ML19270F561: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19270F562 | | number = ML19270F562 | ||
| issue date = 02/09/1979 | | issue date = 02/09/1979 | ||
| title = | | title = LER 79-011/03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired | ||
| author name = Greene T | | author name = Greene T | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 09:14, 23 January 2020
Date released: 10/11/2019 | Download: ML19270F561 |
---|---|
ML19270F562 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 02/09/1979 |
From: | Thomas Greene GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19270F562 (1) | |
ML19270F560 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 02/04/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19270F560 (1) | |