On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.
On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007.
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007.
Contact:                             Org:      Phone No:          Email:
 
==Contact:==
Org:      Phone No:          Email:
POWELL, RAYMOND J                    R1        (610) 337-6967    RJP@nrc.gov}}
POWELL, RAYMOND J                    R1        (610) 337-6967    RJP@nrc.gov}}

Latest revision as of 14:25, 7 December 2019

Morning Report 1-2007-0008 - Pilgrim Manual Reactor Shutdown
ML070780524
Person / Time
Site: Pilgrim
Issue date: 03/17/2007
From: Racquel Powell
NRC Region 1
To:
Powell R, RI/DRP/610-337-6967
References
MR-1-2007-0008
Download: ML070780524 (1)


Text

PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I Morning Report Date: MAR 19, 2007 Licensee/Facility: Notification:

ENTERGY NUCLEAR GENERATION COMPANY MR Number: 1-2007-0008 Pilgrim Date: 03/17/2007 Plymouth, Massachusetts Call from Licensee Dockets: 050-00293

[1] GE-3

Subject:

Pilgrim Manual Reactor Shutdown.

Discussion:

On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.

Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately 6:00 a.m. on March 19, 2007.