ML062430604: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITE D STA TES  NUCL EA R RE GULA TORY C OMMIS SI ON    REGION I 475 AL LENDAL E ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-141 5 August 31, 2006 Mr. Christo pher M. C rane President and CEO AmerGen Energy C ompany, LLC 200 Ex elon Way, KSA 3-E Kennett Square, P A 19348 SUB JEC T: MID-CYCLE PERFORMANCE REVIEW AND INSPECTI ON PLAN - THREE MIL E IS LAN D UN IT 1 Dear Mr. C rane: On Augus t 9, 20 06, the NRC s taff compl eted i ts perfor mance r evie w of Thr ee M ile I sland Unit 1 for the first half of the cal endar year 2006 assessment cycle. Our technical s taff reviewed performance indica tors (PIs) for the most rec ent quarter and i nspection resu lts over the previous twelve months. The purpo se of this letter is to inform yo u of our assessment of your safet y perfo rmanc e during this peri od and our plans fo r fut ure inspe ctions a t your f acility.This performance rev iew and enclosed i nspection pl an do not i nclude phy sical protec tion information. A separat e letter designated and mar ked as "Exempt from Public Disclosure in accordance w ith 10 CFR 2.390" wi ll incl ude the phy sical protec tion revi ew and re sultant inspe ction plan. Plant performance for the most recent quarter at Three Mil e Island Un it 1 was within the Licensee R esponse col umn of the NRC' s Action M atrix, based on all i nspection findi ngs being class ified as hav ing v ery l ow sa fety si gnifica nce (Gre en) an d all PIs i ndica ting pe rformance at a level re quiring no addi tional NR C oversight (Gree n). Therefore, we p lan to condu ct the standa rd reac tor over sight process (ROP) ba seline insp ections at your f acility.The enclosed inspection plan detai ls the insp ections, les s those relate d to physi cal protectio n, scheduled th rough March 3 1, 2008. The i nspection pl an is prov ided to al low for the re solution of any schedu ling conflicts and personnel availa bility issues w ell in a dvance of in spector arriv al onsit e. Rou tine r eside nt ins pecti ons ar e not l isted due to their ongoi ng and conti nuous nature. The inspection s in the l ast nine months of the inspecti on plan are tentative and may be revised at th e end-of-cycle revie w.In accordance w ith 10 CFR 2.390 of the NR C's "Rules and Practice s," a copy o f this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or fr om the Publicly Available Records (PARS) component of NRC's document syste m (ADAMS).
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
ADAMS is accessi ble from the NRC Website at http://w ww.nrc.gov/readi ng-rm/ada ms.html (The Pu blic Elec tronic Readi ng Room).
 
C. M. Cran e 2 If circu mstance s aris e wh ich ca use us to cha nge the insp ectio n pla n, we wil l con tact y ou to discuss the c hange as soon as possibl
==SUBJECT:==
: e. Please contact me at 610
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND UNIT 1
-337-5200 w ith any questio ns yo u may have regardi ng this lette r or the insp ectio n pla n. Sincere ly,/R A/Ronald R.
 
Bellamy, Chief Reactor Projects Branch 7 Divi sion of Reac tor Pro jects Docket No. 50-28 9 License No. DPR-50  
==Dear Mr. Crane:==
 
On August 9, 2006, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the standard reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
 
C. M. Crane                                    2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                              /RA/
Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No. 50-289 License No. DPR-50


