ML19290B911: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19290B914
| number = ML19290B914
| issue date = 12/07/1979
| issue date = 12/07/1979
| title = Forwards LER 79-094/03L-0
| title = LER 79-094/03L-0:on 791121,while Reactor in Run Mode, Discovered B Pump Running W/O Discharge Pressure or Flow on Local Gauges.Caused by Breaking of Pump Line Bottom Shaft. Shaft & Suction Bell Replaced
| author name = Nix R
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 04:17, 23 January 2020

Forwards LER 79-094/03L-0
Date released: 10/31/2019 Download: ML19290B911


LER 79-094/03L-0:on 791121,while Reactor in Run Mode, Discovered B Pump Running W/O Discharge Pressure or Flow on Local Gauges.Caused by Breaking of Pump Line Bottom Shaft. Shaft & Suction Bell Replaced
ML19290B914
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/07/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290B914 (3)
Forwards LER 79-094/03L-0
ML19290B910
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/07/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290B910 (1)