ML19350E041: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19350E049
| number = ML19350E049
| issue date = 06/09/1981
| issue date = 06/09/1981
| title = Forwards LER 81-030/03L-0
| title = LER 81-030/03L-0:on 810512,axial Power Imbalance Limit Exceeded.Caused by Procedural Inadequacy.Procedures ST 5042.02 & EP 1205.16 Have Been Modified
| author name = Brown D
| author name = Brown D
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 17:42, 16 January 2020

Forwards LER 81-030/03L-0
Date released: 12/30/2019 Download: ML19350E041


LER 81-030/03L-0:on 810512,axial Power Imbalance Limit Exceeded.Caused by Procedural Inadequacy.Procedures ST 5042.02 & EP 1205.16 Have Been Modified
ML19350E049
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/09/1981
From: David Brown
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19350E049 (3)
Forwards LER 81-030/03L-0
ML19350E040
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/09/1981
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19350E040 (1)