==Enclosure:==
==Enclosure:==
Thre e Mile Island, Uni t 1 Inspection
Three Mile Island, Unit 1 Inspection/ Activity Plan cc w/encl:
/ Activity Plan cc w/encl:
Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)
Chief Operating Officer, AmerGen Site Vice President - TM I Unit 1, AmerGen Plant M anager - TMI, Uni t 1, AmerGen Regulatory A ssurance M anager - TMI, Uni t 1, AmerGen Senior Vi ce President - Nuclear Se rvices, AmerGen Vice Presi dent - Mi d-Atlantic Ope rations, AmerGen Vice Presi dent - Operation s Support, AmerGen Vice Presi dent - Licens ing and Regula tory Affairs, AmerGen Director Lice nsing - AmerGen Manager Li censing - TMI, A merGen Vice Presi dent - General Counsel an d Secretary, AmerGen T. O'Neill, A ssociate Genera l Counsel , Exelon Generation Compa ny J. Fewell , Esq., Assistant Gen eral Counse l, Exelo n Nuclear Correspondence Control De sk - AmerGen Chair man, Bo ard of C ounty Commis sione rs of Da uphin Count y Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, Na tional Ene rgy Committee E. Epstein, TMI-Alert (TMIA)
D. Allard, PADEP
D. Allard, PADEP C. M. Cran e 3 Distribution w/encl:
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP D. Kern, DRP , Senior Re sident Inspecto r J. Brand, DRP , Resident In spector TMI Re siden t OA B. Sos a, RI OE DO  R. Laufer, NRR F. Saba, PM, NRR DRS Directo r, Region I DRS Deputy Director, Regi on I DRS Branch Chiefs (6)
RidsNrrDip mIipb@nrc.gov Instit ute of N uclea r Pow er Oper ation s (INP O)Region I Docket R oom (with c oncurrences)
SUNSI Rev iew Complete: ____RRB_
______  (Rev iewer's Initials)
D O C U M EN T NA M E:  S:\R O P 7 M id C ycle Re vie w\2 00 6 R O P7 M id-C ycle Le tter s\T M I 20 06 M id-C ycle Lett er.wpd To re ceive a cop y of thi s docu ment, i ndicat e in t he box:  " C" = Copy w ithout attachment/enclo sure  " E" = Copy w ith attachment/enclosur e  " N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/06 8/29/06 OFFICIAL RECORD COPY


Three Mile Island 1 Inspection / Activity Plan 07/01/2006
C. M. Crane                                                  3 Distribution w/encl:
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:45:53 Report 22 3 MODS-MODS AND 50.59 Baseline Inspections 07/24/2006 07/28/2006 1     7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 07/24/2006 07/28/2006 1     7111117B IP Permanent Plant Modifications 2 71114-EP PRGM INSP & PI VERIFICATION Baseline Inspections 07/17/2006 07/21/2006 1     7111402 IP Alert and Notification System Testing Baseline Inspections 07/17/2006 07/21/2006 1     7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/17/2006 07/21/2006 1     7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/17/2006 07/21/2006 1     7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/17/2006 07/21/2006 1     71151 IP Performance Indicator Verification 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections 08/28/2006 09/01/2006 1     7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 2 TI-169-MSPI VERIFICATION Safety Issues 09/01/2006 11/15/2006 1     2515/169 IP Mitigating Systems Performance Index Verification 1 71121-OCC RAD PROT Baseline Inspections 11/06/2006 11/10/2006 1     7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/06/2006 11/10/2006 1     7112102 IP ALARA Planning and Controls Baseline Inspections 11/06/2006 11/10/2006 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/06/2006 11/10/2006 1     71151 IP Performance Indicator Verification 7 7111121-CDBI (COMPONENT DESIGN BASES INSPECTION)
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP D. Kern, DRP, Senior Resident Inspector J. Brand, DRP, Resident Inspector TMI Resident OA B. Sosa, RI OEDO R. Laufer, NRR F. Saba, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (6)
Baseline Inspections 01/08/2007 01/12/2007 1     7111121 IP Component Design Bases Inspection Baseline Inspections 01/22/2007 01/26/2007 1     7111121 IP Component Design Bases Inspection Baseline Inspections 02/05/2007 02/09/2007 1     7111121 IP Component Design Bases Inspection Baseline Inspections 02/12/2007 02/16/2007 1    7111121 IP Component Design Bases Inspection 5 7111111B-L.O. REQUAL. PROG. + P/F REVIEW Baseline Inspections 02/19/2007 02/23/2007 1     7111111B IP Licensed Operator Requalification Program Baseline Inspections 02/26/2007 03/02/2007 1    7111111B IP Licensed Operator Requalification Program 1 7111112-MAINTENANCE RULE INSP Baseline Inspections 02/26/2007 03/02/2007 1    7111112B IP Maintenance Effectiveness 3 4/23+EXM-OPERATOR LICENSING INITIAL EXAMS Not Applicable 03/26/2007 03/30/2007 1     U01603 TMI INITIAL EXAM (6/07)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
Not Applicable 04/23/2007 05/04/2007 1    U01603 TMI INITIAL EXAM (6/07) 1 71121-OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1     7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1     7112102 IP ALARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
Region I Docket Room (with concurrences)
SUNSI Review Complete: ____RRB_______ (Reviewers Initials)
DOCUMEN T NA ME: S :\ROP 7 Mid C ycle Re view\2 006 R OP7 Mid-Cycle Letters\T MI 2006 Mid-Cycle Letter.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE          RI/DRP                        RI/DRP NAME            ARosebrook/AAR                RBellamy/RRB DATE            7/31/06                      8/29/06 OFFICIAL RECORD COPY
 
