ML19211C714: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19211C716
| number = ML19211C716
| issue date = 12/04/1979
| issue date = 12/04/1979
| title = Responds to NRC 790817 Ltr Re Interim Actions Required for Plant Operation Pending Final Resolution of Atws.Emergency Forwards Revision 4 to Emergency Procedure EP-1 Re Reactor Trip
| title = to Emergency Procedure EP-1, Reactor Trip.
| author name =  
| author name =  
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)

Latest revision as of 02:18, 24 January 2020

Responds to NRC 790817 Ltr Re Interim Actions Required for Plant Operation Pending Final Resolution of Atws.Emergency Forwards Revision 4 to Emergency Procedure EP-1 Re Reactor Trip
Date released: 08/13/2019 Download: ML19211C714


to Emergency Procedure EP-1, Reactor Trip.
ML19211C716
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/04/1979
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML19211C716 (6)
Responds to NRC 790817 Ltr Re Interim Actions Required for Plant Operation Pending Final Resolution of Atws.Emergency Forwards Revision 4 to Emergency Procedure EP-1 Re Reactor Trip
ML19211C713
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/10/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, VARGA S A
Office of Nuclear Reactor Regulation
References
Download: ML19211C713 (1)