ML19253B008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19253B009
| number = ML19253B009
| issue date = 09/05/1979
| issue date = 09/05/1979
| title = Forwards LER 79-069/03L-0
| title = LER-069/03L-0:on 790822,during Spray/Sprinkler Valve Checks, Only One Fire Pump Was Operable.Caused by Inadequate Procedures.Procedures Revised
| author name = Nix R
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 19:59, 23 January 2020

Forwards LER 79-069/03L-0
Date released: 09/24/2019 Download: ML19253B008


LER-069/03L-0:on 790822,during Spray/Sprinkler Valve Checks, Only One Fire Pump Was Operable.Caused by Inadequate Procedures.Procedures Revised
ML19253B009
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/05/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253B009 (1)
Forwards LER 79-069/03L-0
ML19253B007
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/05/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253B007 (1)