NRC Generic Letter 1978-24: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 14: | Line 14: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
{{#Wiki_filter:NUCLEAR REGULATORY | {{#Wiki_filter:NUCLEAR REGULATORY COMMISMiON | ||
COMMISMiON | WASHINGTON. D. C. 20655 July 11, 1978 TO ALL POWER REACTOR LICENSEES | ||
WASHINGTON. | Gentlemen: | ||
In order to provide reasonable assurance that the requirements | |||
10 CFR 50 Appendix I are implemented at all nuclear power of the NRC staff has prepared the enclosed Appendix I model facilities, Specifications. These model specifications are intended Technical guidance in the scope and types of required specificationsto provide for each facility in the areas of equipment and administrative requirements including actions we consider appropriate if a limiting condition for operation cannot be met. | |||
The enclosure uses the Standard Technical Specification format blanks or parentheses appearing where the information is with specific. plant We request that you submit a license amendment application incorporate the applicable specifications of the enclosed to into your Appendix "A" Technical Specifications within the guidance of days indicated for your facility in the attachment to number letter. A staggered submittal schedule has been selected this facilitate staff review. The staff considers such an amendment to to be a CLASS III Amendment per 10 CFR 170.22, provided the application is consistent with the enclosed guidance. | |||
If you have any questions on this matter, please contact us. | |||
Sincerely, Brian K. Grimes, Assistant Director for Engineering and Projects Division of Operating Reactors Enclosures: | |||
l. Model Appendix I Technical Specifications | l. Model Appendix I Technical Specifications | ||
2. Submittal Schedule | 2. Submittal Schedule | ||
--Es -n Commonweal th Edison Company cc Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, Chicago, Illinois 60603 | |||
- -Es -n Commonweal th Edison Company cc Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 | |||
Morris Public Library | |||
604 Liberty Street Morris, Illinois 60451}} | |||
{{GL-Nav}} | {{GL-Nav}} | ||
Latest revision as of 01:59, 24 November 2019
| ML031280301 | |
| Person / Time | |
|---|---|
| Issue date: | 07/11/1978 |
| From: | Grimes B Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| GL-78-024 | |
| Download: ML031280301 (2) | |
NUCLEAR REGULATORY COMMISMiON
WASHINGTON. D. C. 20655 July 11, 1978 TO ALL POWER REACTOR LICENSEES
Gentlemen:
In order to provide reasonable assurance that the requirements
10 CFR 50 Appendix I are implemented at all nuclear power of the NRC staff has prepared the enclosed Appendix I model facilities, Specifications. These model specifications are intended Technical guidance in the scope and types of required specificationsto provide for each facility in the areas of equipment and administrative requirements including actions we consider appropriate if a limiting condition for operation cannot be met.
The enclosure uses the Standard Technical Specification format blanks or parentheses appearing where the information is with specific. plant We request that you submit a license amendment application incorporate the applicable specifications of the enclosed to into your Appendix "A" Technical Specifications within the guidance of days indicated for your facility in the attachment to number letter. A staggered submittal schedule has been selected this facilitate staff review. The staff considers such an amendment to to be a CLASS III Amendment per 10 CFR 170.22, provided the application is consistent with the enclosed guidance.
If you have any questions on this matter, please contact us.
Sincerely, Brian K. Grimes, Assistant Director for Engineering and Projects Division of Operating Reactors Enclosures:
l. Model Appendix I Technical Specifications
2. Submittal Schedule
- -Es -n Commonweal th Edison Company cc Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450
Morris Public Library
604 Liberty Street Morris, Illinois 60451