ML19289F240: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19289F241
| number = ML19289F241
| issue date = 05/25/1979
| issue date = 05/25/1979
| title = Forwards Nonroutine Environ Operating Rept Providing 10-day Written Notification of 790515 Occurence
| title = Nonroutine Environ Operating Rept Discussing 790330-0514 Drainage of 1,860 Gallons Contaminated Water Onto Unit 2 Floor Drain Sys.Caused by Inadequate Design Change Control. Drains Were Plugged
| author name =  
| author name =  
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 04:46, 23 January 2020

Forwards Nonroutine Environ Operating Rept Providing 10-day Written Notification of 790515 Occurence
Date released: 10/30/2019 Download: ML19289F240


Nonroutine Environ Operating Rept Discussing 790330-0514 Drainage of 1,860 Gallons Contaminated Water Onto Unit 2 Floor Drain Sys.Caused by Inadequate Design Change Control. Drains Were Plugged
ML19289F241
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/25/1979
From:
ALABAMA POWER CO.
To:
References
Download: ML19289F241 (3)
Forwards Nonroutine Environ Operating Rept Providing 10-day Written Notification of 790515 Occurence
ML19289F239
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/25/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19289F239 (1)