ML19270E895: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19270E897 | | number = ML19270E897 | ||
| issue date = 12/27/1978 | | issue date = 12/27/1978 | ||
| title = | | title = LER 78-054/01T-0 on 781213:during Routine Trip Recovery, Reactor Was Made Critical,But Shift Supervisor Recalled That No 11 Component Cooling Heat Exchanger Was Out of Svc & the Saltwater Subsys Partly Drained,So Reactor Was Shut Down | ||
| author name = Carroll J | | author name = Carroll J | ||
| author affiliation = BALTIMORE GAS & ELECTRIC CO. | | author affiliation = BALTIMORE GAS & ELECTRIC CO. |
Latest revision as of 09:31, 23 January 2020
Date released: 10/11/2019 | Download: ML19270E895 |
---|---|
ML19270E897 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs ![]() |
Issue date: | 12/27/1978 |
From: | Carroll J BALTIMORE GAS & ELECTRIC CO. |
To: | |
References | |
Download: ML19270E897 (2) | |
ML19270E894 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs ![]() |
Issue date: | 12/27/1978 |
From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19270E894 (1) | |