Page 1 of 2                                                                                Three Mile Island 1 08/31/2006    09:45:53                                                                Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit                                                                                                                            No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                  Title                                            on Site       Start    End              Type MODS           - MODS AND 50.59                                                                                             3 1             IP 7111102               Evaluation of Changes, Tests, or Experiments                                                           07/24/2006 07/28/2006 Baseline Inspections 1             IP 7111117B             Permanent Plant Modifications                                                                         07/24/2006  07/28/2006 Baseline Inspections 71114         - EP PRGM INSP & PI VERIFICATION                                                                             2 1             IP 7111402               Alert and Notification System Testing                                                                 07/17/2006 07/21/2006 Baseline Inspections 1             IP 7111403               Emergency Response Organization Augmentation Testing                                                   07/17/2006 07/21/2006 Baseline Inspections 1             IP 7111404               Emergency Action Level and Emergency Plan Changes                                                     07/17/2006 07/21/2006 Baseline Inspections 1             IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                                       07/17/2006 07/21/2006 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                                     07/17/2006  07/21/2006 Baseline Inspections 7112203       - PUB RAD SAFETY - REMP                                                                                       1 1             IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program         08/28/2006  09/01/2006 Baseline Inspections TI-169         - MSPI VERIFICATION                                                                                           2 1             IP 2515/169             Mitigating Systems Performance Index Verification                                                     09/01/2006 11/15/2006 Safety Issues 71121          - OCC RAD PROT                                                                                                1 1             IP 7112101               Access Control to Radiologically Significant Areas                                                     11/06/2006 11/10/2006 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                                           11/06/2006 11/10/2006 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                         11/06/2006 11/10/2006 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                                     11/06/2006  11/10/2006 Baseline Inspections 7111121       - CDBI (COMPONENT DESIGN BASES INSPECTION)                                                                   7 1              IP 7111121              Component Design Bases Inspection                                                                      01/08/2007 01/12/2007 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                     01/22/2007 01/26/2007 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                     02/05/2007 02/09/2007 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                     02/12/2007 02/16/2007 Baseline Inspections 7111111B       - L.O. REQUAL. PROG. + P/F REVIEW                                                                             5 1              IP 7111111B              Licensed Operator Requalification Program                                                              02/19/2007 02/23/2007 Baseline Inspections 1             IP 7111111B             Licensed Operator Requalification Program                                                             02/26/2007 03/02/2007 Baseline Inspections 7111112       - MAINTENANCE RULE INSP                                                                                       1 1              IP 7111112B              Maintenance Effectiveness                                                                              02/26/2007 03/02/2007 Baseline Inspections 4/23+EXM       - OPERATOR LICENSING INITIAL EXAMS                                                                           3 1                U01603                TMI INITIAL EXAM (6/07)                                                                                03/26/2007 03/30/2007 Not Applicable 1                 U01603               TMI INITIAL EXAM (6/07)                                                                               04/23/2007 05/04/2007 Not Applicable 71121         - OCC RAD SAFETY                                                                                             1 1             IP 7112101               Access Control to Radiologically Significant Areas                                                     03/05/2007 03/09/2007 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                                           03/05/2007 03/09/2007 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                         03/05/2007  03/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Three Mile Island 1 Inspection / Activity Plan 07/01/2006
 
