{{#Wiki_filter:September 27, 2001Mr. Alex Marion, DirectorEngineering Department Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, D.C. 20006-3708
{{#Wiki_filter:September 27, 2001 Mr. Alex Marion, Director Engineering Department Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, D.C. 20006-3708


==SUBJECT:==
==SUBJECT:==
ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805"PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" 2001 EDITION
ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS 2001 EDITION


==Dear Mr. Marion:==
==Dear Mr. Marion:==


In your letter to Gary Holahan, dated September 13, 2001, you asked that the NRC provide byOctober 15, 2001, any additional regulatory information on format, content, or process for developing the implementing guidance document. At this time, the NRC has no additional regulatory information to provide beyond that included in my July 31, 2001, letter to you.
In your letter to Gary Holahan, dated September 13, 2001, you asked that the NRC provide by October 15, 2001, any additional regulatory information on format, content, or process for developing the implementing guidance document. At this time, the NRC has no additional regulatory information to provide beyond that included in my July 31, 2001, letter to you.
Additionally, we find that the proposed meetings included in the schedule for development of the NFPA 805 implementing guidance enclosed with your letter dated August 28, 2001, are appropriate. We plan to schedule a meeting with the Advisory Committee on Reactor Safeguards when a final draft of the guidance is available. From the schedule NEI provided, a final draft should be available December 2002. I and my staff look forward to working with NEI on the development of the guidance document. Please contact Mr. Eric Weiss of my staff at 301-415-3264 concerning questions regarding this response.Sincerely,/RA/John N. Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor RegulationProject No. 689 September 27, 2001Mr. Alex Marion, DirectorEngineering Department Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, D.C. 20006-3708
Additionally, we find that the proposed meetings included in the schedule for development of the NFPA 805 implementing guidance enclosed with your letter dated August 28, 2001, are appropriate. We plan to schedule a meeting with the Advisory Committee on Reactor Safeguards when a final draft of the guidance is available. From the schedule NEI provided, a final draft should be available December 2002.
I and my staff look forward to working with NEI on the development of the guidance document.
Please contact Mr. Eric Weiss of my staff at 301-415-3264 concerning questions regarding this response.
Sincerely,
                                                    /RA/
John N. Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Project No. 689
 
September 27, 2001 Mr. Alex Marion, Director Engineering Department Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, D.C. 20006-3708


==SUBJECT:==
==SUBJECT:==
ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805"PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" 2001 EDITION
ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS 2001 EDITION


==Dear Mr. Marion:==
==Dear Mr. Marion:==


In your letter to Gary Holahan, dated September 13, 2001, you asked that the NRC provide byOctober 15, 2001, any additional regulatory information on format, content, or process for developing the implementing guidance document. At this time, the NRC has no additional regulatory information to provide beyond that included in my July 31, 2001, letter to you.
In your letter to Gary Holahan, dated September 13, 2001, you asked that the NRC provide by October 15, 2001, any additional regulatory information on format, content, or process for developing the implementing guidance document. At this time, the NRC has no additional regulatory information to provide beyond that included in my July 31, 2001, letter to you.
Additionally, we find that the proposed meetings included in the schedule for development of the NFPA 805 implementing guidance enclosed with your letter dated August 28, 2001, are appropriate. We plan to schedule a meeting with the Advisory Committee on Reactor Safeguards when a final draft of the guidance is available. From the schedule NEI provided, a final draft should be available December 2002.I and my staff look forward to working with NEI on the development of the guidance document. Please contact Mr. Eric Weiss of my staff at 301-415-3264 concerning questions regarding this response.Sincerely,/RA/John N. Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor RegulationProject No. 689DISTRIBUTION:ADAMSSPLB r/fEConnellEWeissJHannonGHolahanGMizunoDOudinotJBirmingham  SMorris BSheronLWhitney*See previous concurrence.DOCUMENT NAME: G:\SPLB\Section C - Weiss\Weiss\REPLY TO NEI LTR 9-13-01.WPDOFFICESPLB:DSSA:NRRDRIP:DSSA:NRROGCSC:SPLB:DSSAD:DSSA:NRRNAMEEWeiss* JBirmingham*GMizuno*JHannon*GHolahan*DATE9/20/019/20/019/25/019/26/019/27/01OFFICIAL RECORD COPY Nuclear Energy InstituteProject No. 689cc:Mr. Ralph BeedleMs. Lynnette Hendricks, DirectorSenior Vice PresidentLicensing and Chief Nuclear OfficerNuclear Energy Institute Nuclear Energy InstituteSuite 400 Suite 4001776 I Street, NW 1776 I Street, NWWashington, DC 20006-3708 Washington, DC 20006-3708Mr. Alex Marion, DirectorMr. Charles B. Brinkman, DirectorEngineeringWashington Operations Nuclear Energy InstituteABB-Combustion Engineering, Inc.
Additionally, we find that the proposed meetings included in the schedule for development of the NFPA 805 implementing guidance enclosed with your letter dated August 28, 2001, are appropriate. We plan to schedule a meeting with the Advisory Committee on Reactor Safeguards when a final draft of the guidance is available. From the schedule NEI provided, a final draft should be available December 2002.
Suite 40012300 Twinbrook Parkway, Suite 330 1776 I Street, NWRockville, Maryland 20852 Washington, DC 20006-3708Mr. H. A. Sepp, ManagerMr. Anthony Pietrangelo, DirectorRegulatory and Licensing EngineeringRisk & Performance Based Regulation Westinghouse Electric CompanyNuclear Energy Institute P.O. Box 355Suite 400 Pittsburgh, Pennsylvania 15230-03551776 I Street, NWWashington, DC 20006-3708Mr. Fred Emerson, Project ManagerEngineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708}}
I and my staff look forward to working with NEI on the development of the guidance document.
Please contact Mr. Eric Weiss of my staff at 301-415-3264 concerning questions regarding this response.
Sincerely,
                                                              /RA/
John N. Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Project No. 689 DISTRIBUTION:           ADAMS        SPLB r/f        EConnell      EWeiss        JHannon GHolahan      GMizuno        DOudinot      JBirmingham SMorris BSheron      LWhitney
                *See previous concurrence.
DOCUMENT NAME: G:\SPLB\Section C - Weiss\Weiss\REPLY TO NEI LTR 9-13-01.WPD OFFICE  SPLB:DSSA:NRR          DRIP:DSSA:NRR        OGC                SC:SPLB:DSSA        D:DSSA:NRR NAME    EWeiss*               JBirmingham*         GMizuno*           JHannon*           GHolahan*
DATE    9/20/01                9/20/01              9/25/01            9/26/01            9/27/01 OFFICIAL RECORD COPY
 
