J
DUQUESNE LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19209C677 (2)