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:45:53 Report 22 4 7111401-EP EXERCISE & PI VERIFICATION Baseline Inspections 04/16/2007 04/20/2007 1     7111401 IP Exercise Evaluation Baseline Inspections 04/16/2007 04/20/2007 1     71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/16/2007 04/20/2007 1     71151-EP02 IP ERO Drill Participation Baseline Inspections 04/16/2007 04/20/2007 1     71151-EP03 IP Alert & Notification System 1 7112201-PUB RAD PROT - RETS Baseline Inspections 05/14/2007 05/18/2007 1     7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 7112202-PUB RAD SAFETY - RADWASTE Baseline Inspections 08/20/2007 08/24/2007 1    7112202 IP Radioactive Material Processing and Transportation 1 71121-OCC RAD SAFETY Baseline Inspections 10/01/2007 10/05/2007 1     7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 1     7112102 IP ALARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 7111108P-IN-SERVICE INSPECTION Baseline Inspections 10/30/2007 11/02/2007 1     7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 11/13/2007 11/16/2007 1    7111108P IP Inservice Inspection Activities - PWR 2 7111107-HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1    7111107B IP Heat Sink Performance 1 71121-OCC RAD SAFETY Baseline Inspections 11/05/2007 11/09/2007 1     7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1     7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 TI-166-CONTAINMENT SUMP MODIFICATIONS Safety Issues 11/12/2007 11/19/2007 1     2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
Page 2 of 2                                                                                Three Mile Island 1 08/31/2006    09:45:53                                                                Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit                                                                                                                  No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                  Title                                  on Site         Start    End              Type 7111401       - EP EXERCISE & PI VERIFICATION                                                                     4 1             IP 7111401               Exercise Evaluation                                                                           04/16/2007 04/20/2007 Baseline Inspections 1             IP 71151-EP01           Drill/Exercise Performance                                                                   04/16/2007 04/20/2007 Baseline Inspections 1             IP 71151-EP02           ERO Drill Participation                                                                       04/16/2007 04/20/2007 Baseline Inspections 1             IP 71151-EP03           Alert & Notification System                                                                   04/16/2007  04/20/2007 Baseline Inspections 7112201       - PUB RAD PROT - RETS                                                                               1 1             IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                     05/14/2007  05/18/2007 Baseline Inspections 7112202       - PUB RAD SAFETY - RADWASTE                                                                         1 1              IP 7112202              Radioactive Material Processing and Transportation                                            08/20/2007 08/24/2007 Baseline Inspections 71121         - OCC RAD SAFETY                                                                                     1 1             IP 7112101               Access Control to Radiologically Significant Areas                                           10/01/2007 10/05/2007 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                                   10/01/2007 10/05/2007 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                 10/01/2007  10/05/2007 Baseline Inspections 7111108P       - IN-SERVICE INSPECTION                                                                             1 1              IP 7111108P              Inservice Inspection Activities - PWR                                                        10/30/2007 11/02/2007 Baseline Inspections 1             IP 7111108P             Inservice Inspection Activities - PWR                                                         11/13/2007 11/16/2007 Baseline Inspections 7111107       - HEAT SINK INSP                                                                                     2 1              IP 7111107B              Heat Sink Performance                                                                        11/05/2007 11/09/2007 Baseline Inspections 71121         - OCC RAD SAFETY                                                                                     1 1             IP 7112101               Access Control to Radiologically Significant Areas                                           11/05/2007 11/09/2007 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                                   11/05/2007 11/09/2007 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                 11/05/2007 11/09/2007 Baseline Inspections TI-166        - CONTAINMENT SUMP MODIFICATIONS                                                                    1 1              IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]             11/12/2007 11/19/2007 Safety Issues 71121          - OCC RAD SAFETY                                                                                    1 1             IP 7112101               Access Control to Radiologically Significant Areas                                           12/03/2007 12/07/2007 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                                   12/03/2007 12/07/2007 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                 12/03/2007 12/07/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                           12/03/2007  12/07/2007 Baseline Inspections 71121         - OCC RAD SAFETY                                                                                     1 1             IP 7112101               Access Control to Radiologically Significant Areas                                           03/03/2008 03/09/2008 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                                   03/03/2008 03/09/2008 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                 03/03/2008  03/09/2008 Baseline Inspections 71152B         - PI&R                                                                                               4 1              IP 71152B                Identification and Resolution of Problems                                                    03/31/2008 04/04/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
1 71121-OCC RAD SAFETY Baseline Inspections 12/03/2007 12/07/2007 1     7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/03/2007 12/07/2007 1     7112102 IP ALARA Planning and Controls Baseline Inspections 12/03/2007 12/07/2007 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/03/2007 12/07/2007 1     71151 IP Performance Indicator Verification 1 71121-OCC RAD SAFETY Baseline Inspections 03/03/2008 03/09/2008 1     7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/03/2008 03/09/2008 1     7112102 IP ALARA Planning and Controls Baseline Inspections 03/03/2008 03/09/2008 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4 71152B-PI&R Baseline Inspections 03/31/2008 04/04/2008 1    71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Revision as of 14:31, 23 November 2019