Nuclear Energy Institute                                                  Project No. 689 cc:   Mr. Ralph Beedle                        Ms. Lynnette Hendricks, Director Senior Vice President                    Licensing and Chief Nuclear Officer                Nuclear Energy Institute Nuclear Energy Institute                Suite 400 Suite 400                                1776 I Street, NW 1776 I Street, NW                        Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director                Mr. Charles B. Brinkman, Director Engineering                              Washington Operations Nuclear Energy Institute                ABB-Combustion Engineering, Inc.
Suite 400                                12300 Twinbrook Parkway, Suite 330 1776 I Street, NW                        Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. H. A. Sepp, Manager                  Mr. Anthony Pietrangelo, Director Regulatory and Licensing Engineering    Risk & Performance Based Regulation Westinghouse Electric Company            Nuclear Energy Institute P.O. Box 355                            Suite 400 Pittsburgh, Pennsylvania 15230-0355      1776 I Street, NW Washington, DC 20006-3708 Mr. Fred Emerson, Project Manager Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708}}

Revision as of 04:40, 24 November 2019

Adoption of National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants 2001 Edition
ML012750024
Person / Time
Site: Nuclear Energy Institute
Issue date: 09/27/2001
From: Hannon J
Plant Systems Branch
To: Marion A
Nuclear Energy Institute
Weiss, E.W, NRR/DSSA/SPLB, 415-3264
References
Download: ML012750024 (3)


Text

September 27, 2001 Mr. Alex Marion, Director Engineering Department Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, D.C. 20006-3708

SUBJECT:

ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS 2001 EDITION

Dear Mr. Marion:

In your letter to Gary Holahan, dated September 13, 2001, you asked that the NRC provide by October 15, 2001, any additional regulatory information on format, content, or process for developing the implementing guidance document. At this time, the NRC has no additional regulatory information to provide beyond that included in my July 31, 2001, letter to you.

Additionally, we find that the proposed meetings included in the schedule for development of the NFPA 805 implementing guidance enclosed with your letter dated August 28, 2001, are appropriate. We plan to schedule a meeting with the Advisory Committee on Reactor Safeguards when a final draft of the guidance is available. From the schedule NEI provided, a final draft should be available December 2002.

I and my staff look forward to working with NEI on the development of the guidance document.

Please contact Mr. Eric Weiss of my staff at 301-415-3264 concerning questions regarding this response.

Sincerely,

/RA/

John N. Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Project No. 689

September 27, 2001 Mr. Alex Marion, Director Engineering Department Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, D.C. 20006-3708

SUBJECT:

ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS 2001 EDITION

Dear Mr. Marion:

In your letter to Gary Holahan, dated September 13, 2001, you asked that the NRC provide by October 15, 2001, any additional regulatory information on format, content, or process for developing the implementing guidance document. At this time, the NRC has no additional regulatory information to provide beyond that included in my July 31, 2001, letter to you.

Additionally, we find that the proposed meetings included in the schedule for development of the NFPA 805 implementing guidance enclosed with your letter dated August 28, 2001, are appropriate. We plan to schedule a meeting with the Advisory Committee on Reactor Safeguards when a final draft of the guidance is available. From the schedule NEI provided, a final draft should be available December 2002.

I and my staff look forward to working with NEI on the development of the guidance document.

Please contact Mr. Eric Weiss of my staff at 301-415-3264 concerning questions regarding this response.

Sincerely,

/RA/

John N. Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Project No. 689 DISTRIBUTION: ADAMS SPLB r/f EConnell EWeiss JHannon GHolahan GMizuno DOudinot JBirmingham SMorris BSheron LWhitney

  • See previous concurrence.

DOCUMENT NAME: G:\SPLB\Section C - Weiss\Weiss\REPLY TO NEI LTR 9-13-01.WPD OFFICE SPLB:DSSA:NRR DRIP:DSSA:NRR OGC SC:SPLB:DSSA D:DSSA:NRR NAME EWeiss* JBirmingham* GMizuno* JHannon* GHolahan*

DATE 9/20/01 9/20/01 9/25/01 9/26/01 9/27/01 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 cc: Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Licensing and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy Institute Suite 400 Suite 400 1776 I Street, NW 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Engineering Washington Operations Nuclear Energy Institute ABB-Combustion Engineering, Inc.

Suite 400 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. H. A. Sepp, Manager Mr. Anthony Pietrangelo, Director Regulatory and Licensing Engineering Risk & Performance Based Regulation Westinghouse Electric Company Nuclear Energy Institute P.O. Box 355 Suite 400 Pittsburgh, Pennsylvania 15230-0355 1776 I Street, NW Washington, DC 20006-3708 Mr. Fred Emerson, Project Manager Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708