NRC Generic Letter 1982-32: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
{{#Wiki_filter:m- it-I -______iMh-ri 0 0 19 82 I TO ALL PRESSURIZED  
{{#Wiki_filter:m-               it                                                                                                   iMh
WATER REACTOR PLANT LICENSEES Gentlemen:
                          -I                           ______    -
SUBJECT: POTENTIAL  
                                                                                                                                                                  -
STEAM GENERATOR  
                                                                                                                  .U_tp ri ! r    0 0 19 82 I                     TO ALL PRESSURIZED WATER REACTOR PLANT LICENSEES
RELATED GENERIC REQUIREMENTS (GENERIC LETTER NO. 82-32)The NRC staff has identified potential steam generator related generic requirements and is currently subjecting them to a value impact analysis.A major element of the staff's value Impact will be an analysis being prepaeed by our contractor, Science Applications, Inc. A copy of this draft report is provided for your information and use. This report is currently under staff review and will be modified to consider multiple steam generator tube ruptures in combination with other events along with single tube rupture scenarios.
                      Gentlemen:
                      SUBJECT:         POTENTIAL STEAM GENERATOR RELATED GENERIC REQUIREMENTS
                                        (GENERIC LETTER NO. 82-32)
                      The NRC staff has identified potential steam generator related generic requirements and is currently subjecting them to a value impact analysis.


Any comments you may care to make, either individually or through Owners Groups, on the SAI report and on the probability and consequences of multiple tube rupture scenarios would be considered in the staff's final value impact analysis if they can be provided within 30 days of the date of this letter.Sincerely, Original signedbV Darrell G. Eisenhut Darrell G. Elsenhut, Director Division of Licensing Enclosure:
A major element of the staff's value Impact will be an analysis being prepaeed by our contractor, Science Applications, Inc. A copy of this draft report is provided for your information and use. This report is currently under staff review and will be modified to consider multiple steam generator tube ruptures in combination with other events along with single tube rupture scenarios.
SAI Report,-8208190263  
 
,)'JP 1 ~ 'I 1 OFFICE ) Th D. -.... ~^~P. n... of.I a URNAMwo ... ....... .Q ~ a.l.i .. .. ......I.... ....................  
Any comments you may care to make, either individually or through Owners Groups, on the SAI report and on the probability and consequences of multiple tube rupture scenarios would be considered in the staff's final value impact analysis if they can be provided within 30 days of the date of this letter.
...... ........................  
 
....... .....................  
Sincerely, Original signedbV
....... .....................
                                                                              Darrell G. Eisenhut Darrell G. Elsenhut, Director Division of Licensing Enclosure:                       0a                                                                                                        ,-
DATE Ip .1.2JT.I.8  
                      SAI Report
..i2X2.... ... 124182 ... ...... .... 1 --z....... ....... ....... ...........  
                      8208190263                                                                                                                                         ,)
.............  
                                                                                                                                                          'JP1 ~ '
....... ..... ...................  
                                                                                                                                                                  I     1
....... .........................
    ^~P.
NRC FORM 318 (10-80) NRCM 0240 O FFICIA L R EC O RD C OP Y USGPO. 1981-335s960}}
 
OFFICE
              a  )
                          n...
                    URNAMwo    ...
                                    Th    -D.
 
of.I
                                      ....... .Q
                                                      ....
                                                      a.l.i~. ..... I.... .................... ...... ........................ ....... ............................ .....................
                                                  ~ ....
      DATE Ip .1.2JT.I.8 ..i2X2....
                                  ...124182 ......... ....1 -- z....... ....... ....... ........... ............. ....... ..... ................... ....... .........................
NRC FORM 318 (10-80) NRCM 0240                                 O FFICIA L R EC O RD C OP Y                                                                       USGPO. 1981-335s960}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 02:07, 24 November 2019

NRC Generic Letter 1982-032: Potential Steam Generator Related Generic Requirements
ML031210726
Person / Time
Issue date: 12/09/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-82-032, NUDOCS 8208190263
Download: ML031210726 (1)


m- it iMh

-I ______ -

-

.U_tp ri ! r 0 0 19 82 I TO ALL PRESSURIZED WATER REACTOR PLANT LICENSEES

Gentlemen:

SUBJECT: POTENTIAL STEAM GENERATOR RELATED GENERIC REQUIREMENTS

(GENERIC LETTER NO. 82-32)

The NRC staff has identified potential steam generator related generic requirements and is currently subjecting them to a value impact analysis.

A major element of the staff's value Impact will be an analysis being prepaeed by our contractor, Science Applications, Inc. A copy of this draft report is provided for your information and use. This report is currently under staff review and will be modified to consider multiple steam generator tube ruptures in combination with other events along with single tube rupture scenarios.

Any comments you may care to make, either individually or through Owners Groups, on the SAI report and on the probability and consequences of multiple tube rupture scenarios would be considered in the staff's final value impact analysis if they can be provided within 30 days of the date of this letter.

Sincerely, Original signedbV

Darrell G. Eisenhut Darrell G. Elsenhut, Director Division of Licensing Enclosure: 0a ,-

SAI Report

8208190263 ,)

'JP1 ~ '

I 1

^~P.

OFFICE

a )

n...

URNAMwo ...

Th -D.

of.I

....... .Q

....

a.l.i~. ..... I.... .................... ...... ........................ ....... ............................ .....................

~ ....

DATE Ip .1.2JT.I.8 ..i2X2....

...124182 ......... ....1 -- z....... ....... ....... ........... ............. ....... ..... ................... ....... .........................

NRC FORM 318 (10-80) NRCM 0240 O FFICIA L R EC O RD C OP Y USGPO. 1981-335s960

Template:GL-Nav