Mid-cycle Performance Report and Inspection Plan - Three Mile Island Unit 1
ML062430604
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/31/2006
From: Ronald Bellamy
NRC/RGN-I/DRP/PB7
To: Crane C
AmerGen Energy Co
bellamy r r
References
Download: ML062430604 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND UNIT 1

Dear Mr. Crane:

On August 9, 2006, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the standard reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

C. M. Crane 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No. 50-289 License No. DPR-50

Enclosure:

Three Mile Island, Unit 1 Inspection/ Activity Plan cc w/encl:

Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)

D. Allard, PADEP

C. M. Crane 3 Distribution w/encl:

S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP D. Kern, DRP, Senior Resident Inspector J. Brand, DRP, Resident Inspector TMI Resident OA B. Sosa, RI OEDO R. Laufer, NRR F. Saba, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (6)

RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)

Region I Docket Room (with concurrences)

SUNSI Review Complete: ____RRB_______ (Reviewers Initials)

DOCUMEN T NA ME: S :\ROP 7 Mid C ycle Re view\2 006 R OP7 Mid-Cycle Letters\T MI 2006 Mid-Cycle Letter.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/06 8/29/06 OFFICIAL RECORD COPY

Page 1 of 2 Three Mile Island 1 08/31/2006 09:45:53 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MODS - MODS AND 50.59 3 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 07/24/2006 07/28/2006 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 07/24/2006 07/28/2006 Baseline Inspections 71114 - EP PRGM INSP & PI VERIFICATION 2 1 IP 7111402 Alert and Notification System Testing 07/17/2006 07/21/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 07/17/2006 07/21/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/17/2006 07/21/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/17/2006 07/21/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/17/2006 07/21/2006 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/28/2006 09/01/2006 Baseline Inspections TI-169 - MSPI VERIFICATION 2 1 IP 2515/169 Mitigating Systems Performance Index Verification 09/01/2006 11/15/2006 Safety Issues 71121 - OCC RAD PROT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/06/2006 11/10/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/06/2006 11/10/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/06/2006 11/10/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/06/2006 11/10/2006 Baseline Inspections 7111121 - CDBI (COMPONENT DESIGN BASES INSPECTION) 7 1 IP 7111121 Component Design Bases Inspection 01/08/2007 01/12/2007 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 01/22/2007 01/26/2007 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 02/05/2007 02/09/2007 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 02/12/2007 02/16/2007 Baseline Inspections 7111111B - L.O. REQUAL. PROG. + P/F REVIEW 5 1 IP 7111111B Licensed Operator Requalification Program 02/19/2007 02/23/2007 Baseline Inspections 1 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections 7111112 - MAINTENANCE RULE INSP 1 1 IP 7111112B Maintenance Effectiveness 02/26/2007 03/02/2007 Baseline Inspections 4/23+EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01603 TMI INITIAL EXAM (6/07) 03/26/2007 03/30/2007 Not Applicable 1 U01603 TMI INITIAL EXAM (6/07) 04/23/2007 05/04/2007 Not Applicable 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/05/2007 03/09/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/05/2007 03/09/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/05/2007 03/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Three Mile Island 1 08/31/2006 09:45:53 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111401 - EP EXERCISE & PI VERIFICATION 4 1 IP 7111401 Exercise Evaluation 04/16/2007 04/20/2007 Baseline Inspections 1 IP 71151-EP01 Drill/Exercise Performance 04/16/2007 04/20/2007 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 04/16/2007 04/20/2007 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 04/16/2007 04/20/2007 Baseline Inspections 7112201 - PUB RAD PROT - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/14/2007 05/18/2007 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 08/20/2007 08/24/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/01/2007 10/05/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/01/2007 10/05/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/01/2007 10/05/2007 Baseline Inspections 7111108P - IN-SERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/30/2007 11/02/2007 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 11/13/2007 11/16/2007 Baseline Inspections 7111107 - HEAT SINK INSP 2 1 IP 7111107B Heat Sink Performance 11/05/2007 11/09/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/05/2007 11/09/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/05/2007 11/09/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/05/2007 11/09/2007 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/12/2007 11/19/2007 Safety Issues 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/03/2007 12/07/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/03/2007 12/07/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/03/2007 12/07/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/03/2007 12/07/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/03/2008 03/09/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/03/2008 03/09/2008 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/03/2008 03/09/2008 Baseline Inspections 71152B - PI&R 4 1 IP 71152B Identification and Resolution of Problems 03/31/2008 04/04/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.