ML19260C372: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19260C375 | | number = ML19260C375 | ||
| issue date = 12/18/1979 | | issue date = 12/18/1979 | ||
| title = | | title = LER 79-112/03L-0:on 791119,valve MS106 Failed to Open During Surveillance Testing.Caused by Improper Installation of Worm Gear Spacer.Drive Sleeve Machined & Worm Gear Spacer Reinstalled | ||
| author name = Oneill J | | author name = Oneill J | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. |
Latest revision as of 14:13, 23 January 2020
Date released: 10/01/2019 | Download: ML19260C372 |
---|---|
ML19260C375 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/18/1979 |
From: | Oneill J TOLEDO EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19260C375 (2) | |
ML19260C371 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/18/1979 |
From: | Murray T TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19260C371 (1) | |